SANDESH PARK VIEW
By AMPLE MERCANTILE PRIVATE LIMITED
RG-MH-03755 · RERA P50500030670 · Last updated on MahaRERA portal: 26 Dec 2024
Source: official MahaRERA filing
Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SANDESH PARK VIEW is a Plotted project by AMPLE MERCANTILE PRIVATE LIMITED in Nagpur, Maharashtra, registered with MahaRERA as P50500030670 on 8 Sep 2021. The registration is recorded completed; possession was promised by 31 Dec 2025. 48 of the 48 units on this registration are recorded sold or booked. 1 complaint is on record with the regulator.
At a glance
Project
- NameSANDESH PARK VIEW
- TypePlotted
- Location
- WARDHA ROAD
- NEAR SANDESH CITY
- Jamtha
- Nagpur (Rural)
- Nagpur
- 441108
- Pincode441108
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500030670
- ReraGenie IDRG-MH-03755
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on8 Sep 2021
- Promised completion31 Dec 2025
- Revised completionNone
- BuildingsNot stated in filing
- Documents filed77 files
Current status
Figures as on 26 Dec 2024, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 26 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 26 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Aditya Indurkar |
| Engineer | Junaid Khan |
| Chartered Accountant | Manish Shukla |
| Chartered Accountant | CA Ankit Talreja |
| Partner | Role in project |
|---|---|
| AMPLE MERCANTILE PRIVATE LIMITED | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12502718 | NILAY VILASRAO DESHMUKH | AMPLE MERCANTILE PRIVATE LIMITED | 03/08/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Aug 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 24 Aug 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Aug 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 5 Nov 2024
Documents filed77
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sep-21.pdf | 26 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: dec-21.pdf | 26 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mar-22.pdf | 26 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: June-22.pdf | 26 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: S-22.pdf | 26 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: dec-22.pdf | 26 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mar-23.pdf | 26 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: June-23.pdf | 26 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: sep-23.pdf | 26 Dec 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: FORM-4.pdf | 5 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 004, 4TH RL R LIST 175 8-5-2023.pdf | 5 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FINAL RL KH NO-175- NMRDA-JAMTHA_0001 (5).pdf | 5 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sandesh Park View_Form-1- Architect Certificate_Sep-24.pdf | 11 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Sandesh Park View_Form-2A_Mar-23.pdf | 20 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Sandesh Park View_Form-2A_Mar-23.pdf | 20 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sandesh Park View_Form-1- Architect Certificate_June-24.pdf | 13 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sandesh Park View Sep 2021.pdf | 1 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sandesh Park View Dec 2021.pdf | 1 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sandesh Park View Mar 2022.pdf | 1 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sandesh Park View Jun 2022.pdf | 1 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sandesh Park View Sep 2022.pdf | 1 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sandesh Park View Dec 2022.pdf | 1 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sandesh Park View Mar 2023.pdf | 1 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sandesh Park View Jun 2023.pdf | 1 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sandesh Park View Sep 2023.pdf | 1 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sandesh Park View Dec 2023.pdf | 1 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sandesh Park View Mar 2024.pdf | 1 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 MAR 2023 SANDESH PARK VIEW.pdf | 4 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sandesh Park View_RERA 3_Registration_Sep-22.pdf | 17 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sandesh Park View_RERA 3_Registration_Dec-22.pdf | 17 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sandesh Park View_RERA 3_Registration_mar-23.pdf | 17 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sandesh Park View_RERA 3_Registration_june-23.pdf | 17 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sandesh Park View_RERA 3_Registration_Sep-23.pdf | 17 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Sandesh Park View-4_Form-2A_Mar-23.pdf | 20 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD_UNSOLD_INVENTORY_Sandesh Park View_Sep-22.pdf | 20 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD_UNSOLD_INVENTORY_Sandesh Park View_Dec-22.pdf | 20 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD_UNSOLD_INVENTORY_Sandesh Park View_Mar-23.pdf | 20 