KESHAV KUNJ

By M/S SANSKRUTI DEVELOPERS AND BUILDERS

RG-MH-23085 · RERA P52100032856 · Last updated on MahaRERA portal: 29 May 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken
  • Rs 5.00 crore secured on the land, in favour of CAPRI GLOBAL CAPITAL LIMITED

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
22 of 22Construction stages doneacross 2 buildings; every applicable stage filed complete
75 of 183Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 88 documents Report an error

KESHAV KUNJ is a Others project by M/S SANSKRUTI DEVELOPERS AND BUILDERS in Pune, Maharashtra, registered with MahaRERA as P52100032856 on 2 Feb 2022. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 12 months from the original filing. 108 of the 183 units on this registration are recorded sold or booked, and 22 of 22 construction stages are filed complete.

At a glance

Project

  • NameKESHAV KUNJ
  • TypeOthers
  • Location
    • -
    • DEHU
    • Haveli
    • Pune
    • 412109
  • Pincode412109
  • RERA no.P52100032856
  • ReraGenie IDRG-MH-23085

Builder

  • NameM/S SANSKRUTI DEVELOPERS AND BUILDERS
  • Entity typePartnership
  • PartnersDEEPAK BALASAHEB RAYKAR, VIKAS SHIVAJIRAO GAIKWAD

Key dates

10 months past promisethis monthRegisteredFeb 2022First promiseDec 2024Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on2 Feb 2022
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 31 Dec 2024)
  • Buildings2 building records
  • Documents filed88 files

Current status

59%108 of 183 units booked

Figures as on 29 May 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA9969675
WING BNA991080108

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 29 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 22 construction stages are filed complete across 2 buildings.

WING A100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 29 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes97%
Water SupplyYes97%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes97%
Storm Water DrainsYes97%
Landscaping & Tree PlantingYes97%
Street LightingYes97%
Community BuildingsYes97%
Treatment And Disposal Of Sewage And Sullage WaterYes97%
Solid Waste Management And DisposalYes97%
Water conservation /Rain water harvestingYes97%
Energy managemcntYes97%
Fire protection and fire safety requirementsYes97%
Electrical meter room, sub-station, receiving stationYes97%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed135

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots135
Closed/Covered135
BuildingClosed/CoveredTotal
WING A6868
WING B6767

Land and ownership2

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,466 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared present
Charge in favour ofCAPRI GLOBAL CAPITAL LIMITED
Secured amountRs 5.00 crore
CERSAI search filedYes
Declared on17 Sep 2025
LandownerVillageDistrict
KESHAV MARUTI PACHPINDDEHUPune
SHAKUNTALA KESHAV PACHPINDDEHUPune

Approvals and building plan

Sanctioning authorityDEHU NAGAR PANCHAYAT OFFICE
Permissible FSI15422.97
Proposed, not sanctioned10,923 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKOTHRUD PUNE 411038

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCS ARCHITECT
ArchitectC S ARCHITECT
EngineerAIJAJ NADAF NADAF
Chartered AccountantAMOL C. DATAR CHANDRAKANT DATAR
PartnerRole in project
M/S SANSKRUTI DEVELOPERS AND BUILDERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100025714Dec 2024 → Dec 2025

Reason as filed by the promoterdelayThe project work is completed nearly around 80%, to complete the remaining construction of the said project we need extension till 31/12/2025.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Jan 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Dec 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Dec 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Dec 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed88

