Red flags

  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2022Possession promisedregistration recorded completed
55 of 55Construction stages doneacross 5 buildings; every applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 58 documents Report an error

Samruddhi Complex is a Residential / Group Housing project by SAMRUDDHI BUILDCON in Raigarh, Maharashtra, registered with MahaRERA as P52000021641 on 15 Jul 2019. The registration is recorded completed; possession was promised by 30 Dec 2022.

At a glance

Project

  • NameSamruddhi Complex
  • TypeResidential / Group Housing
  • Location
    • Raigad
    • Village -Valap
    • Valap
    • Panvel
    • Raigarh
    • 410208
  • Pincode410208
  • RERA no.P52000021641
  • ReraGenie IDRG-MH-04303

Builder

  • NameSAMRUDDHI BUILDCON
  • Entity typePartnership
  • PartnersHousabai Annappa Masal, Naval Kisan Mane, Kisan Jagannath Mane, Suresh Devram Chaudhari
  • Other registrations4 more →
  • Completed2 of 5
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredJul 2019PromisedDec 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on15 Jul 2019
  • Promised completion30 Dec 2022
  • Revised completionNone
  • Buildings5 building records
  • Documents filed58 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building Number - 1NA60000
Building Number -2NA60000
Building Number- 3NA60000
Building Number - 4NA60000
Building Number - 5NA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 13 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

55 of 55 construction stages are filed complete across 5 buildings.

Building Number - 1100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building Number -2100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building Number- 3100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building Number - 4100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building Number - 5100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 13 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed5

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots5
Closed/Covered5
BuildingClosed/CoveredTotal
Building Number - 111
Building Number -211
Building Number- 311
Building Number - 411
Building Number - 511

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,180 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI9115.42
Proposed, not sanctioned9,115 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPlot No -3A, Sector - 15,Nerul , Navi Mumbai

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVastukalp
EngineerSK Consultants & Engineers
Chartered AccountantGaurav S Rajpal & Co
PartnerRole in project
SAMRUDDHI BUILDCON-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000012808Dec 2022 → Dec 2023

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 6 in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jun 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jun 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jun 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Jul 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 10 Jun 2024

Documents filed58

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: 4 latest.pdf13 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: DOC (2).pdf5 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: F4.pdf4 Nov 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Formation.pdf1 Aug 2024
Status of ConveyanceFile: Conveyance Deed.pdf14 Jun 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: F4.pdf10 Jun 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf10 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Samruddhi Complex - 31st December 2023.pdf20 Mar 2024
Certificates of CA (Form 3)File: Form 3 - Samruddhi Complex - 31st December 2023.pdf20 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Samruddhi Complex as on Sep 2023.pdf9 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Samruddhi Complex as on Sep 2023.pdf9 Dec 2023
Certificates of CA (Form 3)File: Form 3 - Samruddhi Complex as on Sep 2023.pdf9 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Samruddhi Complex for FY 2022-23.pdf9 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Samruddhi Complex as on June 2023.pdf8 Aug 2023
Certificates of CA (Form 3)File: Form 3- Samruddhi Complex as on 30-06-2023.pdf8 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Samruddhi Complex as on December 2022.pdf10 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Samruddhi Complex as on March 2023.pdf10 May 2023
Certificates of CA (Form 3)File: Form 3- Samruddhi Complex as on December 2022.pdf10 May 2023
Certificates of CA (Form 3)File: Form 3- Samruddhi Complex as on March 2023.pdf10 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 19-20 Samruddhi.pdf14 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21 Samruddhi.pdf14 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22 Samruddhi.pdf14 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Samruddhi Complex March 2022.pdf3 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Samruddhi Complex June 2022.pdf3 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Samruddhi Complex September 2022.pdf3 Nov 2022
Certificates of CA (Form 3)File: Form 3 - Samruddhi Complex as on March 2022.pdf3 Nov 2022
Certificates of CA (Form 3)File: Form 3 - Samruddhi Complex as on June 2022.pdf3 Nov 2022
Certificates of CA (Form 3)File: Form 3 - Samruddhi Complex as on Sept 2022.pdf3 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Certificate 374.pdf3 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Samruddhi Complex.pdf26 Apr 2022
Certificates of CA (Form 3)File: Form 3 Samruddhi Buildcon 31st December 2021_compressed.pdf26 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Samruddhi Complex June 2021.pdf16 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Samruddhi Buildcon FY 19-20_compressed.pdf16 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 SamruddhiBuildcon FY 20-21_compressed.pdf16 Oct 2021
Declaration about Commencement CertificateFile: CC Declaration Samruddhi.pdf1 Oct 2021
Disclosure of sold/ booked inventoryFile: Samruddhi Buildcon 29_compressed (1).pdf1 Oct 2021
Certificates of CA (Form 3)File: Form 3 Samruddhi March.pdf1 Oct 2021
Certificates of CA (Form 3)File: FORM 3 Samruddhi June.pdf1 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: ilovepdf_merged(1).pdf10 Jul 2019
Proforma of Allotment letterFile: SAMRUDDHI AGREEMENT .pdf6 Jul 2019
Details of encumbrancesFile: Samruddhi Complex - encumbrances.pdf5 Jul 2019
Declaration in FORM BFile: Form B - Samruddhi Buildcon_compressed.pdf5 Jul 2019
Layout approvalFile: Layout approval.pdf29 Jun 2019
Building plan approvalFile: IOD 1.pdf29 Jun 2019
Building plan approvalFile: IOD 2.pdf29 Jun 2019
Building plan approvalFile: IOD 3.pdf29 Jun 2019
Building plan approvalFile: IOD 4.pdf29 Jun 2019
Building plan approvalFile: IOD 5.pdf29 Jun 2019
Building plan approvalFile: IOD 6.pdf29 Jun 2019
Copy of the legal title reportFile: search report and title certificate.pdf29 Jun 2019
Copy of Layout Approval (in case of layout)File: Layout approval.pdf29 Jun 2019
Building Plan Approval (IOD)File: IOD 1.pdf29 Jun 2019
Building Plan Approval (IOD)File: IOD 2.pdf29 Jun 2019
Building Plan Approval (IOD)File: IOD 3.pdf29 Jun 2019
Building Plan Approval (IOD)File: IOD 4.pdf29 Jun 2019
Building Plan Approval (IOD)File: IOD 5.pdf29 Jun 2019
Building Plan Approval (IOD)File: IOD 6.pdf29 Jun 2019
Certificates of CA (Form 3)File: FORM 3.pdf29 Jun 2019

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Samruddhi Complex on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Village -Valap5,900+ in Raigarh

Builder: SAMRUDDHI BUILDCON

SAMRUDDHI BUILDCON has 5 registrations on MahaRERA, including SPARSH HEIGHTS and Samruddhi Complex. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Samruddhi Complex is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Samruddhi Complex?

The registered promoter entity is SAMRUDDHI BUILDCON, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Samruddhi Complex?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Samruddhi Complex?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Samruddhi Complex?

The professionals named in the filing: Architect: Vastukalp; Engineer: SK Consultants & Engineers; Chartered Accountant: Gaurav S Rajpal & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Samruddhi Complex?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Samruddhi Complex. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Samruddhi Complex to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.