Completed No litigation declared Residential / Group Housing project

Sandesh City Apartment 1

By Sandesh Infrastructures Pvt Ltd

RG-MH-02151 · RERA P50500006822 · Last updated on MahaRERA portal: 21 Jul 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 7 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2023Possession promisedregistration recorded completed
40 of 44Construction stages doneacross 4 buildings; furthest along: Podiums (if any), 3%
0Complaints at MahaRERAon this registration
Jump to the 38 documents Report an error

Sandesh City Apartment 1 is a Residential / Group Housing project by Sandesh Infrastructures Pvt Ltd in Nagpur, Maharashtra, registered with MahaRERA as P50500006822 on 16 Aug 2017. The registration is recorded completed; possession was promised by 30 Dec 2023.

At a glance

Project

  • NameSandesh City Apartment 1
  • TypeResidential / Group Housing
  • Location
    • Jamtha
    • Nagpur (Rural)
    • Nagpur
    • 441122
  • Pincode441122
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500006822
  • ReraGenie IDRG-MH-02151

Builder

  • NameSandesh Infrastructures Pvt Ltd
  • Entity typeCompany
  • ChairpersonRamdeo Pralhadrai Agrawal
  • Other registrations7 more →
  • Completed8 of 8

Key dates

this monthRegisteredAug 2017PromisedDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on16 Aug 2017
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings4 building records
  • Documents filed38 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Stella 1NA80000
Stella 2NA80000
Stella 3NA80000
SterlingNA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 21 Jul 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

40 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Podiums (if any), at 3%.

Stella 191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)3%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Stella 291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)2%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Stella 391%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)3%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Sterling91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)2%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 21 Jul 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area46,335 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI50190.46
Proposed, not sanctioned50,190 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCivil lines nagpur

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr. Aditya indurkar
EngineerAshish Shivarkar
EngineerAman kumar
Chartered AccountantCA ANKIT TALREJA
PartnerRole in project
Sandesh Infrastructures Pvt Ltd-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 May 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 30 Dec 2023

Documents filed38

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: SANDESH CITY APARTMENTS 1_RERA 3_June-24.pdf21 Jul 2024
Certificates of CA (Form 3)File: SANDESH CITY APARTMENTS 1_RERA 3_Mar-24.pdf25 Apr 2024
Architect’s Certificate on Completion of Project (Form 4)File: FORM-4.pdf25 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf22 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project) (1).pdf22 Jan 2024
Certificates of CA (Form 3)File: 6 Certificates of CA (Form 3) (1).pdf22 Jan 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC-2.pdf30 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A-2019-20.pdf24 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A-2020-21.pdf24 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A 2021-22.pdf24 Nov 2022
Declaration about Commencement CertificateFile: 1 Form 3, Appt 1, June 19_compressed_11zon.pdf3 Jan 2022
Certificates of CA (Form 3)File: 2 Form 3, Appt 1, Sept 19_compressed_11zon.pdf3 Jan 2022
Certificates of CA (Form 3)File: 3 Form 3, Appt 1, Dec 19_compressed_11zon.pdf3 Jan 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: KH NO 167 AND 168 , SANDESH CITY PART-OC 03-09-2021 OWNER COPY-.pdf15 Dec 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: appt 1 Form 1 ARCHITECT'S CERTIFICATE.pdf14 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 APPT 1 18-19.pdf10 Dec 2019
Certificates of CA (Form 3)File: A1-Form 3-Q4-18-19.pdf22 Nov 2019
Certificates of CA (Form 3)File: Form 3, Appt-1, March 18.pdf24 Jul 2019
Certificates of CA (Form 3)File: Form 3, Appt 1, Sept 18.pdf24 Jul 2019
Certificates of CA (Form 5)File: Appt 1 Form 5.pdf22 Jul 2019
Commencement Certificates / NA Order for plotted developmentFile: Building Permit.pdf25 May 2018
Layout approvalFile: Sandesh City I Layout Map.pdf31 Jul 2017
Building plan approvalFile: Sandesh City I Map.pdf31 Jul 2017
Building plan approvalFile: Sandesh City II Map.pdf31 Jul 2017
Building plan approvalFile: Sandesh City III Map.pdf31 Jul 2017
PAN CardFile: Sandesh PAN.pdf31 Jul 2017
Copy of the legal title reportFile: TITAL VERIFICATION REPORT.pdf31 Jul 2017
Details of encumbrancesFile: Encumbrance sandesh city 1.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: Sandesh City I Layout Map.pdf31 Jul 2017
Building Plan Approval (IOD)File: Sandesh City I Map.pdf31 Jul 2017
Building Plan Approval (IOD)File: Sandesh City II Map.pdf31 Jul 2017
Building Plan Approval (IOD)File: Sandesh City III Map.pdf31 Jul 2017
Declaration in FORM BFile: Form B-min.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architech Certificate 1.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sandesh City I.pdf31 Jul 2017
Certificates of CA (Form 3)File: Form 3 Ca Certificate Apartment 1.PDF31 Jul 2017
Proforma of Allotment letterFile: Allotment letter Sandesh city apartments 1.pdf31 Jul 2017
Proforma of Allotment letterFile: Agreement to Sale Sandesh City I.pdf31 Jul 2017

How this compares with Nagpur

13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is completed

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sandesh City Apartment 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Jamtha2,800+ in Nagpur

Builder: Sandesh Infrastructures Pvt Ltd

Sandesh Infrastructures Pvt Ltd has 8 registrations on MahaRERA, including Sandesh City Apartment 1 and Sandesh City Apartments 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if Sandesh City Apartment 1 is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sandesh City Apartment 1?

The registered promoter entity is Sandesh Infrastructures Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sandesh City Apartment 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sandesh City Apartment 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sandesh City Apartment 1?

The professionals named in the filing: Architect: Ar. Aditya indurkar; Engineer: Ashish Shivarkar; Engineer: Aman kumar; Chartered Accountant: CA ANKIT TALREJA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sandesh City Apartment 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sandesh City Apartment 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sandesh City Apartment 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.