Red flags

  • Completion date moved by 51 months
  • 4 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2025Possession promisedregistration recorded completed
18 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
36 of 166Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 52 documents Report an error

SANGHVI PARSSSVA CITY is a Others project by SANGHVI PREMISES PRIVATE LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700009886 on 22 Aug 2017. The registration is recorded completed; possession was promised by 7 Mar 2025. The completion date has moved by 51 months from the original filing. 130 of the 166 units on this registration are recorded sold or booked, and 18 of 22 construction stages are filed complete.

At a glance

Project

  • NameSANGHVI PARSSSVA CITY
  • TypeOthers
  • Location
    • maharashtra
    • Atgaon
    • Shahapur
    • Thane
    • 421601
  • Pincode421601
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700009886
  • ReraGenie IDRG-MH-26112

Builder

  • NameSANGHVI PREMISES PRIVATE LIMITED
  • Entity typeCompany
  • Managing DirectorRAMESH S SANGHVI
  • Other registrations7 more →
  • Completed5 of 8
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects19 →

Key dates

this monthRegisteredAug 2017First promiseDec 2020Revised toMar 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on22 Aug 2017
  • Promised completion7 Mar 2025
  • Revised completionRevised to 7 Mar 2025 (originally 29 Dec 2020)
  • Buildings2 building records
  • Documents filed52 files

Current status

78%130 of 166 units booked

Figures as on 16 Oct 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building 13NA987725102
Building 14NA98511364

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 16 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

Building 1382%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building 1482%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 16 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,008 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Jun 2025

Approvals and building plan

Sanctioning authorityTown Planning Department Thane Collector Office
Permissible FSI6835.34
Proposed, not sanctioned6,835 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSir Vithaldas Thakersay Trust Bldg, Fort, Mumbai 400001

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMahesh Jagtap & Associates
EngineerE Struct Consultancy P Ltd
Chartered AccountantVSC & Associates
PartnerRole in project
SANGHVI PREMISES PRIVATE LIMITED-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700009389Dec 2020 → Mar 2022

Reason as filed by the promoterThe Project is almost complete and we are now completing formalities for OC but since there is labour shortage in the area and becuase Lockdown very little manpower is available, please grant us one more year of extension. Please find attached herewith the Allottee resolution as per the Prescribed format of 8March 2021 circular.

EXT51700001820Dec 2020 → Jun 2020

Reason as filed by the promoterDue to delay in approvals, we need extension of one year.

EXT51700015264Dec 2020 → Mar 2024

Reason as filed by the promoterAPPLICATION FOR EXTENSION OF PROJECT COMPLETION DATE U/S 7(3) of the RERA ACT (Format - B) (Read with Circular No.28 of 2021 dated 8th March, 2021) Date: 14.03.2023 To The Maharashtra Real Estate Regulatory Authority, Mumbai. Sub.: Extension of time for the Project bearing Registration No. P51700009886. With reference to the subject matter, we hereby would like to apply for the extension u/s 7(3) of RERA Act of the registered project vide Registration No. P51700009886. As prescribed under Circular No.07/2019 dated 8thFebruary, 2019 and the consent of 51.67% of the allottee’s are enclosed herew

EA23072502127Dec 2020 → Mar 2025

Reason as filed by the promoterOur Project has been completed and Occupancy Certificate is also granted. Kindly process our application and grant us the extension till 07-03-2025.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 8 May 2025

