ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Samarth Leela Heights Phase I

Registered No litigation declared Residential / Group Housing project

Samarth Leela Heights Phase I

By Shri Balaji Group

RG-MH-25068 · RERA P52100012529 · Last updated on MahaRERA portal: 17 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 106 months
  • 5 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Oct 2028Possession promisedmoved 106 months from the original
6 of 11Construction stages donefurthest along: Internal walls, 95%
44 of 84Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

Samarth Leela Heights Phase I is a Residential / Group Housing project by Shri Balaji Group in Pune, Maharashtra, registered with MahaRERA as P52100012529 on 1 Sep 2017. Possession is promised by 30 Oct 2028. The completion date has moved by 106 months from the original filing. 40 of the 84 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameSamarth Leela Heights Phase I
  • TypeResidential / Group Housing
  • Location
    • PUNE
    • Sudumbare
    • Mawal
    • 412109
  • Pincode412109
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100012529
  • ReraGenie IDRG-MH-25068

Builder

  • NameShri Balaji Group
  • Entity typePartnership
  • PartnersShivling Vasant Jare, Laxman Rao Boiri, Nilkanth Jagannath Sonje

Key dates

this monthRegisteredSep 2017First promiseDec 2019Revised toOct 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Sep 2017
  • Promised completion30 Oct 2028
  • Revised completionRevised to 30 Oct 2028 (originally 31 Dec 2019)
  • Buildings1 building record
  • Documents filed87 files

Current status

48%40 of 84 units booked
77.1%Work done, per cost certificate

Figures as on 17 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WingNA9784084

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

A Wing: 76% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 17 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed166

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots166
Closed/Covered165
Open Space1

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,400 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on5 Dec 2025
LandownerVillageDistrict
Sudhir Ananda GadeSudumbarePune
Rohidas Tukaram GadeDEHUPune

Approvals and building plan

Sanctioning authorityPCNDTA
Permissible FSI6461.43
Proposed, not sanctioned4,121 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchUttam Complex, G-Block, Plot No GP 75, MIDC, Thermax Chowk
Estimated costRs 11.22 cr
Cost incurredRs 8.65 cr
Work done77.11%
BuildingWingEstimatedIncurred
A WingNARs 11.22 crRs 8.65 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAjit Thakur & Associates Mr. Ajit Thakur
EngineerRahul Darvekar & Associates Mr. Rahul Darvekar
EngineerDhmmavardhan Panchamdas Shakya
EngineerAshish Deshpande
Chartered Accountantritvik vatsyayan
Chartered AccountantCA Prajakta Wable
Chartered AccountantPravin Pise
PartnerRole in project
Shri Balaji Group-

Extensions applied for5

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100003635Dec 2019 → Dec 2020

Reason as filed by the promoterDue to slag Of Booking and natural calamities it has been delayed.

EXT52100010909Dec 2019 → Aug 2022

Reason as filed by the promoterDUE TO SCARCITY OF MATERIAL AND COVID REALTED ISSUES PROJECT COULD NOT BE COMPLETED WITHIN TIME HENCE A SMALL EXTENSION IS REQUIRED. RESOLUTION IS ATTATCHED HEREWITH FOR REFERENCE.

EXT52100012696Dec 2019 → Dec 2025

Reason as filed by the promoterDue to the covid pandemics situation and out side is closed for sales now we made some development and re started sales of out balance flat for that purpose we needed rera updated certificate for sales of flat for that suppose we request you to grant us extension

EA06072621677Dec 2019 → Jun 2028

Reason as filed by the promoterThe project completion has been delayed due to circumstances beyond the control of the promoter. The project was adversely affected by delays in statutory approvals, disruption in availability of labor and construction materials, and interruptions caused by external factors. In addition, unforeseen administrative and operational challenges impacted the planned construction schedule. Despite these difficulties, the promoter has continued construction activities and remains fully committed to completing the project at the earliest. The extension is sought to ensure timely completion with require

