ReraGenieLog inGet a buyer report

Home / Browse projects / Mysore, Karnataka / SANKALP WELLINGTON PARK

Registration approved No litigation declared Residential/Group Housing project

SANKALP WELLINGTON PARK

By SANKALP CONSTRUCTIONS PRIVATE LIMITED

RG-KA-48554 · RERA PRM/KA/RERA/1268/378/PR/150925/008094 · Last updated on RERA Karnataka portal: 15 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2031Possession promisedno revision filed
0 of 18Construction stages donefurthest along: Earth work and other leveling..., 90%
104 of 165Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 109 documents Report an error

SANKALP WELLINGTON PARK is a Residential/Group Housing project by SANKALP CONSTRUCTIONS PRIVATE LIMITED in Mysore, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1268/378/PR/150925/008094 on 15 Sep 2025. Possession is promised by 31 Dec 2031. 61 of the 165 units on this registration are recorded sold or booked, and 0 of 18 construction stages are filed complete.

At a glance

Project

  • NameSANKALP WELLINGTON PARK
  • TypeResidential/Group Housing
  • Location
    • MYSORE
    • 570011
  • Pincode570011
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1268/378/PR/150925/008094
  • ReraGenie IDRG-KA-48554

Builder

  • NameSANKALP CONSTRUCTIONS PRIVATE LIMITED
  • Entity typeCompany
  • CINU45201KA1989PTC010315
  • GSTIN29AACCS5166N1ZQ
  • Authorized SignatoryV K Jagadish Babu
  • Managing DirectorV K Jagadish Babu
  • DirectorsV K Jagadish Babu, Geetha Jagadish, Nikhil Jagadish
  • Project HeadNataraj G
  • Other registrations11 more →
  • Declared earlier projects19 →

Key dates

this monthRegisteredSep 2025PromisedDec 2031

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on15 Sep 2025
  • Promised completion31 Dec 2031
  • Revised completionNone
  • Buildings1 building record
  • Documents filed109 files

Current status

37%61 of 165 units booked
6.1%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLOCK-A---1650165

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 18 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 90%.

Building: 14% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work90%
Foundation footing work85%
Upto Plinth Level40%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)20%
Retaining wall (All types)5%
RCC or MS Framed structure10%
Masonry Construction0%
Plastering inside , outside & Ceiling0%
Joinery: Doors, Windows, Ventilators etc0%
Basic work of Water supply, Sanitary and Electrification0%
Dadoing, Skirting, Flooring, Tiles work (All types)0%
Railing and Grill fixing0%
Electrification, Water supply and Sanitary Finishing0%
Painting0%
Fire prevention and fire fighting fitting and fixture with network0%
Weather Proof work(tile,concrete)0%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work0%
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities40

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes0%
Sewage and Drainage SystemYes0%
Water conservation/rain water harvesting/recharge of ground waterYes0%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes0%
Solid waste management and disposalYes0%
Emergency Evacuation servicesYes0%
Internal Roads & FootpathsYes0%
Electricity supply transformer and substationYes0%
Storm water drainsYes0%
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes2%
Parks & Tree plantingYes0%
Street LightingYes0%
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes0%
Club HouseYes5%
Community HallYes0%
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolYes0%
GymYes0%
ParksYes0%
Power BackupYes0%
Piped GasNoNot applicable
Water and SanitationYes0%
Air ConditioningNoNot applicable
StaircasesYes2%
LiftsYes0%
Corridor/LobbiesYes0%
Fire escapesYes0%
Common entrance and exit for the building/common portico/foyer/verandahYes0%
BasementNoNot applicable
TerraceYes0%
Outer WallYes0%
Open parking areasYes0%
Provision for lodging of management staff and security staffYes0%
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,478 sq m
Named landowners1
LandownerVillageDistrict
Kanchana K--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 77.71 cr
Cost incurredRs 4.77 cr
Spent of the estimate6.13%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 64.87 crRs 4.20 cr
Principal sum and interest payable to financial institutions-Scheduled BanksRs 6.36 crRs 7.92 lakh
On-site expenditure-Site OverheadRs 2.72 crRs 13.84 lakh
On-site expenditure-Salaries of workersRs 1.95 crRs 12.00 lakh
On-site expenditure-Consultants FeesRs 84.00 lakhRs 22.67 lakh
Payment of taxesRs 58.00 lakh-
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 39.00 lakhRs 75,000

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJamuna Chalam
EngineerYogish Rao D V
Chartered AccountantSantosh K L