Documents filed52

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: BUILDING NO 14 OC PLAN (1 of 5).pdf16 Oct 2025
Occupational CertificateFile: BUILDING NO 14 OC PLAN (2 of 5).pdf16 Oct 2025
Occupational CertificateFile: BUILDING NO 14 OC PLAN (3 of 5).pdf16 Oct 2025
Occupational CertificateFile: BUILDING NO 14 OC PLAN (4 of 5).pdf16 Oct 2025
Occupational CertificateFile: BUILDING NO 14 OC PLAN (5 of 5).pdf16 Oct 2025
Occupational CertificateFile: BUILDING NO 13 OC PLAN (1 of 6).pdf16 Oct 2025
Occupational CertificateFile: BUILDING NO 13 OC PLAN (2 of 6).pdf16 Oct 2025
Occupational CertificateFile: BUILDING NO 13 OC PLAN (3 of 6).pdf16 Oct 2025
Occupational CertificateFile: BUILDING NO 13 OC PLAN (4 of 6).pdf16 Oct 2025
Occupational CertificateFile: BUILDING NO 13 OC PLAN (5 of 6).pdf16 Oct 2025
Occupational CertificateFile: BUILDING NO 13 OC PLAN (6 of 6).pdf16 Oct 2025
Occupational CertificateFile: BUILDING NO 13 OC.pdf17 Sep 2025
Occupational CertificateFile: BUILDING NO 14 OC.pdf17 Sep 2025
Declaration in FORM BFile: Form - B.pdf9 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf8 May 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Copy and Architect Certificate.pdf8 May 2025
Deviation Report with respect to Allotment letterFile: No Deviation report for allotment letter.pdf8 May 2025
Deviation Report with respect to model copy of AgreementFile: No deviation report for agreement for Sale.pdf8 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Bldg 13 14 Form 2A.pdf8 May 2025
Proforma of Agreement for saleFile: Agreement for Sale Sanghvi Parsssva City.pdf20 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1.pdf4 Feb 2025
Certificates of CA (Form 3)File: form 3.pdf19 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Sanghvi Parsssva City (Sold -Unsold Inventory)13-14.pdf19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Bldg 13, 14 Form 2A FY2023.pdf19 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate ( New ).pdf5 Jun 2023
Details of encumbrances concerned to FinanceFile: Declaration of Legal Encumberance.pdf5 May 2023
Details of encumbrances concerned to LegalFile: Declaration of Legal Encumberance.pdf5 May 2023
Declaration about Commencement CertificateFile: Declaration of CC.pdf5 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration of Bank Account.pdf5 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Bldg 13,14 Form 5 2019.pdf24 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Bldg 13,14 Form 5 2020.pdf24 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Bldg 13,14 Form 5 2021.pdf24 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Bldg 13,14 Form 5 2022.pdf24 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Bldg 13, 14 Form 2A FY2019.pdf20 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Bldg 13, 14 Form 2A FY2020.pdf20 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Bldg 13, 14 Form 2A FY2021.pdf20 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Bldg 13, 14 Form 2A FY2022.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: Sanghvi Parsssva City (Sold -Unsold Inventory)13-14 (1).pdf18 Apr 2023
Certificates of CA (Form 5)File: golden city form 5- Bldg 13-14.pdf24 May 2019
Layout approvalFile: NA Order (IOD).pdf29 Jul 2017
Building plan approvalFile: Sanghvi Golden City Plan.pdf29 Jul 2017
PAN CardFile: pan.pdf29 Jul 2017
Copy of the legal title reportFile: Title Certificate.pdf29 Jul 2017
Details of encumbrancesFile: Index-II.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: NA Order (IOD).pdf29 Jul 2017
Building Plan Approval (IOD)File: Sanghvi Golden City Plan.pdf29 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: C C.pdf29 Jul 2017
Declaration in FORM BFile: FORM B.pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 Architect Certificate.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Engineer.pdf29 Jul 2017
Certificates of CA (Form 3)File: Form-3 SPB 13-14.pdf29 Jul 2017
Proforma of Allotment letterFile: ALLOTMENT AND AGREEMENT FOR SALE-SANGHVI'S SHRI PARRSSSVA -PDF.pdf29 Jul 2017

Promoter's earlier projects9

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

9 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Sanghvi Valley Phase-IIKalwa124CompletedDec 2015Late, Feb 2016
Sanghvi EcocityMira Road226CompletedDec 2015Late, Apr 2016
Sanghvi Nisarg - Phase IILonavla12CompletedJun 2015Late, Jul 2015
Shree Mohankheda HeightsByculla60CompletedDec 2013Late, Mar 2014
Sanghvi GalaxyGirgaon34CompletedDec 2011Late, Nov 2012
Sanghvi ExoticaDahisar75CompletedDec 2011Late, Jul 2012
Sanghvi NakshtraNasik96CompletedJul 2011Late, Aug 2011
Sanghvi Nisarg - Phase ILonavla44CompletedMar 2011Late, Dec 2015
Sanghvi Valley Phase - IKalwa176CompletedDec 2009Late, May 2013

How this compares with Thane

78%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 51 months
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SANGHVI PARSSSVA CITY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Atgaon7,600+ in Thane

2 kmSANGHVI PARSSSVA CITYCompleted 2Lapsed / revoked 2Other 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 6 registered projects within 2 km.

Builder: SANGHVI PREMISES PRIVATE LIMITED

Sanghvi Premises Private Limited has 8 registrations on MahaRERA, including Sanghvi Evana and SANGHVI SOLITAIRE. Its filings disclose 19 earlier MahaRERA projects: declares 1 of 18 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SANGHVI PARSSSVA CITY is delayed beyond 7 Mar 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SANGHVI PARSSSVA CITY?

The registered promoter entity is SANGHVI PREMISES PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SANGHVI PARSSSVA CITY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SANGHVI PARSSSVA CITY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SANGHVI PARSSSVA CITY?

The professionals named in the filing: Architect: Mahesh Jagtap & Associates; Engineer: E Struct Consultancy P Ltd; Chartered Accountant: VSC & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SANGHVI PARSSSVA CITY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SANGHVI PARSSSVA CITY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SANGHVI PARSSSVA CITY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.