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FORM 1 01-04-2025 (1).pdf29 May 2025
Form 2File: FORM 2 01-04-2025.pdf29 May 2025
Form 3File: FORM 3 01-04-2025.pdf29 May 2025
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD 01-04-2025.pdf29 May 2025
Details of encumbrancesFile: ENCUMBRANCE CERTIFICATE KESHAV KUNJ 16-01-2025.pdf16 Jan 2025
Details of encumbrancesFile: 135 Capri mortgage deed index 2.pdf16 Jan 2025
Details of encumbrancesFile: Capri Global Relised deed index 2.pdf16 Jan 2025
CERSAI detailsFile: CERSAI report Keshav Kunj.pdf16 Jan 2025
Disclosure for secured/unsecured finance availed for the projectFile: final secured and unsecured finance.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 31 12 2024.pdf2 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 31 12 2024 final.pdf2 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 31 12 2024.pdf2 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD 31 12 2024.pdf2 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: FORM A BANK ACCOUNTS (1).pdf2 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: VSG Annexure A (1).pdf2 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DBR Annexure A (1).pdf2 Jan 2025
Declaration in FORM BFile: FORM B EXTENSION.pdf23 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30 09 2023.pdf17 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 31 12 2023.pdf17 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 31 03 2024.pdf17 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30 06 2024.pdf17 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30 09 2024.pdf17 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 30 09 2024.pdf16 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 30 06 2024 (2).pdf16 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 31 03 2024.pdf16 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 31 12 2023 (2).pdf16 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 30 09 2023.pdf16 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 30 09 2022.pdf16 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 30 09 2023.pdf16 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 30 09 2024 (2).pdf16 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 30 06 2024 (2).pdf16 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 31 03 2024.pdf16 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 30 09 2022.pdf16 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 31 12 2023 (2).pdf16 Dec 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD 30 09 2023.pdf16 Dec 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD 31 12 2023 (2).pdf16 Dec 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD 31 03 2024.pdf16 Dec 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD 30 06 2024 (2).pdf16 Dec 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD 30 09 2024 (2).pdf16 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A 22 23.pdf16 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 22 23.pdf16 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A 23 24.pdf16 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 23 24 (2).pdf16 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate 13-07-2023.pdf13 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf13 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Engineer Certificate 2021-22.pdf13 Jul 2023
Disclosure of sold/ booked inventoryFile: SOLD - UNSOLD 13-07-2023_compressed.pdf13 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA Certificate 13-07-2023.pdf13 Jul 2023
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY.pdf12 May 2023
Disclosure of sold/ booked inventoryFile: sold inventory March-2023.pdf2 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 KESHVKUNJ.pdf2 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 KESHVKUNJ mail 02-05-2023.pdf2 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1 March-2023.pdf26 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form 2 March 2023.pdf26 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Form 2A March 2023.pdf26 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Booked Inventory March -2023.pdf26 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate FORM 3 March-2023.pdf26 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf1 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 (1).pdf1 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form-2A.pdf1 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3.pdf1 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form-5.pdf1 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECT CERTIFIACTE KESHVKUNJ.pdf15 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 ENGINEER CERTIFIACTE KESHVKUNJ_compressed.pdf15 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA certificate KESHV KUNJ_compressed.pdf15 Aug 2022
Details of encumbrancesFile: Keshav Kunj - Encumbrance Certificate.pdf15 Jun 2022
Copy of the legal title reportFile: Keshav Kunj - Search Report.pdf24 Jan 2022
Proforma of Allotment letterFile: Flat agreement Draft--Marathi - Sanskruti developers and builders -FLAT -RERA- 135-AGREEME24 Jan 2022
Building plan approvalFile: 02_compressed.pdf29 Dec 2021
Building plan approvalFile: 03_compressed.pdf29 Dec 2021
Building plan approvalFile: 04_compressed.pdf29 Dec 2021
Building plan approvalFile: 05_compressed.pdf29 Dec 2021
Building plan approvalFile: 06_compressed.pdf29 Dec 2021
Building Plan Approval / NA Order for plotted developmentFile: 02_compressed.pdf29 Dec 2021
Building Plan Approval / NA Order for plotted developmentFile: 03_compressed.pdf29 Dec 2021
Building Plan Approval / NA Order for plotted developmentFile: 04_compressed.pdf29 Dec 2021
Building Plan Approval / NA Order for plotted developmentFile: 05_compressed.pdf29 Dec 2021
Building Plan Approval / NA Order for plotted developmentFile: 06_compressed.pdf29 Dec 2021
Details of encumbrancesFile: NO ENCUMBERANCE.pdf28 Dec 2021
Declaration about Commencement CertificateFile: DECLARATION OF COMMENCEMENT .pdf28 Dec 2021

How this compares with Pune

59%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KESHAV KUNJ on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near -13,700+ in Pune

Builder: M/S SANSKRUTI DEVELOPERS AND BUILDERS

M/S SANSKRUTI DEVELOPERS AND BUILDERS has 1 registration on MahaRERA, including KESHAV KUNJ. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that KESHAV KUNJ shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if KESHAV KUNJ is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KESHAV KUNJ?

The registered promoter entity is M/S SANSKRUTI DEVELOPERS AND BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KESHAV KUNJ?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KESHAV KUNJ?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KESHAV KUNJ?

The professionals named in the filing: Architect: CS ARCHITECT; Architect: C S ARCHITECT; Engineer: AIJAJ NADAF NADAF; Chartered Accountant: AMOL C. DATAR CHANDRAKANT DATAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KESHAV KUNJ?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KESHAV KUNJ. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KESHAV KUNJ to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.