Home / Browse projects / Raigarh, Maharashtra / SAPPHIRE

Registered No litigation declared Residential / Group Housing project

SAPPHIRE

By AK HITECH ASSOCIATES

RG-MH-07507 · RERA P52000055069 · Last updated on MahaRERA portal: 8 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Jun 2028Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 67%
39 of 102Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 99 documents Report an error

SAPPHIRE is a Residential / Group Housing project by AK HITECH ASSOCIATES in Raigarh, Maharashtra, registered with MahaRERA as P52000055069 on 29 Feb 2024. Possession is promised by 30 Jun 2028. 63 of the 102 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameSAPPHIRE
  • TypeResidential / Group Housing
  • Location
    • KHARGHAR ROAD
    • NAVI MUMBAI
    • Kharghar
    • Panvel
    • Raigarh
    • 410210
  • Pincode410210
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000055069
  • ReraGenie IDRG-MH-07507

Builder

  • NameAK HITECH ASSOCIATES
  • Entity typePartnership
  • PartnersKHAMRUDDIN SUBHANI PATEL, SHAMSUDDIN SUBHANI PATEL, IRFAN SHAMSUDDIN PATEL, BHAVESH KANTILAL CHIKHLIYA, SHAHID KHAMRUDDIN PATEL, KHAMRUDDIN SUBHANI PATEL, BHAVESH KANTILAL CHIKHLIYA, IRFAN SHAMSUDDIN PATEL, SHAHID KHAMRUDDIN PATEL, SHAMSUDDIN SUBHANI PATEL
  • Other registrations2 more →
  • Completed1 of 3

Key dates

this monthRegisteredFeb 2024PromisedJun 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Feb 2024
  • Promised completion30 Jun 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed99 files

Current status

62%63 of 102 units booked
24.2%Work done, per cost certificate

Figures as on 8 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING - 1NA35241020102

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 67%.

BUILDING - 1: 54% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure67%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises33%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks67%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 8 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed101

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots101
Closed/Covered101

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,050 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on8 Jul 2025

Approvals and building plan

Sanctioning authorityCIDCO (City and Industrial Development Corporation of Maharashtra)
Permissible FSI11520.86
Proposed, not sanctioned11,521 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch88/91 HAWARES CENTURION MALL SECTOR 19A NERUL NAVI MUMBAI 400706
Estimated costRs 65.00 cr
Cost incurredRs 15.75 cr
Work done24.24%
BuildingWingEstimatedIncurred
BUILDING - 1NARs 60.00 crRs 15.26 cr
-NARs 5.00 crRs 49.69 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDESTINATION Architecture Interior Designs
EngineerSAMARTH AGARWAL
EngineerCSE Consultants
EngineerRUTU KAPUPARA
Chartered AccountantJB Patel and Associates
Chartered AccountantCA Rishabh Lodaya
PartnerRole in project
AK HITECH ASSOCIATES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2028