P52100012529/WarDec 2019 → Oct 2028

Reason as filed by the promoterNA

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Aug 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Aug 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Aug 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Oct 2028

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Mar 26.pdf17 Sep 2026
Withdrawal Update Form 1File: Form 1 Mar 26.pdf17 Sep 2026
Withdrawal Update Form 1File: Form 1_June 26.pdf17 Sep 2026
Withdrawal Update Form 2File: Form 2 Mar 26.pdf17 Sep 2026
Withdrawal Update Form 2File: Form 2 Mar 26.pdf17 Sep 2026
Withdrawal Update Form 2File: Form 2_June 26_compressed.pdf17 Sep 2026
Withdrawal Update Form 3File: Form 3 Updated Q_3_24_25_new_compressed.pdf17 Sep 2026
Withdrawal Update Form 3File: Form 3 Updated Q_3_24_25_new_compressed.pdf17 Sep 2026
Withdrawal Update Form 3File: Form 3_SAMARTH LEELA HEIGHTS_June.pdf17 Sep 2026
Form 2A (FY 2025-2026)3 Jul 2026
Form 2A (FY 2025-2026)File: Quality Assurance Certificate FY 2025-26.pdf3 Jul 2026
Withdrawal Update Form 1File: F1 Dec.pdf1 Jul 2026
Withdrawal Update Form 1File: F1 Dec.pdf1 Jul 2026
Withdrawal Update Form 1File: F1 Dec.pdf1 Jul 2026
Withdrawal Update Form 2File: F2 Dec.pdf1 Jul 2026
Withdrawal Update Form 2File: F2 Dec.pdf1 Jul 2026
Withdrawal Update Form 2File: F2 Dec.pdf1 Jul 2026
Withdrawal Update Form 3File: Form3 Dec- Samarth Leela.pdf1 Jul 2026
Withdrawal Update Form 3File: Form3 Dec- Samarth Leela.pdf1 Jul 2026
Withdrawal Update Form 3File: Form3 Dec- Samarth Leela.pdf1 Jul 2026
Withdrawal Update Form 1File: F1 Dec.pdf30 Jun 2026
Withdrawal Update Form 1File: F1 Dec.pdf30 Jun 2026
Withdrawal Update Form 2File: F2 Dec.pdf30 Jun 2026
Withdrawal Update Form 2File: F2 Dec.pdf30 Jun 2026
Withdrawal Update Form 3File: Form3 Dec- Samarth Leela.pdf30 Jun 2026
Withdrawal Update Form 3File: Form3 Dec- Samarth Leela.pdf30 Jun 2026
Withdrawal Update Form 1File: Form 1 ARCHITECT_Sign.pdf26 May 2026
Withdrawal Update Form 2File: Form 2 Engg Certificate Sign.pdf26 May 2026
Withdrawal Update Form 3File: Form3 balaji Group 23.pdf26 May 2026
Withdrawal Update Form 1File: Form 1 ARCHITECT_Sign.pdf22 May 2026
Withdrawal Update Form 1File: Form 1 ARCHITECT_Sign.pdf22 May 2026
Withdrawal Update Form 2File: Form 2 Engg Certificate Sign.pdf22 May 2026
Withdrawal Update Form 2File: Form 2 Engg Certificate Sign.pdf22 May 2026
Withdrawal Update Form 3File: Form3 Withdrawal Sign Copy.pdf22 May 2026
Withdrawal Update Form 3File: Form3 Withdrawal Sign Copy.pdf22 May 2026
Form 2A (FY 2017-2018)File: 2018.pdf2 Feb 2026
Form 2A (FY 2018-2019)File: 2019.pdf2 Feb 2026
Form 2A (FY 2019-2020)File: 2020.pdf2 Feb 2026
Form 2A (FY 2020-2021)File: 2021.pdf2 Feb 2026
Form 2A (FY 2021-2022)File: 2022.pdf2 Feb 2026
Form 2A (FY 2022-2023)File: 2023.pdf2 Feb 2026
Form 2A (FY 2023-2024)File: 2024.pdf2 Feb 2026
Form 5 (FY 2024-2025)File: Form 5 Sign 2024-25.pdf31 Jan 2026
Form 5 (FY 2020-2021)File: Form 5 Sign 2020-21.pdf31 Jan 2026
Form 5 (FY 2021-2022)File: Form 5 Sign 2021-22.pdf31 Jan 2026
Form 5 (FY 2022-2023)File: Form 5 Sign 2022-23.pdf31 Jan 2026
Form 5 (FY 2023-2024)File: Form 5 Sign 2023-24.pdf31 Jan 2026
Form 5 (FY 2018-2019)File: Form 5 Sign 2018-19.pdf29 Jan 2026
Form 5 (FY 2019-2020)File: Form 5 Sign 2019-20.pdf29 Jan 2026
Form 5 (FY 2017-2018)File: Form 5 Sign 2017-18.pdf28 Jan 2026
