Samrajya Wing GH

By Garve Patil Construction Company

RG-MH-23502 · RERA P52100078814 · Last updated on MahaRERA portal: 14 Apr 2026

Source: official MahaRERA filing

Red flags

  • Rs 45.00 crore secured on the land, in favour of Aditya Birla Capital Limited
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Basement (if any), 50%
205 of 294Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

Samrajya Wing GH is a Residential / Group Housing project by Garve Patil Construction Company in Pune, Maharashtra, registered with MahaRERA as P52100078814 on 13 Jan 2025. Possession is promised by 31 Dec 2029. 89 of the 294 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameSamrajya Wing GH
  • TypeResidential / Group Housing
  • Location
    • Kate Puram
    • Pimple Gurav
    • Pimpale Gurav
    • Haveli
    • Pune
    • 411061
  • Pincode411061
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100078814
  • ReraGenie IDRG-MH-23502

Builder

  • NameGarve Patil Construction Company
  • Entity typePartnership
  • PartnersVinayak Kishor Garve, Tushar Narayan Patil
  • Other registrations2 more →
  • Completed1 of 3

Key dates

this monthRegisteredJan 2025PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on13 Jan 2025
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed67 files

Current status

30%89 of 294 units booked
18.6%Work done, per cost certificate

Figures as on 14 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing GHNA24212931294

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 50%.

Wing GH: 17% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)50%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure4%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks22%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.8%