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD_UNSOLD_INVENTORY_Sandesh Park View_June-23.pdf | 20 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD_UNSOLD_INVENTORY_Sandesh Park View_Sep-23.pdf | 20 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sandesh Park View_RERA 3_Registration_Sep-22.pdf | 20 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sandesh Park View_RERA 3_Registration_Dec-22.pdf | 20 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sandesh Park View_RERA 3_Registration_mar-23.pdf | 20 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sandesh Park View_RERA 3_Registration_june-23.pdf | 20 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sandesh Park View_RERA 3_Registration_Sep-23.pdf | 20 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sandesh Park View_RERA 3_Registration_mar-23.pdf | 20 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sandesh Park View_RERA 3_Registration_Sep-23.pdf | 20 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 001 Ample Form 2A Dec-21.pdf | 12 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 002 Ample Form 2A March-22.pdf | 12 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: 001 Q3 21-22 Ample Mercantile.pdf | 10 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: 002 Q4 21-22 Ample Mercantile.pdf | 10 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: 003 Q1 22-23 Ample Mercantile.pdf | 10 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: 004 Q2 22-23 Ample Mercantile.pdf | 10 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: 005 Q3 22-23 Ample Mercantile.pdf | 10 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Ample Rera 31-12-21.pdf | 8 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Ample Rera 31-03-22_compressed.pdf | 8 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Ample Rera 30-6-22_compressed.pdf | 8 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 FY 21-22.pdf | 8 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate 31-12-21_compressed.pdf | 7 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate 31-03-22_compressed.pdf | 7 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate 30-06-22_compressed.pdf | 7 Apr 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Kh 175 1st RL Dt 21 06 2022.pdf | 25 Jan 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2nd RL Kh No 175.pdf | 25 Jan 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 3RD Kh 175 2nd RL Dt 19 01 2023.pdf | 25 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3CA Kh 175.pdf | 28 Aug 2021 |
| Declaration in FORM BFile: Form B 175 Sandesh Park View_compressed.pdf | 25 Aug 2021 |
| Layout approvalFile: 175 Layout Plan.pdf | 24 Aug 2021 |
| Building plan approval or NA orderFile: 175 Commencement Certificate.pdf | 24 Aug 2021 |
| PAN CardFile: PAN - AMPLE.pdf | 24 Aug 2021 |
| Copy of the legal title reportFile: Title Report 175.pdf | 24 Aug 2021 |
| Details of encumbrancesFile: Ample Encumbrance.pdf | 24 Aug 2021 |
| Copy of Layout Approval (in case of layout)File: 175 Layout Plan.pdf | 24 Aug 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 175 Commencement Certificate.pdf | 24 Aug 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: 175 Commencement Certificate.pdf | 24 Aug 2021 |
| Declaration about Commencement CertificateFile: Ample Form D.pdf | 24 Aug 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S CERTIFICATE Kh 175.pdf | 24 Aug 2021 |
| Proforma of Allotment letterFile: Agreement to Sale Format_compressed.pdf | 24 Aug 2021 |
| Proforma of Allotment letterFile: Ample Allotment Format.pdf | 24 Aug 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 77 filed documents as one ZIP, foldered, with a manifest
Keep SANDESH PARK VIEW on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NEAR SANDESH CITY2,800+ in Nagpur
Filed coordinates, straight-line distance. 48 registered projects within 2 km.
Kanher Nagri Developers
KANHER NAGRI DEVELOPERS
MAHALAXMI NAGAR 6
MAHALAXMI ESTATE
MAHALAXMI NAGAR 4
PADMALAXMI DEVELOPERS
Moreshwar park 4
PRASANNA PLANNERS
PRIME PLATINUM
UMAKANT VITTHAL MENDHE
MAULI NAGAR 8
MAULI INFRATECH
See every Nagpur project, with the district possession charts
Builder: AMPLE MERCANTILE PRIVATE LIMITED
AMPLE MERCANTILE PRIVATE LIMITED has 4 registrations on MahaRERA, including SANDESH PARK VIEW and SANDESH PARK VIEW - 2. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if SANDESH PARK VIEW is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SANDESH PARK VIEW?
The registered promoter entity is AMPLE MERCANTILE PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SANDESH PARK VIEW?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SANDESH PARK VIEW?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for SANDESH PARK VIEW?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SANDESH PARK VIEW?
The professionals named in the filing: Architect: Aditya Indurkar; Engineer: Junaid Khan; Chartered Accountant: Manish Shukla; Chartered Accountant: CA Ankit Talreja. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SANDESH PARK VIEW?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback