ReraGenieLog inGet a buyer report

Home / Browse projects / Mysore, Karnataka / SANTHOSHDHRUVATAR APARTMENTS

Registration approved No litigation declared Residential/Group Housing project

SANTHOSHDHRUVATAR APARTMENTS

By SANTHOSH SHELTERS PRIVATE LIMITED

RG-KA-86062 · RERA PRM/KA/RERA/1268/378/PR/300125/007456 · Last updated on RERA Karnataka portal: 27 Jan 2025

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2027Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 104 documents Report an error

SANTHOSHDHRUVATAR APARTMENTS is a Residential/Group Housing project by SANTHOSH SHELTERS PRIVATE LIMITED in Mysore, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1268/378/PR/300125/007456 on 30 Jan 2025. Possession is promised by 30 Dec 2027.

At a glance

Project

  • NameSANTHOSHDHRUVATAR APARTMENTS
  • TypeResidential/Group Housing
  • Location
    • MYSORE
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1268/378/PR/300125/007456
  • ReraGenie IDRG-KA-86062

Builder

  • NameSANTHOSH SHELTERS PRIVATE LIMITED
  • Entity typeCompany
  • CINU45309KA2017PTC108766
  • GSTIN29AAZCS6109C1ZX
  • Authorized SignatoryK SRINIVASAN
  • Managing DirectorK SRINIVASAN
  • DirectorsK SRINIVASAN, M BHAGYARATHNA
  • Project HeadV K PURUSHOTHAM
  • Declared earlier projects1 →

Key dates

this monthRegisteredJan 2025PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on30 Jan 2025
  • Promised completion30 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed104 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SANTHOSHDHRUVATAR APARTMENTS---82082

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 27 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities37

As on 27 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalYes-
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasYes-

Land and ownership6

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners6
LandownerVillageDistrict
GIRI GOWDA--
Govinde Gowda--
HONNE GOWDA--
GIRI GOWDA--
Govinde Gowda--
HONNE GOWDA--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 29.02 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 29.02 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJAGADISH M
EngineerN SRIDHARA
Chartered AccountantSHARATH