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed109

As listed on the registration, under the names the promoter filed them with; the newest 80 of 109 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1268/378/PR/150925/008094 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: SWP - F4 CA Cert (QU) Sep-2026.pdf15 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: SWP - F5 Architect Cert (QU) Sept-2026.pdf15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: SWP - F6 Engineer Cert (QU) Sept-2026.pdf15 Oct 2026
Q2 2026-27 Water supply and sewage board15 Oct 2026
Q2 2026-27 KPTCL- BESCOM15 Oct 2026
Q2 2026-27 Airport Authority of India15 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: SWP - F4 CA Cert (QU) June-2026.pdf15 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: SWP - F5 Architect Cert (QU) June-2026.pdf15 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: SWP - F6 Engineer Cert (QU) June-2026.pdf15 Jul 2026
Q1 2026-27 Water supply and sewage board15 Jul 2026
Q1 2026-27 KPTCL- BESCOM15 Jul 2026
Q1 2026-27 Fire and Safety15 Jul 2026
Q1 2026-27 Airport Authority of India15 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: SWP - F4 CA Cert (QU) Mar-2026.pdf14 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: SWP - F5 Architect Cert (QU) Mar-2026.pdf14 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: SWP - F6 Engineer Cert (QU) Mar-2026.pdf14 Apr 2026
Q4 2025-26 Water supply and sewage board14 Apr 2026
Q4 2025-26 KPTCL- BESCOM14 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: SWP - F4 CA Cert (QU) Dec-2025.pdf15 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: SWP ARCHITECTS CERTIFICATE FORM 5 - - 31-12-2025.pdf15 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: SWP ENGINEERS CERTIFICATE FORM 6 - - 31-12-2025.pdf15 Jan 2026
Q3 2025-26 Water supply and sewage board15 Jan 2026
Q3 2025-26 KPTCL- BESCOM15 Jan 2026
CHESCOM NOCFile: Affidavit - CHESCOM NOC_ Sankalp.pdf15 Sep 2025
Clarification reg Sec 3 (1) ViolationFile: CA Certificate - Sales clarification.pdf11 Sep 2025
Annual Audit ReportFile: Annual Audit Report .pdf11 Sep 2025
Structural Stability CertificateFile: Structural Stability Certificate.PDF11 Sep 2025
Allotment letterFile: Proforma Allotment Letter.pdf11 Sep 2025
CHESCOM NOCFile: CESCOM NOC.pdf11 Sep 2025
STP DrawingFile: STP design drawing.jpg11 Sep 2025
RTC, survey 46/2-
Mutation, survey 46/2-
Encumbrance Certificate, survey 46/2-
Conversion/Alienation Order, survey 46/2-
Sale/Title/Gift Deed, survey 46/2-
JDA, survey 46/2-
Khatha, survey 46/2-
Registration CertificateFile: Company Registration Certificate.pdf-
Memorandum of AssociationFile: MOA.pdf-
Article of AssociationFile: AOA.pdf-
GST CertificateFile: GST Certificate.pdf-
Organization StructureFile: Organization Structure.pdf-
Certificate issued by CA Form 1File: F1 Certificate issued by Chartered Accountant.pdf-
Certificate issued by Architect Form 2File: F2 Certificate issued by Architect.pdf-
Certificate issued by Engineer Form 3File: F3 Certificate issued by Engineer.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Affidavit Non Litigation.pdf-
Balance Sheet 2023 - 2024File: Balance Sheet with CA UDIN alongwith schedules FY 2023-24.pdf-
Balance Sheet 2022 - 2023File: Balance Sheet with CA UDIN alongwith schedules FY 2022-23.pdf-
Balance Sheet 2021 - 2022File: Balance Sheet with CA UDIN alongwith schedules FY 2021-22.pdf-
Audited Profit and Loss Statement 2023 - 2024File: Profit and Loss Account with CA UDIN alongwith schedules FY 2023-24.pdf-
Audited Profit and Loss Statement 2022 - 2023File: Profit and Loss Account with CA UDIN alongwith schedules FY 2022-23.pdf-
Audited Profit and Loss Statement 2021 - 2022File: Profit and Loss Account with CA UDIN alongwith schedules FY 2021-22.pdf-
Income Tax Return Acknowledgement 2023 - 2024File: Income Tax Return Acknowledgemt - FY 2023-2024.pdf-
Income Tax Return Acknowledgement 2022 - 2023File: Income Tax Return Acknowledgemt - FY 2022-2023.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: Income Tax Return Acknowledgemt - FY 2021-2022.pdf-
Director's Report 2023 - 2024File: Director's Report - FY 2023-2024.pdf-
Director's Report 2022 - 2023File: Director's Report - FY 2022-2023.pdf-
Director's Report 2021 - 2022File: Director's Report - FY 2021-2022.pdf-
Cash Flow Statement 2023 - 2024File: Cash Flow Statement - FY 2023-2024.pdf-
Cash Flow Statement 2022 - 2023File: Cash Flow Statement - FY 2022-2023.pdf-
Auditor's Report 2023 - 2024File: Auditor's Report - FY 2024.pdf-
Auditor's Report 2022 - 2023File: Auditor's Report - FY 2022-2023.pdf-
Auditor's Report 2021 - 2022File: Auditor's Report - FY 2021-22.pdf-
License-
Site Plan-
Sectional Drawing of the apartments-
Structural Stability Certificate-
Project Specifications-
Clarification About Non-Production of Brochures-
Relinquishment Deeds-
Proforma AFS-
Proforma Allotment Letter-
Declaration (Form B)-
Affidavit 3 1-
JD AFFIDAVIT CUM DECLARATION-
Advocate Search Report-
Electricity - Self attested-

