ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / Sanskruti Pinnacle

Registered No litigation declared Others project

Sanskruti Pinnacle

By Sanskruti Developer

RG-MH-19092 · RERA P99000078133 · Last updated on MahaRERA portal: 22 Jun 2026

Source: official MahaRERA filing

Red flags

  • Rs 22.00 crore secured on the land, in favour of PIRAMAL FINANCE LIMITED

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Jul 2029Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Stilt Floor, 90%
172 of 201Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 62 documents Report an error

Sanskruti Pinnacle is a Others project by Sanskruti Developer in Palghar, Maharashtra, registered with MahaRERA as P99000078133 on 25 Nov 2024. Possession is promised by 31 Jul 2029. 29 of the 201 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameSanskruti Pinnacle
  • TypeOthers
  • Location
    • Station Road
    • Nilemore Virar West
    • Palghar
    • 401203
  • Pincode401203
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000078133
  • ReraGenie IDRG-MH-19092

Builder

  • NameSanskruti Developer
  • Entity typePartnership
  • PartnersVishal Moreshwar Patil, Vilas Dhondu Naik, Pramod Atmaprasad Chaturvedi, Pradeepkumar Atmaprasad Chaturvedi

Key dates

this monthRegisteredNov 2024PromisedJul 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Nov 2024
  • Promised completion31 Jul 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed62 files

Current status

14%29 of 201 units booked
29.0%Work done, per cost certificate

Figures as on 22 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sanskruti PinnacleNA272215150201

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 90%.

Sanskruti Pinnacle: 41% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)70%
Plinth100%
Stilt Floor90%
Slabs of Super Structure26%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises5%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks35%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%

Progress on shared amenities15

As on 22 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed325

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots325
Closed/Covered1
Open Space324

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area3,010 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofPIRAMAL FINANCE LIMITED
Secured amountRs 22.00 crore
CERSAI search filedYes
Declared on31 Oct 2025
LandownerVillageDistrict
Himalya CHSLVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityVASAI VIRAR CITY MUNICIPAL CORPORATION
Permissible FSI12820.49
Proposed, not sanctioned12,820 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO.1,2,3,4 AND 5SHREE RAM SANKUL, ACHOLE ROADNALASOPARA EAST
Estimated costRs 41.95 cr
Cost incurredRs 12.17 cr
Work done29.01%
BuildingWingEstimatedIncurred
Sanskruti PinnacleNARs 40.57 crRs 12.17 cr
-NARs 1.38 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDesigners Combine
EngineerKC Shah Designs LLP
Chartered AccountantSTR and Associates
Chartered AccountantHARESH MEHTA & ASSOCIATES
PartnerRole in project
Sanskruti Developer-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Aug 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Aug 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Aug 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Jul 2029

