SAMRAJYA

By GARVE PATIL CONSTRUCTION COMPANY

RG-MH-25998 · RERA P52100014056 · Last updated on MahaRERA portal: 6 Jul 2023

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 42 months
  • 3 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2023Possession promisedregistration recorded completed
19 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 80%
1Complaints at MahaRERAon this registration
Jump to the 37 documents Report an error

SAMRAJYA is a Residential / Group Housing project by GARVE PATIL CONSTRUCTION COMPANY in Pune, Maharashtra, registered with MahaRERA as P52100014056 on 7 Nov 2017. The registration is recorded completed; possession was promised by 30 Jun 2023. The completion date has moved by 42 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSAMRAJYA
  • TypeResidential / Group Housing
  • Location
    • Pimpale Gurav
    • Haveli
    • Pune
    • 411061
  • Pincode411061
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100014056
  • ReraGenie IDRG-MH-25998

Builder

  • NameGARVE PATIL CONSTRUCTION COMPANY
  • Entity typePartnership
  • PartnerTushar Narayan Patil
  • Other registrations2 more →
  • Completed1 of 3

Key dates

this monthRegisteredNov 2017First promiseDec 2019Revised toJun 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on7 Nov 2017
  • Promised completion30 Jun 2023
  • Revised completionRevised to 30 Jun 2023 (originally 31 Dec 2019)
  • Buildings3 building records
  • Documents filed37 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
D WINGNA100000
E WINGNA80000
F WINGNA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 6 Jul 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

19 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 80%.

D WING35%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
E WING73%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
F WING73%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 6 Jul 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes60%
Water SupplyYes60%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes60%
Storm Water DrainsYes60%
Landscaping & Tree PlantingYes40%
Street LightingYes30%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes60%
Energy managemcntYes60%
Fire protection and fire safety requirementsYes60%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes40%
Open ParkingYes40%

Parking filed44

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots44
Closed/Covered44
BuildingClosed/CoveredTotal
D WING2222
E WING88
F WING1414

Land and ownership7

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,629 sq m
Land owned byThe promoter, with other names on the file
Named landowners7
LandownerVillageDistrict
Nilesh Dnyaneshwar GangardePimpale GuravPune
Sagar Dnyanoba GangardePimpale GuravPune
Alkabai Vasant GangardePimpale GuravPune
Dattaray Vasant GangardePimpale GuravPune
Sudhakar Kisan GangardePimpale GuravPune
Madhukar Kisan GangardePimpale GuravPune
Mayur Uttam GangardePimpale GuravPune

Approvals and building plan

Permissible FSI12870.91
Proposed, not sanctioned8,097 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC Bank Survey No 56 of 1 Kawade Nagar New Sangvi Pune 411027

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
GARVE PATIL CONSTRUCTION COMPANY-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100005318Dec 2019 → Dec 2020

Reason as filed by the promoterProject is almost completed. Out of 3 buildings 2 are already completed and remaining one is almost on completion at 70% which will be completed in due time. Hence we request you to allow the project to be extended as soon as possible.

EXT52100009717Dec 2019 → Jun 2022

Reason as filed by the promoterTo Maharashtra Real Estate Regulatory Authority, 6th & 7th Floor, Housefin Bhavan, Plot No. C - 21, E - Block, Bandra Kurla Complex, Bandra (E), Mumbai 400051. Subject:- Extension of Project named “Samrajya”. Hello Sir/Madam, This is to inform, that the project of M/s Shri Gangarde Associates named “Samrajya” having registration number P52100014056 is an on-going project & estimated its completion date was i.e 31/12/2019 at the time of registration. That the said project was extended vide extension certificate upto 30/06/2021. That the project has been completed upto 67% in all respect as on t