Promoter's earlier projects13

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date5 under way, not due yet7 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
SANKALP CENTRAL PHASE 3BCTS No.3360, Site No. 1 to 7, 1st Main Road (Jawa Main Road), Yadavagiri, MysoreOngoingJun 2032Not due yet
SANKALP CROWN PHASE 2BSite No. 15 and 16, 24 M Road, Yadavagiri, Devaraja Mohalla, 1st Main Road (Jawa Main Road)OngoingDec 2030Not due yet
SANKALP CENTRAL PHASE 3ACTS No.3360, Site No. 1 to 7, 1st Main Road (Jawa Main Road), Yadavagiri, MysoreOngoingJun 2030Not due yet
SANKALP CROWN PHASE 2Site No. 15 and 16, 1st Main Road (Jawa Main Road), Yadavagiri, Devaraja MohallaOngoingMar 2029Not due yet
SANKALP CROWN PHASE 1Site No. 15 and 16, 1st Main Road (Jawa Main Road), Yadavagiri, Devaraja MohallaOngoingMar 2028Not due yet
SANKALP WINDSOR HOUSEBBMP Khata No.1528/1493/1412 (SITE NO.1412), Judicial Layout Jakkur Plantation Village Yelahanka Ward , Bengaluru North , YelahankaOngoingDec 2025Not delivered
SANKALP TIARANo 106 8th Main , Jayalakshmi Puram, Devaraja Mohalla, MysoreCompleted-No date filed
SANKALP TEMPLE TREESy No 96/1 Vijayanagar 4th Stage, 2nd Phase RMP Layout Near Ring Road, Basavana Halli, MysoreCompleted-No date filed
SANKALP SQUARE363/10/11A/1 Lottegollahalli, Ward No 008, Yelahanka, BengaluruCompleted-No date filed
SANKALP SKY VILLAS1155 and 1156, Vijayanagar 1st Stage, Devaraja Mohalla, MysoreCompleted-No date filed
SANKALP REGIES418, Contoor Road, Gokulam 3rd Stage, MysoreCompleted-No date filed
SANKALP MAGNUM13/A, Industrial Suburb, 3rd Stage, Kille Mohalla, MysoreCompleted-No date filed
SANKALP IMPERIAL HOUSENo 677 N3 Vasanth Mahal Road, Nazarbad Mohalla, MysoreCompleted-No date filed

How this compares with Mysore

37%of this project is bookeddistrict median 34%
28%of Mysore projects moved their completion datethis one has not
0%of Mysore registrations are shown as withdrawn or revokedthis one is not

Computed across the 700+ Mysore projects on ReraGenie, from their own filings.

Keep SANKALP WELLINGTON PARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Mysore700+ in Mysore

2 kmSANKALP WELLINGTON PARKOther 4Dot size: filed unitsN

Filed coordinates, straight-line distance. 4 registered projects within 2 km.

Builder: SANKALP CONSTRUCTIONS PRIVATE LIMITED

SANKALP CONSTRUCTIONS PRIVATE LIMITED has 12 registrations on RERA Karnataka, including SANKALP WELLINGTON PARK and Sankalp Magnum. Its filings declare 19 earlier projects, 13 of them declared completed. Read the full track record. See more projects on the Mysore district page.

Frequently asked questions

What are my rights if SANKALP WELLINGTON PARK is delayed beyond 31 Dec 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SANKALP WELLINGTON PARK?

The registered promoter entity is SANKALP CONSTRUCTIONS PRIVATE LIMITED, a company as per the filing. Its CIN U45201KA1989PTC010315 and GSTIN 29AACCS5166N1ZQ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SANKALP WELLINGTON PARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SANKALP WELLINGTON PARK?

The professionals named in the filing: Architect: Jamuna Chalam; Engineer: Yogish Rao D V; Chartered Accountant: Santosh K L. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SANKALP WELLINGTON PARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SANKALP WELLINGTON PARK. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SANKALP WELLINGTON PARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.