ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Rivereast Residency

Registered No litigation declared Others project

Rivereast Residency

By KRUSHNA PARADISE DEVELOPERS

RG-MH-31570 · RERA P52100079905 · Last updated on MahaRERA portal: 24 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2029Possession promisedno revision filed
30 of 81Construction stages doneacross 10 buildings; furthest along: Staircases, 80%
171 of 177Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 65 documents Report an error

Rivereast Residency is a Others project by KRUSHNA PARADISE DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100079905 on 29 Mar 2025. Possession is promised by 1 Mar 2029. 6 of the 177 units on this registration are recorded sold or booked, and 30 of 81 construction stages are filed complete.

At a glance

Project

  • NameRivereast Residency
  • TypeOthers
  • Location
    • dehu
    • Haveli
    • Pune
    • 412109
  • Pincode412109
  • RERA no.P52100079905
  • ReraGenie IDRG-MH-31570

Builder

  • NameKRUSHNA PARADISE DEVELOPERS
  • Entity typePartnership
  • PartnersKANTILAL VISHWANATH KALOKHE, AJINKYA KANTILAL KALOKHE, DATTATRAY SADASHIV ZENDE, SUPRIYA TUSHAR ZENDE, TUSHAR DATTATRAY ZENDE

Key dates

this monthRegisteredMar 2025PromisedMar 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Mar 2025
  • Promised completion1 Mar 2029
  • Revised completionNone
  • Buildings10 building records
  • Documents filed65 files

Current status

3%6 of 177 units booked
7.0%Work done, per cost certificate

Figures as on 24 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RH 08 GROUP OF 9NA3210010
BUILDING ENA141291091
RH 01 GROUP OF 8NA32707
RH 02 GROUP OF 14NA3214014
RH 03 GROUP OF 14NA3214014
RH 04 GROUP OF 13NA3213013
RH 05 GROUP OF 12NA3212012
RH 06 GROUP OF 10NA32909
RH 07 GROUP OF 6NA32606
I BUILDINGNA11011

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building10

As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

30 of 81 construction stages are filed complete across 10 buildings. The stage furthest along is Staircases, at 80%.

RH 08 GROUP OF 966%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
BUILDING E59%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
RH 01 GROUP OF 866%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
RH 02 GROUP OF 1466%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
RH 03 GROUP OF 1466%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
RH 04 GROUP OF 1366%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
RH 05 GROUP OF 1266%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
RH 06 GROUP OF 1066%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
RH 07 GROUP OF 666%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
I BUILDING66%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed328

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots328
Closed/Covered257
Open Space71
BuildingClosed/CoveredOpen SpaceTotal
RH 08 GROUP OF 920020
BUILDING E8771158
RH 01 GROUP OF 814014
RH 02 GROUP OF 1428028
RH 03 GROUP OF 1428028
RH 04 GROUP OF 1326026
RH 05 GROUP OF 1224024
RH 06 GROUP OF 1018018
RH 07 GROUP OF 612012

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area12,000 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on5 Jun 2025

Approvals and building plan

Sanctioning authorityDehu Nagarpanchayat
Permissible FSI11118.33
Proposed, not sanctioned11,118 sq m
Buildings approved10
Buildings sanctioned10

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT NO 1, SECTOR 27APRADHIKARANNIGDIPUNEMAHARASHTRA411044
Estimated costRs 32.00 cr
Cost incurredRs 2.23 cr
Work done6.97%
BuildingWingEstimatedIncurred
BUILDING ENARs 11.27 crRs 78.62 lakh
-NARs 3.20 crRs 22.32 lakh
RH 02 GROUP OF 14NARs 2.88 crRs 20.08 lakh
RH 03 GROUP OF 14NARs 2.88 crRs 20.08 lakh
RH 04 GROUP OF 13NARs 2.67 crRs 18.64 lakh
RH 05 GROUP OF 12NARs 2.47 crRs 17.21 lakh
RH 08 GROUP OF 9NARs 2.06 crRs 14.35 lakh
RH 06 GROUP OF 10NARs 1.85 crRs 12.91 lakh
RH 01 GROUP OF 8NARs 1.44 crRs 10.04 lakh
RH 07 GROUP OF 6NARs 1.23 crRs 8.61 lakh
I BUILDINGNARs 4.19 lakhRs 29,208

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectLaxmi associates and consultants
Engineershriraj shinde
EngineerPravin maruti dhotre
Chartered AccountantNavdeep Jindal
Chartered AccountantCA Dolly Gandhi
PartnerRole in project
KRUSHNA PARADISE DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Mar 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Sep 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Sep 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 1 Mar 2029

