Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 39 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 39 months from the original
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 78%
66 of 134Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 144 documents Report an error

SAPTARSHI MARK is a Residential / Group Housing project by Saptrishi Realtors in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800017508 on 23 Aug 2018. Possession is promised by 31 Mar 2027. The completion date has moved by 39 months from the original filing. 68 of the 134 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSAPTARSHI MARK
  • TypeResidential / Group Housing
  • Location
    • S.G. Barve Road
    • Nehru Nagar
    • Kurla
    • Mumbai Suburban
    • 400024
  • Pincode400024
  • RERA no.P51800017508
  • ReraGenie IDRG-MH-76531

Builder

  • NameSaptrishi Realtors
  • Entity typePartnership
  • PartnersAmit Avinash Parab, Abhay Avinash Parab, Prasad Murlidhar Chindarkar, Vital Vijay Takatrao, Anant Jagannath Talawdekar
  • Other registrations2 more →
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2018First promiseDec 2023Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Aug 2018
  • Promised completion31 Mar 2027
  • Revised completionRevised to 31 Mar 2027 (originally 30 Dec 2023)
  • Buildings1 building record
  • Documents filed144 files

Current status

51%68 of 134 units booked
51.1%Work done, per cost certificate

Figures as on 3 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAPTARSHI MARKNA19191340134

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 78%.

SAPTARSHI MARK: 52% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure78%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises27%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks48%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.17%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 3 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed33

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots33
Closed/Covered32
Open Space1

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area821 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on27 Mar 2026

Approvals and building plan

Sanctioning authorityBuilding Permission Cell, Greater Mumbai / MHADA
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBandra east
Estimated costRs 86.23 cr
Cost incurredRs 44.06 cr
Work done51.1%
BuildingWingEstimatedIncurred
SAPTARSHI MARKNARs 51.41 crRs 23.24 cr
-NARs 34.82 crRs 20.83 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShelter Associates
EngineerPrathemesh Kirve
Chartered AccountantRavindra Karandikar
Chartered AccountantMadhv & Associates Chartered Accountants
PartnerRole in project
Saptrishi Realtors-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800018743Dec 2023 → Dec 2024

Reason as filed by the promoterAs per the attachment

EXT51800025951Dec 2023 → Dec 2025

Reason as filed by the promoterAs per attachment

EA01042620519Dec 2023 → Mar 2027

Reason as filed by the promoterWe are applying order bearing number 40/2022 dated 22nd December 2022 issued by the Maharashtra Real Estate Regulatory Authority(MahaRERA)” that is extension without consent

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000292251SUVARNA SHANKAR SURYAWANSHIMS SAPTRISHI REALOTRS10/08/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Jun 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Feb 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Aug 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed144