Progress on shared amenities15

As on 14 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed552

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots552
Closed/Covered552

Land and ownership23

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area21,787 sq m
Land owned byNot the promoter
Named landowners23
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Capital Limited
Secured amountRs 45.00 crore
CERSAI search filedYes
Declared on26 Feb 2026
LandownerVillageDistrict
Neha Nilesh GangardePimpale GuravPune
Varsha Sagar GangardePimpale GuravPune
Leelabai Dnyanoba GangardePimpale GuravPune
Vishal Sudhakar GangardePimpale GuravPune
Pradip Sudhakar GangardePimpale GuravPune
Sunita Sudhakar GangardePimpale GuravPune
Sheetal Dattatray GangardePimpale GuravPune
Kirti Bapu GangardePimpale GuravPune
Namrata Mayur GangardePimpale GuravPune
Rupesh Madhukar GangardePimpale GuravPune
Mohini Shrikrushna JadhavPimpale GuravPune
Vandana Madhukar GangardePimpale GuravPune
Bapu Vasant GangardePimpale GuravPune
Alkabai Vasant GangardePimpale GuravPune
Nilesh Dnyanoba GangardePimpale GuravPune
Sagar Dnyanoba GangardePimpale GuravPune
Dnaynoba Dhondiba GangardePimpale GuravPune
Sarika Dhanaji JadhavPimpale GuravPune
Mayur Uttam GangardePimpale GuravPune
Smt Anita Uttam GangardePimpale GuravPune
Madhukar Kisan GangardePimpale GuravPune
Sudhakar Kisan GangardePimpale GuravPune
Dattaray Vasant GangardePimpale GuravPune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI28774.68
Proposed, not sanctioned28,775 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC BANK LTD., S.NO 56/1, KAWADENAGAR, NEW SANGAVI, PUNE - 411027
Estimated costRs 95.16 cr
Cost incurredRs 17.65 cr
Work done18.55%
BuildingWingEstimatedIncurred
Wing GHNARs 93.16 crRs 17.65 cr
-NARs 2.00 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGem Associates
EngineerPrathamesh Sugate
EngineerVenkangouda V Jadiyappagoudar
EngineerVKG ASSOCIATES
Chartered AccountantChaudhari Agarwal & Associates
Chartered AccountantJSG & CO
PartnerRole in project
Garve Patil Construction Company-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Nov 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Apr 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Building plan approvalFile: Building Plan 1st Floor_compressed.pdf14 Apr 2026
Building plan approvalFile: Samrajya Wing GH First Second Plan.pdf14 Apr 2026
Building plan approvalFile: Samrajya Wing GH Elevation Plan.pdf14 Apr 2026
Building plan approvalFile: Samrajya Wing GH Parking Plan.pdf14 Apr 2026
Building plan approvalFile: Samrajya Wing GH Refuge Floor Plan.pdf14 Apr 2026
Building plan approvalFile: Samrajya Wing GH Section A Floor Plan.pdf14 Apr 2026
Building plan approvalFile: Samrajya Wing GH Section B Floor Plan.pdf14 Apr 2026
Building plan approvalFile: Samrajya Wing GH Terrace Floor Plan.pdf14 Apr 2026
Building plan approvalFile: Samrajya Wing GH Typical Floor Plan.pdf14 Apr 2026
Layout approvalFile: Layout upload.pdf14 Apr 2026
Form 5 (FY 2024-2025)File: Samrajya FORM 5 GH Wing .pdf11 Apr 2026
Form 2A (FY 2024-2025)File: Samrajya Wing GH Form 2A 24-25.pdf10 Apr 2026
Form 2A (FY 2025-2026)File: Samrajya Wing GH Form 2A 25-26.pdf10 Apr 2026
Withdrawal Update Form 1File: FORM 1 SAMRAJYA GH June 25.pdf9 Mar 2026
Withdrawal Update Form 1File: FORM 1 SAMRAJYA GH Sept 25.pdf9 Mar 2026
Withdrawal Update Form 1File: FORM 1 SAMRAJYA GH Dec 25.pdf9 Mar 2026
Withdrawal Update Form 2File: FORM 2 Samrajya GH June 25.pdf9 Mar 2026
Withdrawal Update Form 2File: FORM 2 Samrajya GH Sept 25.pdf9 Mar 2026
Withdrawal Update Form 2File: FORM 2 Samrajya GH Dec 25.pdf9 Mar 2026
Withdrawal Update Form 3File: FORM 3 SAMRAJYA WING GH June 25.pdf9 Mar 2026
Withdrawal Update Form 3File: FORM 3 SAMRAJYA GH Sept 25.pdf9 Mar 2026
Withdrawal Update Form 3File: FORM 3 SAMRAJYA GH Dec 25.pdf9 Mar 2026
Form 1File: Form 1 Samrajya Wing GH Mar 25.pdf17 Feb 2026
Form 2File: Form 2 Samrajya Wing GH Mar 25.pdf17 Feb 2026
Form 3File: Form 3 Samrajya Wing GH Mar 25.pdf17 Feb 2026
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY SAMRAJYA WING GH Mar.pdf17 Feb 2026
Samrajya Wing GH Form 1 Mar 2529 Apr 2025
Samrajya Wing GH Form 2 Mar 2529 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Samrajya Wing GH Mar 25.pdf28 Apr 2025
Proforma of Agreement for saleFile: Agreement to Sale Draft Samrajya.pdf5 Feb 2025
Proforma of Agreement for saleFile: Agreement to Sale Draft Samrajya.pdf5 Feb 2025
Details of encumbrances concerned to FinanceFile: Encumbrances Declaration Finance.pdf2 Dec 2024
Other - LegalFile: Tenament Declaration.pdf2 Dec 2024
CERSAI detailsFile: CERSAI Declaration.pdf2 Dec 2024
Details of encumbrances concerned to LegalFile: Encumbrances Declaration Finance.pdf2 Dec 2024
Other - FinanceFile: Declaration Cum Undertaking for No Sale.PDF2 Dec 2024
Proforma of Agreement for saleFile: Agreement to Sale RERA Format.pdf2 Dec 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Sheet AFS New.pdf21 Nov 2024
Other - TechnicalFile: Layout GH Edited.pdf17 Nov 2024
Other - TechnicalFile: Layout GH Edited.pdf17 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Samrajya Wing GH.pdf16 Nov 2024
Copy of the legal title reportFile: Legal Title Report Samrajya Wing GH.pdf7 Nov 2024
Other - TechnicalFile: Plot Area Declaration.pdf31 Oct 2024
Building plan approvalFile: 7 12 17 21 Floor Plan.pdf30 Oct 2024
Layout approvalFile: Layout Edited.pdf30 Oct 2024
Copy of Layout Approval (in case of layout)File: Layout Edited.pdf30 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 7 12 17 21 Floor Plan.pdf30 Oct 2024
Other - TechnicalFile: One Project Declaration.PDF30 Oct 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Bank Nomenclature Declaration.pdf29 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Samrajya Wing GH.PDF21 Oct 2024
Proforma of Allotment letterFile: Allotment Letter Format RERA.PDF16 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Designated Bank Accout Declaration.PDF16 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Wing GH.pdf14 Oct 2024
Building plan approvalFile: 2 to 20 Floor Plan.pdf11 Oct 2024
Building plan approvalFile: 1 Floor Plan.pdf11 Oct 2024
PAN CardFile: PAN Card.pdf11 Oct 2024
Details of encumbrances concerned to FinanceFile: Encumbrances Declaration Legal.pdf11 Oct 2024
Declaration in FORM BFile: Form B by Promoter.pdf11 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf11 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 1 Floor Plan.pdf11 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 2 to 20 Floor Plan.pdf11 Oct 2024
Declaration about Commencement CertificateFile: Declaration Commencement Certificate.pdf11 Oct 2024
Deviation Report with respect to Allotment letterFile: Declaration Allotment Letter Deviation.pdf11 Oct 2024
Details of encumbrances concerned to LegalFile: Encumbrances Declaration Legal.pdf11 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Other RERA Vinayak Garve.pdf11 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Other RERA Tushar Patil.pdf11 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: Project Finance Details.PDF11 Oct 2024

How this compares with Pune

30%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Samrajya Wing GH on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pimple Gurav13,700+ in Pune

2 kmSamrajya Wing GHCompleted 41Lapsed / revoked 23Other 45Dot size: filed unitsN

Filed coordinates, straight-line distance. 109 registered projects within 2 km.

Builder: Garve Patil Construction Company

GARVE PATIL CONSTRUCTION COMPANY has 3 registrations on MahaRERA, including SAMRAJYA and Samrajya C Wing. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Samrajya Wing GH is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Samrajya Wing GH?

The registered promoter entity is Garve Patil Construction Company, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Samrajya Wing GH?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Samrajya Wing GH?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Samrajya Wing GH?

The professionals named in the filing: Architect: Gem Associates; Engineer: Prathamesh Sugate; Engineer: Venkangouda V Jadiyappagoudar; Engineer: VKG ASSOCIATES; Chartered Accountant: Chaudhari Agarwal & Associates; Chartered Accountant: JSG & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Samrajya Wing GH?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Samrajya Wing GH. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Samrajya Wing GH to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.