Documents filed62

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: FORM 2A FY_2024-25.pdf22 Jun 2026
Form 2A (FY 2025-2026)File: FORM 2A FY_2025-26.pdf22 Jun 2026
Withdrawal Update Form 1File: FORM 1 MAR - 2026.pdf16 Jun 2026
Withdrawal Update Form 2File: FORM 2 - MAR 2026.pdf16 Jun 2026
Withdrawal Update Form 3File: FORM 3 - MAR 2026.pdf16 Jun 2026
Form 5 (FY 2024-2025)File: Form 5_Sanskruti Pinnacle_FY 2024-2025.pdf30 Mar 2026
Withdrawal Update Form 1File: FORM 1 - SEP 2025.pdf20 Mar 2026
Withdrawal Update Form 1File: FORM 1 - DEC 2025.pdf20 Mar 2026
Withdrawal Update Form 2File: FORM 2 - SEP 2025.pdf20 Mar 2026
Withdrawal Update Form 2File: FORM 2 - DEC 2025.pdf20 Mar 2026
Withdrawal Update Form 3File: FORM 3_SANSKRUTI PINNACLE_SEP 2025-SIGNED.pdf20 Mar 2026
Withdrawal Update Form 3File: FORM 3_SANSKRUTI PINNACLE_DEC 2025-SIGNED.pdf20 Mar 2026
Form 1File: FORM 1.pdf7 Aug 2025
Form 2File: FORM 2.pdf7 Aug 2025
Form 3File: FORM 3_SANSKRUTI PINNACLE-Q1 JUNE 2025-SIGNED.pdf7 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD BOOKED INVENTORY.pdf7 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 - ARCHITECT CERTIFICATE.pdf15 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form engineer certificate.pdf15 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_SANSKRUTI PINACLE-Q3 SIGNED - converted.pdf13 Mar 2025
Other - FinanceFile: Clarification land value.pdf14 Nov 2024
Details of encumbrances concerned to FinanceFile: No legal encumbrance Pinnacle.pdf17 Oct 2024
Details of encumbrances concerned to LegalFile: No legal encumbrance Pinnacle.pdf17 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: verification of development permission Sanskruti Pinnacle.pdf11 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: CC mail.pdf11 Oct 2024
Other - LegalFile: Declaration cum Undertaking.pdf11 Oct 2024
Building plan approvalFile: sheet No 6 terrace floor plan.pdf13 Aug 2024
Building plan approvalFile: sheet no 5 22nd floor part plan 1.pdf13 Aug 2024
Building plan approvalFile: sheet no 4 8th 11th 13th 16th 18th 20th floor plan.pdf13 Aug 2024
Building plan approvalFile: sheet no 3 Podium 3rd floor plan.pdf13 Aug 2024
Building plan approvalFile: sheet no 2 Ground and first floor plan.pdf13 Aug 2024
Layout approvalFile: sheet no 1 layout plan.pdf13 Aug 2024
PAN CardFile: PAN CARD.pdf13 Aug 2024
Copy of the legal title reportFile: Hitesh Chaubey - Title report.pdf13 Aug 2024
Details of encumbrances concerned to FinanceFile: New Doc 08 13 2024 18 06.pdf13 Aug 2024
Copy of Layout Approval (in case of layout)File: sheet no 1 layout plan.pdf13 Aug 2024
Proforma of Allotment letterFile: 1 Proforma of Allotment letter (2) (1).pdf13 Aug 2024
Declaration in FORM BFile: Form B Sanskruti Dev.pdf13 Aug 2024
Declaration in FORM BFile: Society Afidavit cum declaration.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Form Rera Final.pdf13 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate 06 08 24.pdf13 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: Sanskruti Developer revised cc 12 07 24.pdf13 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: sheet no 5 22nd floor part plan 1.pdf13 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: sheet no 2 Ground and first floor plan.pdf13 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: sheet no 3 Podium 3rd floor plan.pdf13 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: sheet no 4 8th 11th 13th 16th 18th 20th floor plan.pdf13 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: sheet No 6 terrace floor plan.pdf13 Aug 2024
Declaration about Commencement CertificateFile: New Doc 08 13 2024 1830.pdf13 Aug 2024
CERSAI detailsFile: New Doc 08 13 2024 1831.pdf13 Aug 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: 1 Declaration about all RERA Designated Bank Accounts (Format A).pdf13 Aug 2024
Deviation Report with respect to Allotment letterFile: New Doc 08 13 2024 1808.pdf13 Aug 2024
Details of encumbrances concerned to LegalFile: New Doc 08 13 2024 18 06.pdf13 Aug 2024
Deviation Report with respect to model copy of AgreementFile: New Doc 08 13 2024 1805.pdf13 Aug 2024
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale (2) (2).pdf13 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: New Doc 08 13 2024 19 12.pdf13 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: New Doc 08 13 2024 1913.pdf13 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: New Doc 08 13 2024 1919.pdf13 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: New Doc 08 13 2024 1920.pdf13 Aug 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B.pdf13 Aug 2024
Disclosure for secured/unsecured finance availed for the projectFile: Adobe Scan 18-Oct-2024 (1).pdf13 Aug 2024

How this compares with Palghar

14%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sanskruti Pinnacle on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nilemore Virar West3,200+ in Palghar

2 kmSanskruti PinnacleCompleted 56Lapsed / revoked 47Other 122Dot size: filed unitsN

Filed coordinates, straight-line distance. 225 registered projects within 2 km.

Builder: Sanskruti Developer

Sanskruti Developer has 1 registration on MahaRERA, including Sanskruti Pinnacle. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if Sanskruti Pinnacle is delayed beyond 31 Jul 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sanskruti Pinnacle?

The registered promoter entity is Sanskruti Developer, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sanskruti Pinnacle?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sanskruti Pinnacle?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sanskruti Pinnacle?

The professionals named in the filing: Architect: Designers Combine; Engineer: KC Shah Designs LLP; Chartered Accountant: STR and Associates; Chartered Accountant: HARESH MEHTA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sanskruti Pinnacle?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sanskruti Pinnacle. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sanskruti Pinnacle to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.