EXT52100013367Dec 2019 → Jun 2023

Reason as filed by the promoterTo Maharashtra Real Estate Regulatory Authority, 6th & 7th Floor, Housefin Bhavan, Plot No. C - 21, E - Block, Bandra Kurla Complex, Bandra (E), Mumbai 400051 Subject:- Extension of Project named “Samrajya”. Hello Sir/Madam, This is to inform, that the project of M/s Garve Patil Construction Company named “Samrajya” having registration number P52100014056 is an on-going project & estimated its completion date i.e 31/12/2019 at the time of registration. That the said project was extended vide extension certificate upto 30/12/2020. That further the said project was extended vide extension certif

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000064442PRAFULLACHANDRA KHADEShri Gangarde Associates20/10/2020

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Sep 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Sep 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Sep 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Sep 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 4 Jul 2023

Documents filed37

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 E and F Wing Samrajya.pdf6 Jul 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Wing D Samrajya.pdf6 Jul 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion D wing Samrajya.pdf4 Jul 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 D Wing Samrajya.pdf4 Jul 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 E and F Wing Samrajya.pdf4 Jul 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Certificate E Wing.pdf4 Jul 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Certificate F Wing.pdf4 Jul 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Samrajya Completion E and F.pdf16 Dec 2022
CERSAI detailsFile: Samrajya CERSAI Report.pdf21 Apr 2022
Disclosure of sold/ booked inventoryFile: Samrajya Sold Unsold Inventory.pdf21 Apr 2022
Proforma of Allotment letterFile: Agreement to Sale Draft Samrajya.pdf29 Oct 2021
Proforma of Allotment letterFile: Allotment Letter.pdf29 Oct 2021
Declaration about Commencement CertificateFile: DECLARATION COMMENCEMENT CERTIFICATE_20210817201621_compressed.pdf17 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Gangarde Quality Assurance Cer 19-20_compressed.pdf17 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Gangarde Quality Assurance Cer 20-21_compressed.pdf17 Aug 2021
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf17 Aug 2021
Certificates of CA (Form 3)File: Gangarde Samrajya From 3 - March 2021_compressed.pdf17 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 FY 2019 -2020.pdf17 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY 2020-2021.pdf17 Aug 2021
Details of encumbrancesFile: Index II - IOM - Shri Gangarde - 1.pdf1 Jun 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: FORM 5 - Shri Gangarde Associates.pdf28 Feb 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM-5_GANGARDE_ASSOCIATES-18-19.pdf31 Dec 2019
Certificates of CA (Form 3)File: FORM 3 - CA Certificate compressed.pdf7 Oct 2017
Details of encumbrancesFile: ENCUMBRANCE.pdf29 Sep 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf29 Sep 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf29 Sep 2017
Declaration in FORM BFile: FORM B.pdf28 Sep 2017
Proforma of Allotment letterFile: AGREEMENT.pdf28 Sep 2017
Proforma of Allotment letterFile: ALLOTTMENT.pdf28 Sep 2017
Building plan approvalFile: BUILDING PLAN.pdf26 Sep 2017
Layout approvalFile: LAYOUT PLAN.pdf26 Sep 2017
PAN CardFile: PAN OF FIRM.pdf26 Sep 2017
Copy of the legal title reportFile: SEARCH TITLE.pdf26 Sep 2017
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN.pdf26 Sep 2017
Building Plan Approval (IOD)File: BUILDING PLAN.pdf26 Sep 2017
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT.pdf26 Sep 2017
OtherFile: NA ORDER.pdf26 Sep 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 42 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAMRAJYA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pimpale Gurav13,700+ in Pune

Builder: GARVE PATIL CONSTRUCTION COMPANY

GARVE PATIL CONSTRUCTION COMPANY has 3 registrations on MahaRERA, including SAMRAJYA and Samrajya C Wing. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SAMRAJYA is delayed beyond 30 Jun 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAMRAJYA?

The registered promoter entity is GARVE PATIL CONSTRUCTION COMPANY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAMRAJYA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SAMRAJYA?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SAMRAJYA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in SAMRAJYA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAMRAJYA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAMRAJYA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.