Home / Browse projects / Pune, Maharashtra / SANGAMESHWAR PHASE A

Completed No litigation declared Others project

SANGAMESHWAR PHASE A

By SABLE SANJIVANI SASWAD INFRASTRUCTURE LLP

RG-MH-13217 · RERA P52100022448 · Last updated on MahaRERA portal: 3 Oct 2023

Source: official MahaRERA filing

Red flags

  • Completion date moved by 3 months
  • 4 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2022Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

SANGAMESHWAR PHASE A is a Others project by SABLE SANJIVANI SASWAD INFRASTRUCTURE LLP in Pune, Maharashtra, registered with MahaRERA as P52100022448 on 24 Sep 2019. The registration is recorded completed; possession was promised by 31 Dec 2022. The completion date has moved by 3 months from the original filing.

At a glance

Project

  • NameSANGAMESHWAR PHASE A
  • TypeOthers
  • Location
    • PUNE SASWAD ROAD
    • SASWAD
    • Sasvad (M Cl)
    • Purandhar
    • Pune
    • 412301
  • Pincode412301
  • RERA no.P52100022448
  • ReraGenie IDRG-MH-13217

Builder

  • NameSABLE SANJIVANI SASWAD INFRASTRUCTURE LLP
  • Entity typePartnership
  • GSTIN27ADPFS1639F1ZS
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersNITIN GOVIND SABLE, ROHIT RAJIV SABLE
  • Other registrations2 more →
  • Completed2 of 3
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredSep 2019First promiseSep 2022Revised toDec 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on24 Sep 2019
  • Promised completion31 Dec 2022
  • Revised completionRevised to 31 Dec 2022 (originally 30 Sep 2022)
  • Buildings1 building record
  • Documents filed75 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SANGAMESHWAR PHASE ANA100000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Oct 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

SANGAMESHWAR PHASE A: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 3 Oct 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes75%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes75%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,933 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI6857.39
Proposed, not sanctioned6,857 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPUNE FC ROAD

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMILIND PANCHAL
EngineerSAGAR DOIPHODE
Chartered AccountantSARANG RAJHANS
PartnerRole in project
SABLE SANJIVANI SASWAD INFRASTRUCTURE LLP-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100017581Sep 2022 → Sep 2023

Reason as filed by the promoter2. Explanatory note: DUE TO MARKET VOLATILITY IN CASE OF AFFORDABLE HOUSING AND CURRENTLY LESS THAN 35% INVENTORY IS BOOKED AND REGISTERED IN THE NAME OF THE CUSTOMER FOR THE PROJECT SANGAMESHWAR PHASE A. DEVELOPER IS UNABLE TO KEEP THE SPEED OF CONSTRUCTION AT PAR. DESPITE OF THIS FACT: A) 100% OF RCC WORK, 100% OF BRICKWORK & PLASTER WORK ALMOST COMPLETED, AND B) LIFT WORK & FIRE FIGHTING SYSTEM ALMOST COMPLETED ONLY LIFT NOC AND FIRE NOC FROM COMPETENT AUTHORITY ARE PENDING. C) INTERNAL ELECTRIC WORK 100% DONE AND ELECTRIC TRANSFORMER IS ERRECTED AT SITE ONLY CHARGING IS PENDING. D) INTERNA

EXT52100015273Sep 2022 → Jun 2023

Reason as filed by the promoterDUE TO MARKET VOLATILITY IN CASE OF AFFORDABLE HOUSING AND CURRENTLY LESS THAN 35% INVENTORY IS BOOKED AND REGISTERED IN THE NAME OF THE CUSTOMER FOR THE PROJECT SANGAMESHWAR PHASE A. DEVELOPER IS UNABLE TO KEEP THE SPEED OF CONSTRUCTION AT PAR. DESPITE OF THIS FACT: A) 100% OF RCC WORK, 100% OF BRICKWORK & PLASTER WORK ALMOST COMPLETED, AND B) LIFT WORK & FIRE FIGHTING SYSTEM ALMOST COMPLETED ONLY LIFT NOC AND FIRE NOC FROM COMPETENT AUTHORITY ARE PENDING. C) INTERNAL ELECTRIC WORK ALMOSDT 95% DONE AND ELECTRIC TRANSFORMER IS ERRECTED AT SITE ONLY CHARGING IS PENDING. D) INTERNAL PLUMBING WOR

EXT52100008954Sep 2022 → Dec 2022

Reason as filed by the promoterDUE TO CURRENT PANDEMIC SITUATION AND MARKET VOLATILITY IN CASE OF AFFORDABLE HOUSING, DEVELOPER IS HEREBY APPLYING FOR EXTENSION.

