Home / Browse projects / Aurangabad, Maharashtra / Sara Angan Phase-1 A1 -B1 Type Building
Sara Angan Phase-1 A1 -B1 Type Building
RG-MH-15457 · RERA P51500049187 · Last updated on MahaRERA portal: 8 Sep 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 1 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 11 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Sara Angan Phase-1 A1 -B1 Type Building is a Residential / Group Housing project by Sara Infrastructures in Aurangabad, Maharashtra, registered with MahaRERA as P51500049187 on 3 Feb 2023. The registration is recorded completed; possession was promised by 31 Dec 2025.
At a glance
Project
- NameSara Angan Phase-1 A1 -B1 Type Building
- TypeResidential / Group Housing
- Location
- varud kazi road
- Gangapur jahagir
- Aurangabad
- 431007
- Pincode431007
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51500049187
- ReraGenie IDRG-MH-15457
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on3 Feb 2023
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings2 building records
- Documents filed59 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A1 TYPE BUILDING | NA | 2 | 0 | 0 | 0 | 0 |
| B1 TYPE BUILDING | NA | 2 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 8 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
17 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 90%.
A1 TYPE BUILDING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
B1 TYPE BUILDING88%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities15
As on 8 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Amol Kshirsagar |
| Engineer | Amol Kshirsagar |
| Chartered Accountant | yougesh Agrawal |
| Partner | Role in project |
|---|---|
| Sara Infrastructures | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 12 Jan 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 12 Jan 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 Jan 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed59
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Sara Angan Phase-1 A1 Form-1 June 25.pdf | 8 Sep 2025 |
| Form 2File: Sara Angan Phase-1 A1 Form-2 June 25.pdf | 8 Sep 2025 |
| Form 3File: Sara Angan Phase-1 A1 Form-3 Declararion June 25.pdf | 8 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Sara Angan Phase-1 A1 Sold June 25.pdf | 8 Sep 2025 |
| Occupational CertificateFile: A1 and b1 Occupancy.pdf | 8 Sep 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sara Angan Ph-1_ March-24.pdf | 30 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sara Angan Ph-1_ June-24.pdf | 30 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sara Angan Ph-1_ Sept-24.pdf | 30 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sara angan Ph-1_ March-24.pdf | 30 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sara angan Ph-1_ June-24.pdf | 30 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sara angan Ph-1_ Sept-24.pdf | 30 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sara Angan Ph-1_ March-24.pdf | 30 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sara Angan Ph-1_ June-24.pdf | 30 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sara Angan Ph-1_ Sept-24.pdf | 30 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Sara Angan Ph-1_ June-24.pdf | 30 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Declaration.pdf | 21 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archi_ Certficate _ Angan.pdf | 13 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng_ Certficate _ Angan.pdf | 13 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sara Angan A1 B1.pdf | 6 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: SARA ANGAN.pdf | 20 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: P51500049187 Angan Phase 1, A1 B1 Type.pdf | 14 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 6 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate (1).pdf | 6 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch MArch 2023.pdf | 22 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch June 2023.pdf | 22 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 2023.pdf | 22 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 2023.pdf | 22 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2a.pdf | 22 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3 Sara infra march.pdf | 22 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: june From 3- sara infra .pdf | 22 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: SARA ANGAN A AND B MARCH .pdf | 21 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: sara angan a and B June .pdf | 21 Sep 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf | 25 Jan 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank New.pdf | 25 Jan 2023 |
| Details of encumbrances concerned to FinanceFile: NO LEGAL.pdf | 24 Jan 2023 |
| Details of encumbrances concerned to LegalFile: NO LEGAL.pdf | 24 Jan 2023 |
| Declaration about Commencement CertificateFile: Declaration About Commencement Certificate .pdf | 18 Jan 2023 |
| CERSAI detailsFile: CERSAI Search .pdf | 17 Jan 2023 |
| Layout approvalFile: lay out permission Letter.pdf | 12 Jan 2023 |
| Layout approvalFile: LAYOUT Permission Plan .pdf | 12 Jan 2023 |
| Building plan approvalFile: Building Plan -1.pdf | 12 Jan 2023 |
| Building plan approvalFile: Building Plan -2.pdf | 12 Jan 2023 |
| Building plan approvalFile: Building Plan -3.pdf | 12 Jan 2023 |
| PAN CardFile: Pan Card.pdf | 12 Jan 2023 |
| Copy of the legal title reportFile: Search Report.pdf | 12 Jan 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrance .pdf | 12 Jan 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance .pdf | 12 Jan 2023 |
| Copy of Layout Approval (in case of layout)File: lay out permission Letter.pdf | 12 Jan 2023 |
| Copy of Layout Approval (in case of layout)File: LAYOUT Permission Plan .pdf | 12 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan -1.pdf | 12 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan -2.pdf | 12 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan -3.pdf | 12 Jan 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 12 Jan 2023 |
| Declaration in FORM BFile: Form b.pdf | 12 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 12 Jan 2023 |
| Proforma of Agreement for saleFile: RERA Agreement Annexure .pdf | 12 Jan 2023 |
| Proforma of Allotment letterFile: Model of allotment letter_compressed.pdf | 12 Jan 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation About Allotment letter.pdf | 12 Jan 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation About Agreement to sale .pdf | 12 Jan 2023 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SARA AAKRUTI | WADGAON-K BAJAJNAGAR AURANGABAD | 211 | Completed | Aug 2016 | Aug 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Aurangabad
Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 11 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 59 filed documents as one ZIP, foldered, with a manifest
Keep Sara Angan Phase-1 A1 -B1 Type Building on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Gangapur jahagir1,400+ in Aurangabad
Filed coordinates, straight-line distance. 8 registered projects within 2 km.
PMAY U Sundarwadi 10
Aurathrone Infra
PMAY U Sundarwadi 9
Aurathrone Infra
SECTOR 41
MANISH RAMNIRANJAN AGRAWAL AND AMITABH CHA
AURA SQUARE - KALYAN HEIGHTS
KALYAN HEIGHTS
URBAN AMBITION
MANISH RAMNIRANJAN AGRAWAL
Hrim Ssky City Phase V
Ashok Baheti
See every Aurangabad project, with the district possession charts
Builder: Sara Infrastructures
Sara Infrastructures has 12 registrations on MahaRERA, including SARA SWAPNANGAN - ROW HOUSES and SARA SWAPNANGAN - A4, A5, A6 BUILDINGS. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Aurangabad district page.
Frequently asked questions
What are my rights if Sara Angan Phase-1 A1 -B1 Type Building is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Sara Angan Phase-1 A1 -B1 Type Building?
The registered promoter entity is Sara Infrastructures, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Sara Angan Phase-1 A1 -B1 Type Building?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Sara Angan Phase-1 A1 -B1 Type Building?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Sara Angan Phase-1 A1 -B1 Type Building?
The professionals named in the filing: Architect: Amol Kshirsagar; Engineer: Amol Kshirsagar; Chartered Accountant: yougesh Agrawal. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Sara Angan Phase-1 A1 -B1 Type Building?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback