Home / Browse projects / Mumbai Suburban, Maharashtra / SANA ENCLAVE

Registered No litigation declared Others project

SANA ENCLAVE

By SANA ENTERPISES

RG-MH-95135 · RERA P51800046890 · Last updated on MahaRERA portal: 20 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 28 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Sep 2027Possession promisedmoved 28 months from the original
2 of 11Construction stages donefurthest along: Slabs of Super Structure, 80%
30 of 30Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 83 documents Report an error

SANA ENCLAVE is a Others project by SANA ENTERPISES in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800046890 on 16 Sep 2022. Possession is promised by 30 Sep 2027. The completion date has moved by 28 months from the original filing. 0 of the 30 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameSANA ENCLAVE
  • TypeOthers
  • Location
    • PLOT BEARING NO. 139
    • HISSA NO. 2
    • CTS NO. 6034 TO 6039 OF VILLAGE KOLE-KALYAN H/E WARD
    • CHURCH ROAD
    • KALINA
    • SANTACRUZ EAST
    • Andheri
    • Mumbai Suburban
    • 400029
  • Pincode400029
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800046890
  • ReraGenie IDRG-MH-95135

Builder

  • NameSANA ENTERPISES
  • Entity typePartnership
  • PartnerSHAUKAT ALI KHAN

Key dates

this monthRegisteredSep 2022First promiseMay 2025Revised toSep 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Sep 2022
  • Promised completion30 Sep 2027
  • Revised completionRevised to 30 Sep 2027 (originally 31 May 2025)
  • Buildings1 building record
  • Documents filed83 files

Current status

0%0 of 30 units booked
38.2%Work done, per cost certificate

Figures as on 20 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SANA ENCLAVENA18927330

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 80%.

SANA ENCLAVE: 42% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises45%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.15%

Progress on shared amenities15

As on 20 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area508 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on25 Nov 2025

Approvals and building plan

Sanctioning authorityBRHIHAN MUMBAI MUNICIPAL CORPORATION
Permissible FSI494.14
Proposed, not sanctioned494 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKALINA SANTACRUZ EAST
Estimated costRs 6.17 cr
Cost incurredRs 2.36 cr
Work done38.25%
BuildingWingEstimatedIncurred
SANA ENCLAVENARs 6.17 crRs 2.36 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCHANDRASHEKHAR
EngineerASSOCIATED STRUTURATANTS LLP
EngineerMohammed Ashfaq Shaikh
Chartered AccountantARUN KOLAMBEKAR
Chartered AccountantPRASANTA KUMAR ROYBARMAN
Chartered AccountantAAYUSHI JAIN PAL
Chartered AccountantPRASANTA KUMAR RAYBARMAN
Chartered AccountantSHASHANK RAJENDRA JAIN
PartnerRole in project
SANA ENTERPISES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA14022619840May 2025 → Sep 2027

Reason as filed by the promoterthe construction work of the project has been completed more than 50 percent. The remaining works pertaining to balance floors , Internal walls, Sanitary fittings, Staircases, installation of lifts, water pumps, firefighting fittings, finishing work and other related components are pending which we undertake to complete by 30/06/2027. Other miscellaneous works such as finishing, fire protection systems, water drainage systems, etc., will also be completed by 30/09/2027.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Aug 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Aug 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Sep 2027

Documents filed83

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FROM 1 31-03-2026.pdf20 Jun 2026
Withdrawal Update Form 2File: Form 2 Engineers Certificate 3132026.pdf20 Jun 2026
Withdrawal Update Form 3File: Form 3 Mar 2026 duly signed.pdf20 Jun 2026
Form 2A (FY 2025-2026)File: Form 2A Sana Enclave 25-26 (1).pdf20 Jun 2026
Form 1File: Form 1- 3rd Oct 2022.pdf7 Mar 2026
Form 2File: Form 2 30-09-2022.pdf7 Mar 2026
Form 3File: FORM 3.pdf7 Mar 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventory 30 09 2022.pdf7 Mar 2026
Withdrawal Update Form 1File: Form 1 Arch Cert (July to Sep 2025).pdf7 Mar 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate 31 12 2025.pdf7 Mar 2026
Withdrawal Update Form 2File: Form 2_30-09-2025.pdf7 Mar 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate 31 12 2025.pdf7 Mar 2026
Withdrawal Update Form 3File: FORM 3 30092025.pdf7 Mar 2026
Withdrawal Update Form 3File: Form 3 enclave 31122025.pdf7 Mar 2026
Form 2A (FY 2022-2023)File: FROM 2A 31032023.pdf7 Mar 2026
Form 2A (FY 2023-2024)File: FORM 2A 3132024.pdf7 Mar 2026
Form 2A (FY 2024-2025)File: FROM 2A 2024-25.pdf7 Mar 2026
Form 5 (FY 2022-2023)File: Form 5 - Sana Enclave 22-23 signed.pdf7 Mar 2026
Form 5 (FY 2023-2024)File: Form 5 - Sana Enclave 23-24 Signed.pdf7 Mar 2026
Form 5 (FY 2024-2025)File: Form 5 - Sana Enclave 24-25 Signed.pdf7 Mar 2026
Withdrawal Update Form 1File: Form 1 Arch Cert (Apr to June 2025).pdf28 Jan 2026
Withdrawal Update Form 2File: Form 2_30-06-2025.pdf28 Jan 2026
Withdrawal Update Form 3File: FORM 3 30062025.pdf28 Jan 2026
Form 1File: Form 1- 3 Jan 2023.pdf27 Jan 2026
Form 2File: Form 2 31-12-2023.pdf27 Jan 2026
Form 3File: FORM 3 31122022.pdf27 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventory 31 12 2022.pdf27 Jan 2026
Form 1File: form 1- 3rd April 2023.pdf27 Jan 2026
Form 2File: From 2 31-03-2023.pdf27 Jan 2026
Form 3File: FORM 3 31032023.pdf27 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventory 31 03 2023.pdf27 Jan 2026
Form 1File: Form 1- 6th July 2023.pdf27 Jan 2026
Form 2File: Form 2 30-06-2023.pdf27 Jan 2026
Form 3File: FORM 3 30062023.pdf27 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventory 30 06 2023.pdf27 Jan 2026
Form 1File: Form 1- 4th OCT 2023.pdf27 Jan 2026
Form 2File: Form 2 30-09-2023.pdf27 Jan 2026
Form 3File: FORM 3 30092023.pdf27 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventory 30 09 2023.pdf27 Jan 2026
Form 1File: Form 1- 5th Jan 2024.pdf27 Jan 2026
Form 2File: Form 2 31-12-2023.pdf27 Jan 2026
Form 3File: FORM 3 31122023.pdf27 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventory 31 12 2023.pdf27 Jan 2026
Form 1File: Form 1- 3rd April 2024.pdf27 Jan 2026
Form 2File: From 2 31-03-2024.pdf27 Jan 2026
Form 3File: FORM 3 31032024.pdf27 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventory 31 03 2024.pdf27 Jan 2026
Form 1File: Form 1- 5th July 2024.pdf27 Jan 2026
Form 2File: Form 2 30-06-2024.pdf27 Jan 2026
Form 3File: FORM 3 30062024.pdf27 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventory 30 06 2024.pdf27 Jan 2026
Form 1File: Form 1- 07th OCT 2024.pdf27 Jan 2026
Form 2File: From 2 30-09-2024.pdf27 Jan 2026
Form 3File: FORM 3 30092024.pdf27 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventory 30 09 2024.pdf27 Jan 2026
Form 1File: Form 1- 3rd Jan 2025.pdf27 Jan 2026
Form 2File: Form 2 31-12-2024.pdf27 Jan 2026
Form 3File: FORM 3 31122024.pdf27 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventory 31 12 2024.pdf27 Jan 2026
Form 1File: Form 1 Arch Cert (Jan to Mar 2025).pdf27 Jan 2026
Form 2File: Form 2_31-03-2025.pdf27 Jan 2026
Form 3File: FORM 3 31032025.pdf27 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventory 31 03 2025.pdf27 Jan 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf12 Sep 2022
Details of encumbrances concerned to FinanceFile: No Encumbrance Sana Enclave.pdf6 Sep 2022
Proforma of Allotment letterFile: Model of Agreement for Sale.pdf28 Aug 2022
Copy of the legal title reportFile: Index-II.pdf25 Aug 2022
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate SANAENCLAVE.pdf25 Aug 2022
Details of encumbrances concerned to LegalFile: No Encumbrance.pdf23 Aug 2022
Deviation Report with respect to Allotment letterFile: Deviation Report Allotment letter.pdf23 Aug 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Report Agreement.pdf23 Aug 2022
Building plan approvalFile: IOA PLAN.pdf12 Aug 2022
PAN CardFile: PAN CARD.pdf12 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: IOA PLAN.pdf12 Aug 2022
Commencement Certificates / NA Order for plotted developmentFile: FIRST C C.pdf12 Aug 2022
Declaration in FORM BFile: Form B.pdf11 Aug 2022
Layout approvalFile: IOD plan_compressed.pdf5 Aug 2022
Copy of the legal title reportFile: Title Certificate of Sana Enclave_compressed.pdf5 Aug 2022
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Finance.pdf5 Aug 2022
Copy of Layout Approval (in case of layout)File: IOD plan_compressed.pdf5 Aug 2022

How this compares with Mumbai Suburban

0%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 28 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SANA ENCLAVE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SANTACRUZ EAST6,700+ in Mumbai Suburban

2 kmSANA ENCLAVECompleted 53Lapsed / revoked 51Other 72Dot size: filed unitsN

Filed coordinates, straight-line distance. 176 registered projects within 2 km.

Builder: SANA ENTERPISES

SANA ENTERPISES has 1 registration on MahaRERA, including SANA ENCLAVE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SANA ENCLAVE is delayed beyond 30 Sep 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SANA ENCLAVE?

The registered promoter entity is SANA ENTERPISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SANA ENCLAVE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SANA ENCLAVE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SANA ENCLAVE?

The professionals named in the filing: Architect: CHANDRASHEKHAR; Engineer: ASSOCIATED STRUTURATANTS LLP; Engineer: Mohammed Ashfaq Shaikh; Chartered Accountant: ARUN KOLAMBEKAR; Chartered Accountant: PRASANTA KUMAR ROYBARMAN; Chartered Accountant: AAYUSHI JAIN PAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SANA ENCLAVE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SANA ENCLAVE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SANA ENCLAVE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.