EXT52100012984Sep 2022 → Apr 2023

Reason as filed by the promoterDUE TO MARKET VOLATILITY IN CASE OF AFFORDABLE HOUSING AND CURRENTLY LESS THAN 35% INVENTORY IS BOOKED AND REGISTERED IN THE NAME OF THE CUSTOMER FOR THE PROJECT SANGAMESHWAR PHASE A. DEVELOPER IS UNABLE TO KEEP THE SPEED OF CONSTRUCTION AT PAR, DESPITE OF THIS FACT 100% OF RCC WORK, 90% OF BRICKWORK & PLASTER WORK ALMOST COMPLETED AND LIFT CONTRACT IS ALREADY GIVEN. INTERNAL ELECTRIC WORK ALMOSDT 70% DONE. INTERNAL PLUMBING WORK ALMOST 70% DONE. EXTERNAL DEVELOPMENT WORK ALMOST 50% DONE. 45% OF OTHER FINISHING WORK IS COMPLETED. THEREFORE DEVELOPER IS HEREBY APPLYING FOR EXTENSION FOR FURTHER

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Sep 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Sep 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Jan 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Jan 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 20 Jul 2023

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: FORM-4 LLP (1).pdf3 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A- After Work .pdf16 Sep 2023
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf16 Sep 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Phase-1 A Building -final compention certificate.pdf20 Jul 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion cum Occupancy Certificate.pdf28 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Reduced.pdf10 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 2023 Reduced.pdf10 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FROM 2A.pdf10 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold Inventory Reduced.pdf10 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March 2023 Reduced.pdf10 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_CERTIFICATE.pdf17 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: LLP RERA FORM 5.pdf17 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECHT CERTIFICATE.pdf16 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE.pdf16 Jan 2023
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY.pdf16 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA- Form 1 Architect Certificate.pdf28 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA LLP FORM -2.pdf28 Sep 2022
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf28 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- CA CERTIFICATE RERA.pdf28 Sep 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: LLP RERA FORM 5.pdf8 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf7 Jun 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERIS CERTIFICATE.pdf7 Jun 2022
Engineers Certificate on Quality Assurance (Form 2A)File: FROM 2A.pdf7 Jun 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FROM 2A.pdf7 Jun 2022
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY.pdf7 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf7 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: fORM 1.pdf25 Feb 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf25 Feb 2022
CERSAI detailsFile: CREDAI CERTIFIACTE 21-22.pdf25 Feb 2022
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf25 Feb 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf25 Feb 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf29 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf29 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A)File: Form 2A.pdf29 Oct 2021
Disclosure of sold/ booked inventoryFile: SOLD INVENTRY.pdf29 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf29 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf2 Jul 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form- 2.pdf2 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A)File: Form-2A.pdf2 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form-2A.pdf2 Jul 2021
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf2 Jul 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf2 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 2019-20.pdf2 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2020-21.pdf2 Jul 2021
Declaration about Commencement CertificateFile: Sector 01 with A build CC 2059.pdf1 Jul 2021
Declaration about Commencement CertificateFile: Commencement Certificate.pdf1 Jul 2021
Building plan approvalFile: Revised Plan Compressed.pdf15 Jan 2021
Building plan approvalFile: Revised Plan Compressed.pdf15 Jan 2021
Building Plan Approval / NA Order for plotted developmentFile: Revised Plan Compressed.pdf15 Jan 2021
Building Plan Approval / NA Order for plotted developmentFile: Revised Plan Compressed.pdf15 Jan 2021
Commencement Certificates / NA Order for plotted developmentFile: Sector 01 with A build CC 2059.pdf15 Jan 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf15 Jan 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Compressed.pdf15 Jan 2021
Engineers Certificate on Quality Assurance (Form 2A)File: Form 2A Compressed.pdf15 Jan 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Chartered Accountant Certificate Compressed.pdf15 Jan 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf14 Feb 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Reduced.pdf14 Feb 2020
Engineers Certificate on Quality Assurance (Form 2A)File: Form 2A Reduced.pdf14 Feb 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Reduced.pdf14 Feb 2020
Details of encumbrancesFile: Self Declaration.pdf20 Sep 2019
Declaration in FORM BFile: Form B.pdf20 Sep 2019
Layout approvalFile: Collector office NA Order.pdf17 Sep 2019
Building plan approvalFile: Building Plan.PDF17 Sep 2019
PAN CardFile: PAN.PDF17 Sep 2019
Copy of the legal title reportFile: Title Report.pdf17 Sep 2019
Copy of Layout Approval (in case of layout)File: Collector office NA Order.pdf17 Sep 2019
Building Plan Approval / NA Order for plotted developmentFile: Building Plan.PDF17 Sep 2019
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf17 Sep 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf17 Sep 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf17 Sep 2019
Engineers Certificate on Quality Assurance (Form 2A)File: FORM 2A.pdf17 Sep 2019
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf17 Sep 2019
Proforma of Allotment letterFile: Agreement.PDF17 Sep 2019
Proforma of Allotment letterFile: Allotment Letter.PDF17 Sep 2019
OtherFile: Brochure.pdf17 Sep 2019

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 3 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SANGAMESHWAR PHASE A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SASWAD13,700+ in Pune

Builder: SABLE SANJIVANI SASWAD INFRASTRUCTURE LLP

SABLE SANJIVANI SASWAD INFRASTRUCTURE LLP has 3 registrations on MahaRERA, including SANGAMESHWAR PHASE A and SANGAMESHWAR VILLA PLOTTING. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SANGAMESHWAR PHASE A is delayed beyond 31 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SANGAMESHWAR PHASE A?

The registered promoter entity is SABLE SANJIVANI SASWAD INFRASTRUCTURE LLP, a partnership as per the filing. Its GSTIN 27ADPFS1639F1ZS can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SANGAMESHWAR PHASE A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SANGAMESHWAR PHASE A?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SANGAMESHWAR PHASE A?

The professionals named in the filing: Architect: MILIND PANCHAL; Engineer: SAGAR DOIPHODE; Chartered Accountant: SARANG RAJHANS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SANGAMESHWAR PHASE A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SANGAMESHWAR PHASE A. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SANGAMESHWAR PHASE A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.