Documents filed99

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 99 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 - SAPPHIRE - March Quarter.pdf8 May 2026
Withdrawal Update Form 2File: FORM 2 - SAPPHIRE - March Quarter.pdf8 May 2026
Withdrawal Update Form 3File: FORM 3 - SAPPHIRE - March Quarter.pdf8 May 2026
Withdrawal Update Form 1File: Sapphire - Form 1.pdf20 Mar 2026
Withdrawal Update Form 2File: Sapphire - Form 2.pdf20 Mar 2026
Withdrawal Update Form 3File: Form 3 - Sapphire Q3.pdf20 Mar 2026
Withdrawal Update Form 1File: Sapphire - Form 1.pdf18 Feb 2026
Withdrawal Update Form 2File: Sapphire - Form 2.pdf18 Feb 2026
Withdrawal Update Form 3File: Form 3 - Sapphire Q3.pdf18 Feb 2026
Form 2A (FY 2024-2025)File: Sapphire Form 2A 2024-25.pdf29 Dec 2025
Withdrawal Update Form 1File: Form 1 Sapphire 30-09-2025.pdf24 Nov 2025
Withdrawal Update Form 2File: Form 2 Sapphire..pdf24 Nov 2025
Withdrawal Update Form 3File: Form 3_Sapphire_30-09-2025_Scanned.pdf24 Nov 2025
Form 5 (FY 2024-2025)File: Form 5_Sapphire_FY2024-25.pdf31 Oct 2025
Withdrawal Update Form 1File: FORM 1 Sapphire with Sign and Stamp (1).pdf25 Aug 2025
Withdrawal Update Form 1File: FORM 1 Sapphire with Sign and Stamp (1).pdf25 Aug 2025
Withdrawal Update Form 2File: Form 2 June 2025.pdf25 Aug 2025
Withdrawal Update Form 2File: Form 2 June 2025.pdf25 Aug 2025
Withdrawal Update Form 3File: Form 3_Sapphire_Signed.pdf25 Aug 2025
Withdrawal Update Form 3File: Form 3_Sapphire_Signed.pdf25 Aug 2025
Withdrawal Update Form 1File: FORM 1 Sapphire with Sign and Stamp (1).pdf23 Aug 2025
Withdrawal Update Form 2File: Form 2 June 2025.pdf23 Aug 2025
Withdrawal Update Form 3File: Form 3_Sapphire_Signed.pdf23 Aug 2025
Withdrawal Update Form 1File: FORM 1 Sapphire with Sign and Stamp (1).pdf22 Aug 2025
Withdrawal Update Form 2File: Form 2 June 2025.pdf22 Aug 2025
Withdrawal Update Form 3File: Form 3_Sapphire_Signed.pdf22 Aug 2025
Form 1File: Form 1 Sep 2024.pdf19 Aug 2025
Form 2File: Form 2 - Sep 24 [Final]_compressed.pdf19 Aug 2025
Form 3File: FORM 3 SEPT 24.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sapphire Disclosure.pdf19 Aug 2025
Form 1File: Form 1 - Dec 24 [Final].pdf19 Aug 2025
Form 2File: Form 2_compressed.pdf19 Aug 2025
Form 3File: FORM 3 DEC 24.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked - Dec 24_compressed (1).pdf19 Aug 2025
Form 1File: Sapphire Form 1.pdf19 Aug 2025
Form 2File: Sapphire Form 2_compressed.pdf19 Aug 2025
Form 3File: FORM 3 MARCH 25.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Book 25_compressed.pdf19 Aug 2025
Disclosure of sold/ booked inventoryFile: Sold Book 25_compressed.pdf8 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sapphire Form Mar 25 final.pdf3 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sapphire Form 1.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sapphire Form 2_compressed.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sep 24 [Final]_compressed.pdf24 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold Booked - Dec 24_compressed (1).pdf1 Feb 2025
Disclosure of sold/ booked inventoryFile: Sapphire Disclosure.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Dec 24 [Final].pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate(Sapphire)-Final.pdf12 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 2024.pdf9 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sep 2024.pdf9 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_compressed.pdf9 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_compressed.pdf9 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form -2A_compressed.pdf9 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June.pdf5 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sept.pdf5 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 Nov.pdf5 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: cc verification mail.pdf21 Feb 2024
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale (6) (1).pdf21 Feb 2024
Deviation Report with respect to model copy of AgreementFile: AK Hitech Associates_Declaration_compressed.pdf21 Feb 2024
Other - LegalFile: Lease Agreement.pdf13 Feb 2024
Other - LegalFile: Tripartite Agreement_compressed.pdf13 Feb 2024
Declaration in FORM BFile: Affidavit Cum Declaration_Signed NEW.pdf12 Feb 2024
Other - TechnicalFile: 240207063223_0001.pdf9 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA CERTIFICATE_Signed01.pdf31 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: A K Hitech Associates.pdf31 Jan 2024
Details of encumbrances concerned to FinanceFile: DECLARATION FINANCE.pdf30 Jan 2024
Details of encumbrances concerned to FinanceFile: DECLARATION LEGAL.pdf30 Jan 2024
Details of encumbrances concerned to LegalFile: DECLARATION FINANCE.pdf30 Jan 2024
Details of encumbrances concerned to LegalFile: DECLARATION LEGAL.pdf30 Jan 2024
Declaration about Commencement CertificateFile: DECLARATION ABOUT CC.pdf30 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate (2).pdf30 Jan 2024
CERSAI detailsFile: DECLARATION CERSAI.pdf30 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ilovepdf_merged (4).pdf30 Jan 2024
Proforma of Allotment letterFile: DAL.pdf30 Jan 2024
Deviation Report with respect to Allotment letterFile: DEVIATION DAL.pdf30 Jan 2024
Copy of the legal title reportFile: ilovepdf_merged (13)_compressed.pdf26 Jan 2024
Building plan approvalFile: CC DRW-5.pdf5 Jan 2024
Layout approvalFile: CC DRW-1.pdf5 Jan 2024
Layout approvalFile: CC DRW-2.pdf5 Jan 2024
Layout approvalFile: CC DRW-3.pdf5 Jan 2024

How this compares with Raigarh

62%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAPPHIRE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NAVI MUMBAI5,900+ in Raigarh

2 kmSAPPHIRECompleted 3Other 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 5 registered projects within 2 km.

Builder: AK HITECH ASSOCIATES

AK HITECH ASSOCIATES has 3 registrations on MahaRERA, including PATEL SUKHSAMRUDDHI and PRIME ROSE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if SAPPHIRE is delayed beyond 30 Jun 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAPPHIRE?

The registered promoter entity is AK HITECH ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAPPHIRE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAPPHIRE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAPPHIRE?

The professionals named in the filing: Architect: DESTINATION Architecture Interior Designs; Engineer: SAMARTH AGARWAL; Engineer: CSE Consultants; Engineer: RUTU KAPUPARA; Chartered Accountant: JB Patel and Associates; Chartered Accountant: CA Rishabh Lodaya. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAPPHIRE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAPPHIRE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAPPHIRE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.