Form 2A (FY 2024-2025)File: Form 2A 20 Oct 2025 Sign.pdf21 Nov 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2022-23.pdf27 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2021-22.pdf27 Feb 2024
Certificates of CA (Form 3)File: Form 3 Rera Balaji Group.pdf29 Jan 2024
Disclosure of sold/ booked inventoryFile: Book Sold statement.pdf15 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2021.pdf10 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2021.pdf10 Oct 2022
CERSAI detailsFile: Annual Report 2021-22.pdf10 Oct 2022
CERSAI detailsFile: CERSAI_Search_Report_200249153717_For_Asset_Based_Search_10_10_2022_09_36_50_896.pdf10 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Annual Report 2020-21.pdf10 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Annual Report from fy 20-21.pdf10 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: ANNUAL REPORT fy 21-22.pdf10 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2020.pdf5 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2021.pdf5 Oct 2022
Disclosure of sold/ booked inventoryFile: Certificate Sold unsold_compressed.pdf8 Nov 2021
Declaration about Commencement CertificateFile: Declaration about cc_compressed.pdf7 Sep 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate.pdf7 Sep 2021
Disclosure of sold/ booked inventoryFile: Declaration about cc_compressed.pdf7 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 17-18.pdf7 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 18-19.pdf7 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: fORM 5 19-20.pdf7 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf12 Aug 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf12 Aug 2017
Certificates of CA (Form 3)File: CA Certificate-compressed.pdf12 Aug 2017
Layout approvalFile: Blue Print 1.pdf9 Aug 2017
Building plan approvalFile: Blue Print 2.pdf9 Aug 2017
Building plan approvalFile: Blue Print 3.pdf9 Aug 2017
PAN CardFile: PAN Card.pdf9 Aug 2017
Copy of the legal title reportFile: 1-compressed.pdf9 Aug 2017
Copy of the legal title reportFile: 2.pdf9 Aug 2017

How this compares with Pune

48%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 106 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Samarth Leela Heights Phase I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PUNE13,700+ in Pune

Builder: Shri Balaji Group

Shri Balaji Group has 1 registration on MahaRERA, including Samarth Leela Heights Phase I. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Samarth Leela Heights Phase I is delayed beyond 30 Oct 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Samarth Leela Heights Phase I?

The registered promoter entity is Shri Balaji Group, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Samarth Leela Heights Phase I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Samarth Leela Heights Phase I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Samarth Leela Heights Phase I?

The professionals named in the filing: Architect: Ajit Thakur & Associates Mr. Ajit Thakur; Engineer: Rahul Darvekar & Associates Mr. Rahul Darvekar; Engineer: Dhmmavardhan Panchamdas Shakya; Engineer: Ashish Deshpande; Chartered Accountant: ritvik vatsyayan; Chartered Accountant: CA Prajakta Wable. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Samarth Leela Heights Phase I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Samarth Leela Heights Phase I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Samarth Leela Heights Phase I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.