Documents filed65

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form-1.pdf24 Apr 2026
Withdrawal Update Form 1File: Form-1 Mar_26.pdf24 Apr 2026
Withdrawal Update Form 2File: Form-2 Dec_25.pdf24 Apr 2026
Withdrawal Update Form 2File: Form-2 Mar_26.pdf24 Apr 2026
Withdrawal Update Form 3File: Form-3 Dec_25.pdf24 Apr 2026
Withdrawal Update Form 3File: Form-3 Mar_26.pdf24 Apr 2026
Withdrawal Update Form 1File: Form-1.pdf17 Oct 2025
Withdrawal Update Form 2File: Form-2.pdf17 Oct 2025
Withdrawal Update Form 3File: Form 3 - Krushna Paradise Developers Sep 25 Sign_.pdf17 Oct 2025
Form 5 (FY 2024-2025)File: Form 5_page-0001.pdf9 Oct 2025
Layout approvalFile: Signed Plan_compressed.pdf19 Sep 2025
Building plan approvalFile: Signed Plan_compressed.pdf19 Sep 2025
Withdrawal Update Form 1File: Form1_.pdf19 Aug 2025
Withdrawal Update Form 2File: form 2.pdf19 Aug 2025
Withdrawal Update Form 3File: form 3 signed_compressed (3).pdf19 Aug 2025
Withdrawal Update Form 1File: Form1_.pdf20 Jul 2025
Withdrawal Update Form 2File: 11 Form2.pdf20 Jul 2025
Withdrawal Update Form 3File: Form 3 signed.pdf20 Jul 2025
Form 1File: Form1.pdf21 Jun 2025
Form 2File: Form2.pdf21 Jun 2025
Form 3File: Krushna Paradise Developers Form-3_11zon.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold-Booked Inventory.pdf21 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 NEW_ Final.pdf28 Mar 2025
Layout approvalFile: 1 Layout_compressed.pdf27 Mar 2025
Layout approvalFile: 1A_compressed.pdf27 Mar 2025
Layout approvalFile: 1B_compressed.pdf27 Mar 2025
Layout approvalFile: CC Mail.pdf27 Mar 2025
Layout approvalFile: Sanction plan PDF_compressed.pdf27 Mar 2025
Copy of Layout Approval (in case of layout)File: 1 Layout_compressed.pdf27 Mar 2025
Copy of Layout Approval (in case of layout)File: 1A_compressed.pdf27 Mar 2025
Copy of Layout Approval (in case of layout)File: 1B_compressed.pdf27 Mar 2025
Copy of Layout Approval (in case of layout)File: CC Mail.pdf27 Mar 2025
Copy of Layout Approval (in case of layout)File: Sanction plan PDF_compressed.pdf27 Mar 2025
Other - LegalFile: Kharedikhat 1.pdf27 Mar 2025
Other - LegalFile: Kharedikhat 2.pdf27 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: CC_merged.pdf25 Mar 2025
Building plan approvalFile: 1B 1C_11zon.pdf20 Mar 2025
Building plan approvalFile: 2 3_11zon.pdf20 Mar 2025
Building plan approvalFile: 4 5_11zon.pdf20 Mar 2025
Copy of the legal title reportFile: 2 Search title Report_11zon (1)_compressed.pdf20 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 4 5_11zon.pdf20 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 1B 1C_11zon.pdf20 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 2 3_11zon.pdf20 Mar 2025
Other - LegalFile: Addendum _compressed.pdf20 Mar 2025
Other - LegalFile: Affidavit_compressed.pdf20 Mar 2025
Deviation Report with respect to model copy of AgreementFile: deviation report new_compressed.pdf20 Mar 2025
Proforma of Agreement for saleFile: Final Final AFS for KRUSHNA PARADISE DEVELOPERS rera draft.pdf20 Mar 2025
PAN CardFile: 1 Firm PAN.pdf13 Mar 2025
Details of encumbrances concerned to FinanceFile: 3 No Encumbrances Letter_Finance_.pdf13 Mar 2025
Details of encumbrances concerned to FinanceFile: 4 Legal encumbrances.pdf13 Mar 2025
Proforma of Allotment letterFile: 20 Allotment Letter.pdf13 Mar 2025
Declaration in FORM BFile: 9 Promoter Declaration_FORM B P_11zon.pdf13 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10 Form1.pdf13 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11 Form2.pdf13 Mar 2025
Other - LegalFile: Krushna Paradise Deed.pdf13 Mar 2025
Declaration about Commencement CertificateFile: 8 Tathastu Declaration of CC_Circular 32.pdf13 Mar 2025
CERSAI detailsFile: 15 CERSAI.pdf13 Mar 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: 25 format A.pdf13 Mar 2025
Deviation Report with respect to Allotment letterFile: 28 no deviation from allotment letter.pdf13 Mar 2025
Details of encumbrances concerned to LegalFile: 3 No Encumbrances Letter_Finance_.pdf13 Mar 2025
Details of encumbrances concerned to LegalFile: 4 Legal encumbrances.pdf13 Mar 2025
Other - TechnicalFile: 34 ANNEXURE - A declaration for one plot one project.pdf13 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: 17 Disclosure of Interest in othe Real Estate Org_11zon.pdf13 Mar 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: 26 format B.pdf13 Mar 2025
Disclosure for secured/unsecured finance availed for the projectFile: 13 Disclosure for Secured or unsecured finance availed for the project.pdf13 Mar 2025

How this compares with Pune

3%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Rivereast Residency on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near dehu13,700+ in Pune

Builder: KRUSHNA PARADISE DEVELOPERS

KRUSHNA PARADISE DEVELOPERS has 1 registration on MahaRERA, including Rivereast Residency. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Rivereast Residency is delayed beyond 1 Mar 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Rivereast Residency?

The registered promoter entity is KRUSHNA PARADISE DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Rivereast Residency?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Rivereast Residency?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Rivereast Residency?

The professionals named in the filing: Architect: Laxmi associates and consultants; Engineer: shriraj shinde; Engineer: Pravin maruti dhotre; Chartered Accountant: Navdeep Jindal; Chartered Accountant: CA Dolly Gandhi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Rivereast Residency?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Rivereast Residency. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Rivereast Residency to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.