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed104

As listed on the registration, under the names the promoter filed them with; the newest 80 of 104 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1268/378/PR/300125/007456 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
current year RTC 48/7File: RTC 487.pdf27 Jan 2025
current year RTC 48/10File: RTC 4810.pdf27 Jan 2025
EC of Sy.No. 48/7 & 48/10 till jan 2025File: ECC- 2025 jan.pdf27 Jan 2025
EC of all sy. no'sFile: Land EC.pdf27 Jan 2025
Deed of the current land ownerFile: PARTITON DEED.pdf27 Jan 2025
conversion order of sno 48/7 & 48/10File: CONVERSION ORDER.pdf27 Jan 2025
katha site no.File: KATHA SITE 01.pdf27 Jan 2025
Layout single plan approved letterFile: Muda layout approval release order.pdf27 Jan 2025
layout release order / single layout planFile: release layout plan.pdf27 Jan 2025
Building approval plans 1File: SANCTION PAGE 01-03.pdf27 Jan 2025
Building approval plans 2File: SANCTION PAGE 02-03.pdf27 Jan 2025
Building approval plans 2File: SANCTION PAGE 03-03.pdf27 Jan 2025
Building licence planFile: BUILDING LIENCAE.pdf27 Jan 2025
Master Plan proposed areaFile: CDP_23A (1).pdf27 Jan 2025
village map - bogadhiFile: village map.pdf27 Jan 2025
Amenities and Common area certified by the EngineerFile: certificate by engineer Amenites common area.pdf27 Jan 2025
Engineer certificate from 06File: enginerr's certificate from 06.pdf27 Jan 2025
Construction Cost DetailsFile: certificate by engineer estimation.pdf27 Jan 2025
the brief estimated cost of construction certified by the registered Civil EngineerFile: certificate by engineer estimation.pdf27 Jan 2025
Project specificationFile: certificate by engineer - Specification.pdf27 Jan 2025
Project address in project section 3(1) notarized affidavitFile: NOTARISED AFFIDAVIT 03.pdf27 Jan 2025
Proforma of the Allotment letterFile: Model Form of Allotment Letter.pdf27 Jan 2025
Proforma of Agreement for SaleFile: FLAT SALE ARGEEMENT.pdf27 Jan 2025
CESCOM NOCFile: electric NOC.pdf27 Jan 2025
CESCOM PAYMENT RECEIPT.File: CESOM Payment receipt.pdf27 Jan 2025
Water supply NOCFile: water UGD Order.pdf27 Jan 2025
Water PAYMENT RECEIPTFile: water UGD WORK PAYMENT RECEIPT.pdf27 Jan 2025
Land cost calculation sheet as per the guidance valueFile: LAND COST.pdf27 Jan 2025
STP design drawing certified by the EngineeRFile: STP DRAWING ENG CERTIFICATE.pdf27 Jan 2025
self-attested copy of the Engineer licenseFile: Eng lienace.pdf27 Jan 2025
WATER BORE MOTOR MITERFile: WATER BORE MOTOR.jpeg27 Jan 2025
WATER STORAGE SUMPFile: WATER SUMP.jpeg27 Jan 2025
WATER STORAGE SUMP AREAFile: water sump 2.jpeg27 Jan 2025
Project cost - bank affidavitFile: BANK Affidavt RERA.pdf27 Jan 2025
Director's financial statementsFile: Director Report FY 2022-23_Santhosh Shelters Private Limited.pdf27 Jan 2025
Cash financial statementsFile: Cash Flow Statement FY 2023-23_Santhosh Shelters Private Limited.pdf27 Jan 2025
Clear financial statementsFile: Financials FY 2022-23_Santhosh Shelters Private Limited.pdf27 Jan 2025
ITR - SSPLFile: ITR ACK FY 2022-23_Santhosh Shelters Private Limited.pdf27 Jan 2025
CA CERTIFICATE FROM 01File: RERA FORM - Scan (1).pdf27 Jan 2025
CA LIEANCEFile: CA LIENACE.jpeg27 Jan 2025
CS Certificate for ShareholdingFile: CS Certificate for Shareholding.pdf27 Jan 2025
RTC, survey 48/7-
Mutation, survey 48/7-
Encumbrance Certificate, survey 48/7-
Conversion/Alienation Order, survey 48/7-
JDA, survey 48/7-
Khatha, survey 48/7-
RTC, survey 47/10-
Mutation, survey 47/10-
Encumbrance Certificate, survey 47/10-
Conversion/Alienation Order, survey 47/10-
JDA, survey 47/10-
Khatha, survey 47/10-
Registration CertificateFile: COMPANY FIRM.pdf-
Memorandum of AssociationFile: Frame Certificate SSPL.pdf-
Article of AssociationFile: Frame Certificate SSPL.pdf-
GST Certificate-
Organization StructureFile: orgstructure.pdf-
Certificate issued by CA Form 1File: RERA FORM - Scan (1).pdf-
Certificate issued by Architect Form 2File: certificate by architect.pdf-
Certificate issued by Engineer Form 3File: enginerr's certificate from 06.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: NO LITIGATION.pdf-
Balance Sheet 2022 - 2023File: Financials FY 2022-23_Santhosh Shelters Private Limited_compressed.pdf-
Audited Profit and Loss Statement 2022 - 2023File: Auditors Report FY 2022-23- with CARO_Santhosh Shelters Private Limited_compressed (3).pdf-
Director's Report 2022 - 2023File: Director Report FY 2022-23_Santhosh Shelters Private Limited.pdf-
Cash Flow Statement 2022 - 2023File: Cash Flow Statement FY 2023-23_Santhosh Shelters Private Limited.pdf-
Auditor's Report 2022 - 2023File: Auditors Report FY 2022-23- with CARO_Santhosh Shelters Private Limited_compressed (3).pdf-
Income Tax Return Acknowledgement 2022 - 2023File: ITR ACK FY 2022-23_Santhosh Shelters Private Limited.pdf-
WILL SUBMIT LATER-
WILL SUBMIT LATER-
WILL SUBMIT LATER-
08102024scan08102024_compressed (1) (1)-
08102024scan08102024_compressed (1) (1)-
08102024scan08102024_compressed (1) (1)-
WILL SUBMIT LATER-
SANCTION PAGE 03-03-
WILL SUBMIT LATER-

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
SANTHOSH DHRUVATARSy. No. 48/5,6,7,8,10,11,12,13 & 48/17, Bogadhi, kasaba Hobli, Bogadhi - Gaddhige Road, Mysore - 570026Completed-No date filed

How this compares with Mysore

28%of Mysore projects moved their completion datethis one has not
0%of Mysore registrations are shown as withdrawn or revokedthis one is not

Computed across the 700+ Mysore projects on ReraGenie, from their own filings.

Keep SANTHOSHDHRUVATAR APARTMENTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Mysore700+ in Mysore

Builder: SANTHOSH SHELTERS PRIVATE LIMITED

SANTHOSH SHELTERS PRIVATE LIMITED has 1 registration on RERA Karnataka, including SANTHOSHDHRUVATAR APARTMENTS. Its filings declare 1 earlier project, 1 of them declared completed. Read the full track record. See more projects on the Mysore district page.

Frequently asked questions

What are my rights if SANTHOSHDHRUVATAR APARTMENTS is delayed beyond 30 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SANTHOSHDHRUVATAR APARTMENTS?

The registered promoter entity is SANTHOSH SHELTERS PRIVATE LIMITED, a company as per the filing. Its CIN U45309KA2017PTC108766 and GSTIN 29AAZCS6109C1ZX can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SANTHOSHDHRUVATAR APARTMENTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SANTHOSHDHRUVATAR APARTMENTS?

The professionals named in the filing: Architect: JAGADISH M; Engineer: N SRIDHARA; Chartered Accountant: SHARATH. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SANTHOSHDHRUVATAR APARTMENTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SANTHOSHDHRUVATAR APARTMENTS. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SANTHOSHDHRUVATAR APARTMENTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.