Home / Browse projects / Pune, Maharashtra / SAPTASAJAI AANGAN PHASE I

Registration lapsed No litigation declared Residential / Group Housing project

SAPTASAJAI AANGAN PHASE I

By GANDHARVA LANDMARK

RG-MH-15230 · RERA P52100023529 · Last updated on MahaRERA portal: 18 May 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 22 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2024Possession promised22 months past this date
8 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 95%
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

SAPTASAJAI AANGAN PHASE I is a Residential / Group Housing project by GANDHARVA LANDMARK in Pune, Maharashtra, registered with MahaRERA as P52100023529 on 18 Dec 2019. Possession was promised by 30 Dec 2024 and is now 22 months past that date.

At a glance

Project

  • NameSAPTASAJAI AANGAN PHASE I
  • TypeResidential / Group Housing
  • Location
    • PUNE SOLAPUR ROAD
    • PUNE
    • Kadamwak Wasti
    • Haveli
    • 412201
  • Pincode412201
  • RERA no.P52100023529
  • ReraGenie IDRG-MH-15230

Builder

  • NameGANDHARVA LANDMARK
  • Entity typePartnership
  • PartnerSACHIN GULAB KAMTHE
  • Other registrations1 more →
  • No longer live2 lapsed, de-registered or revoked

Key dates

22 months past promisethis monthRegisteredDec 2019PromisedDec 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on18 Dec 2019
  • Promised completion30 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed74 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAPTASAJAI AANGAN BUILDING ANA120000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 May 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.

SAPTASAJAI AANGAN BUILDING A: 90% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 18 May 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes85%
Landscaping & Tree PlantingYes45%
Street LightingYes0%
Community BuildingsYes97%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes85%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,900 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
MADHUKAR MURLIDHAR KADAMKadamwak WastiPune
SMT SHASHIKALA VASANTKadamwak WastiPune
DNYANESHWAR TRIMBAK KADAMKadamwak WastiPune

Approvals and building plan

Permissible FSI7496.92
Proposed, not sanctioned5,766 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchS NO 207 HADAPSAR SASWAD ROAD FURSUNGI PUNE

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAtit Admulwar
EngineerMiss komal Gonjari
Chartered AccountantCA J P Randive
PartnerRole in project
GANDHARVA LANDMARK-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Nov 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Nov 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 17 May 2024

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM -3 - March 2024.pdf18 May 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Form-4 - Architect Certificate.pdf17 May 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate A Bldg.pdf17 May 2024
Layout approvalFile: Revised Sanctioned Plan.pdf5 Mar 2024
Copy of Layout Approval (in case of layout)File: Revised Sanctioned Plan.pdf5 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: Declartion about Commencement Certificate.pdf1 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate -Dec 2023.pdf1 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Dec 2023.pdf1 Mar 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-unsold.pdf1 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Dec 2023.pdf1 Mar 2024
Declaration about Commencement CertificateFile: Declration About Commencement Certificate.pdf29 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - March 2022.pdf29 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - March 2023.pdf29 Dec 2023
Disclosure of sold/ booked inventoryFile: Disclosur about Sold Unsold.pdf29 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - 2022-23.pdf29 Dec 2023
Other - LegalFile: Consent for Project Extention.pdf29 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1.pdf9 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2.pdf9 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 - CA certificate.pdf9 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Dec 22.pdf3 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate- March 2023.pdf3 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate June 2023 - I.pdf3 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineeing Certificate Dec 22.pdf3 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate March 2023.pdf3 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engieering Certificate.pdf3 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate -DEC 2022.pdf3 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate - March 2023.pdf3 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf3 Nov 2023
Details of encumbrances concerned to FinanceFile: Legal Encumbarance.pdf20 Jan 2023
Details of encumbrances concerned to LegalFile: Legal Encumbarance.pdf20 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf20 Jan 2023
Proforma of Agreement for saleFile: 1 Proforma of Allotment letter.pdf20 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf20 Jan 2023
Deviation Report with respect to Allotment letterFile: Deviaation report AL.pdf20 Jan 2023
Deviation Report with respect to model copy of AgreementFile: Deviation report AFS.pdf20 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf20 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Certificate Sept 22_1mb.pdf20 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA cartificate_1mb.pdf20 Sep 2022
Details of encumbrancesFile: No Encumbarance cert.pdf15 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate -June 2022.pdf12 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architechs Certificate.pdf11 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architechs Certificate.pdf11 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Architect's Certificate.pdf11 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate_.pdf11 Jul 2022
Declaration about Commencement CertificateFile: RERA Declaration Format - D.pdf29 Jun 2022
Layout approvalFile: 1.pdf27 Jun 2022
Copy of Layout Approval (in case of layout)File: 1.pdf27 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate.pdf27 Jun 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - FY 2021-22.pdf2 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate March 22.pdf30 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate March 22_compressed.pdf30 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate March 2022_compressed.pdf30 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Architect's Certificate.pdf24 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate Dec 21.pdf17 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate DEC 21_.pdf17 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form -5 FY 19-20.pdf29 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form -5 FY 20-21.pdf29 Sep 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - March 21.pdf13 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engg Certificate March 21.pdf13 Sep 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate March 21.pdf13 Sep 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Sept 20.pdf3 Sep 2020
Layout approvalFile: Sanction Plan 1.pdf16 Nov 2019
Building plan approvalFile: NA Order.pdf16 Nov 2019
PAN CardFile: Pancard.pdf16 Nov 2019
Copy of the legal title reportFile: Title Report.pdf16 Nov 2019
Details of encumbrancesFile: no encumbrance certificate for rera.pdf16 Nov 2019
Copy of Layout Approval (in case of layout)File: Sanction Plan 1.pdf16 Nov 2019
Building Plan Approval / NA Order for plotted developmentFile: NA Order.pdf16 Nov 2019
Commencement Certificates / NA Order for plotted developmentFile: PMRDA vikas parwangi patr.pdf16 Nov 2019
Declaration in FORM BFile: FORM B.pdf16 Nov 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architechs Certificate.pdf16 Nov 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf16 Nov 2019
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf16 Nov 2019
Proforma of Allotment letterFile: Gandharv Landmark Ph-I Draft.pdf16 Nov 2019

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAPTASAJAI AANGAN PHASE I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PUNE13,700+ in Pune

Builder: GANDHARVA LANDMARK

GANDHARVA LANDMARK has 2 registrations on MahaRERA, including SAPTASAJAI AANGAN PHASE I and SAPTASAJAI AANGAN PHSE II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that SAPTASAJAI AANGAN PHASE I shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SAPTASAJAI AANGAN PHASE I is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAPTASAJAI AANGAN PHASE I?

The registered promoter entity is GANDHARVA LANDMARK, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAPTASAJAI AANGAN PHASE I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAPTASAJAI AANGAN PHASE I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAPTASAJAI AANGAN PHASE I?

The professionals named in the filing: Architect: Atit Admulwar; Engineer: Miss komal Gonjari; Chartered Accountant: CA J P Randive. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAPTASAJAI AANGAN PHASE I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAPTASAJAI AANGAN PHASE I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAPTASAJAI AANGAN PHASE I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.