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 144 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Annexure A Form 1.pdf3 Jun 2026
Withdrawal Update Form 2File: Engineers certificate saptarshi mark.pdf3 Jun 2026
Withdrawal Update Form 3File: CA Certificate_organized.pdf3 Jun 2026
Form 1File: Architect Certificat 1oct 2025 31 dec 2025 Mark 31.pdf20 Feb 2026
Form 2File: Engineer Certificat 31122025 Mark 31.pdf20 Feb 2026
Form 3File: CA Certificat 31 dec 2025 Mark 31.pdf20 Feb 2026
Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD Mark 17-02-2026.pdf20 Feb 2026
Form 5 (FY 2024-2025)File: FORM 5 Mark 31.pdf20 Feb 2026
Form 2A (FY 2019-2020)File: March 20.pdf26 Dec 2025
Form 2A (FY 2020-2021)File: March 21.pdf26 Dec 2025
Form 2A (FY 2021-2022)File: March 22.pdf26 Dec 2025
Form 2A (FY 2022-2023)File: March 23.pdf26 Dec 2025
Form 2A (FY 2023-2024)File: March 24.pdf26 Dec 2025
Form 5 (FY 2019-2020)File: Form 5 - Annual Report 2019-2020.pdf26 Dec 2025
Form 5 (FY 2020-2021)File: Form 5 - Annual Report 2020-2021.pdf26 Dec 2025
Form 5 (FY 2021-2022)File: Form 5 - Annual Report 2021-2022.pdf26 Dec 2025
Form 5 (FY 2022-2023)File: Form 5 - Annual Report 2022-2023.pdf26 Dec 2025
Form 5 (FY 2023-2024)File: March 24.pdf26 Dec 2025
Form 1File: Architectct Cert -10072025.pdf24 Dec 2025
Form 2File: 1)Engineer Certificate 30062025 Mark.pdf24 Dec 2025
Form 3File: RERA CA Certificate- 30062025 Mark 31.pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold June 2025 Mark 31 _page-0001.pdf24 Dec 2025
Form 1File: Architects Certificate Mark 31.pdf24 Dec 2025
Form 2File: Engineer Certificate 30092025 Mark 31.pdf24 Dec 2025
Form 3File: RERA CA Certificate- 30092025 Mark 31.pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold September 2025 Mark 31 _page-0001.pdf24 Dec 2025
Form 1File: Architetct Cert -10042025.pdf24 Dec 2025
Form 2File: Engineer certificate - March 2025.pdf24 Dec 2025
Form 3File: RERA CA Certificate -31032025-signed.pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: Discolure of Sold Booked Inventory March 2025.pdf24 Dec 2025
Declaration in FORM BFile: Form B_230425.pdf29 Apr 2025
Certificates of CA (Form 3)File: RERA CA Certificate -310325.pdf29 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate - March 2025.pdf29 Apr 2025
Disclosure of sold/ booked inventoryFile: Discolure of Sold Booked Inventory March 2025.pdf29 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other real estate organization Anant Talawdekar.pdf29 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other real estate organization Partners Collective.pdf29 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other real estate organization Prasad Chindarkar.pdf29 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architetct Cert -10042025.pdf11 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Jan 2025.pdf20 Mar 2025
Disclosure of sold/ booked inventoryFile: Dec - 2024.pdf20 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Achitect Cert Mark - 10012025_rotated.pdf17 Mar 2025
Certificates of CA (Form 3)File: RERA Certificate - Oct 2024 to Dec 2024-signed.pdf17 Mar 2025
Disclosure of sold/ booked inventoryFile: March 2024 of Sold Booked Inventory.pdf17 Mar 2025
Disclosure of sold/ booked inventoryFile: June 2024 of Sold Booked Inventory.pdf17 Mar 2025
Disclosure of sold/ booked inventoryFile: Sept -2024 of sold book Inventory.pdf17 Mar 2025
Declaration about Commencement CertificateFile: Declaration of Commencement certificate.pdf17 Mar 2025
CERSAI detailsFile: Cersai Declaration.pdf17 Mar 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration for seperate Banck acount.pdf17 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: Bldg no 31CC .pdf13 Feb 2025
Certificates of CA (Form 3)File: 3092024.pdf6 Jan 2025
Certificates of CA (Form 3)File: 3062024.pdf6 Jan 2025
Certificates of CA (Form 3)File: Form-3 March 2024.pdf6 Jan 2025
Certificates of CA (Form 3)File: Form-3 December 2023.pdf6 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers certificate Bldg 31 Dec- 2023.pdf6 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers certificate Bldg 31 March -2024.pdf6 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers certificate Bldg 30 Sept 2023.pdf6 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers certificate Bldg 30 June- 2023.pdf6 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers certificate Bldg 31 March -2024.pdf6 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers certificate Bldg 30 June 2024.pdf6 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers certificate Bldg 30 Sept 2024.pdf6 Jan 2025
Declaration in FORM BFile: Form B.pdf31 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_10072023.pdf30 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_10102023.pdf30 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_10012024.pdf30 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_10042024.pdf30 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_10072024.pdf30 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_10102024.pdf30 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A -Quality Assurance Certificate 2023 - 2024.pdf30 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_rotated.pdf30 Dec 2024
Declaration in FORM BFile: Form B Mark.pdf9 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - Quality assurance certificate 21-22_compressed.pdf9 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Quality assurance certificate 22-23_compressed.pdf9 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold_Booked Inventory.pdf9 Jan 2024
Certificates of CA (Form 3)File: RERA CA Certificate - 30062023.pdf9 Jan 2024
Certificates of CA (Form 3)File: RERA CA Certificate - 30092023.pdf9 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - Annual Report 2019-2020.pdf9 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - Annual Report 2020-2021.pdf9 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - Annual Report 2021-2022.pdf9 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Annual Report 2022-2023.pdf9 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mark 31 - Architect Certificate - Mar 22.pdf24 Jul 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 under way, not due yet
ProjectLocationStatusPromisedDelivered
NILNILOngoingDec 2027Not due yet

How this compares with Mumbai Suburban

51%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 39 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAPTARSHI MARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nehru Nagar6,700+ in Mumbai Suburban

Builder: Saptrishi Realtors

Saptrishi Realtors has 3 registrations on MahaRERA, including Saptarshi Heights and SAPTARSHI MARK. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SAPTARSHI MARK is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAPTARSHI MARK?

The registered promoter entity is Saptrishi Realtors, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAPTARSHI MARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SAPTARSHI MARK?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SAPTARSHI MARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAPTARSHI MARK?

The professionals named in the filing: Architect: Shelter Associates; Engineer: Prathemesh Kirve; Chartered Accountant: Ravindra Karandikar; Chartered Accountant: Madhv & Associates Chartered Accountants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAPTARSHI MARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAPTARSHI MARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAPTARSHI MARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.