Home / Browse projects / Mumbai Suburban, Maharashtra / SAMARTH ENCLAVE F AND G WING ANDHERI CHHAYA CHS

Registered No litigation declared Others project

SAMARTH ENCLAVE F AND G WING ANDHERI CHHAYA CHS

By SAMARTH ERECTORS AND DEVELOPERS

RG-MH-34194 · RERA P51800010790 · Last updated on MahaRERA portal: 16 May 2026

Source: official MahaRERA filing

Red flags

  • 3 complaints at MahaRERA
  • Completion date moved by 36 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 36 months from the original
8 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 98%
7 of 82Units unsoldnot recorded sold or booked
3Complaints at MahaRERAon this registration
Jump to the 112 documents Report an error

SAMARTH ENCLAVE F AND G WING ANDHERI CHHAYA CHS is a Others project by SAMARTH ERECTORS AND DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800010790 on 31 Aug 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 36 months from the original filing. 75 of the 82 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete. 3 complaints are on record with the regulator.

At a glance

Project

  • NameSAMARTH ENCLAVE F AND G WING ANDHERI CHHAYA CHS
  • TypeOthers
  • Location
    • Goregaon East
    • Andheri
    • Mumbai Suburban
    • 400093
  • Pincode400093
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800010790
  • ReraGenie IDRG-MH-34194

Builder

  • NameSAMARTH ERECTORS AND DEVELOPERS
  • Entity typePartnership
  • PartnersWAHID GANI QURESHI, SHAILESH BHUPATRAI ADHYARU, MANISH VAMAN AMBRE
  • Other registrations2 more →

Key dates

this monthRegisteredAug 2017First promiseDec 2023Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Aug 2017
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2023)
  • Buildings2 building records
  • Documents filed112 files

Current status

91%75 of 82 units booked
37.0%Work done, per cost certificate

Figures as on 16 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAMARTH ENCLAVE F WINGNA121131435
SAMARTH ENCLAVE G WINGNA121144347

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 16 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 98%.

SAMARTH ENCLAVE F WING74%
ActivityProgress
Excavation98%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
SAMARTH ENCLAVE G WING74%
ActivityProgress
Excavation97%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 16 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes25%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes25%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes75%
Electrical meter room, sub-station, receiving stationYes20%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,813 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Mar 2026

Approvals and building plan

Sanctioning authoritySLUM REHABILATION AUTHORITY
Permissible FSI4505.0
Proposed, not sanctioned3,247 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch1st Floor Hem Nivas 87 S V Road Kandivali West Mumbai 400067
Estimated costRs 20.40 cr
Cost incurredRs 7.56 cr
Work done37.05%
BuildingWingEstimatedIncurred
-NARs 7.14 crRs 1.55 cr
SAMARTH ENCLAVE F WINGNARs 6.63 crRs 3.01 cr
SAMARTH ENCLAVE G WINGNARs 6.63 crRs 3.01 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAJIT KUMAR RANE
ArchitectKALPESH MEHTA
EngineerMUKESH KUMAR
EngineerMEET ADHYARU
Chartered AccountantNEHALI & CO
PartnerRole in project
SAMARTH ERECTORS AND DEVELOPERS-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800018115Dec 2023 → Dec 2024

Reason as filed by the promoterDUE TO COVID-19 AND PERMISSION DELAY THE PROJECT WAS NOT ABLE TO GET COMPLETED ON TIME. WE WOULD LIKE TO REQUEST YOU TO FURTHER GRANT US EXTENSION FOR 12 MONTHS

EXT51800025904Dec 2023 → Dec 2025

Reason as filed by the promoterhowever, this project has faced several issues due to which there were delays. Few of which are listed below: As this is a Slum Rehabilitation project, the local slum tenants were creating petty issues at site, which in turn had slowed down the construction work of the sale building. Receipt of MoEF approval on 22.08.2023, post which execution work was resumed. Changes in the policy from DCR 1991 to DCRP 2034, because of which the plans had to be amended, which in turn caused a slight delay. Changes in Fire Safely Regulations in recent times, resulting in plan amendments. We hereby say the we

EA08042620577Dec 2023 → Dec 2026

Reason as filed by the promoterSUBJECT-EXTENSION FOR PROJECT: - Samarth Enclave Andheri Chhaya CHS F & G Wing (RERA no :- P51800010790) Dear Sir, We would like to request you that the Project Samarth Enclave which is located at Sher-e-Punjab, Opp. Hema Industrial Estate, Andheri East, Mumbai 400093 having its Registration No P51800010790 was mentioned to be completed on 31.12.2025. However, this project has faced several issues due to which there were delays. Few of which are listed below: As this is a Slum Rehabilitation project, the local slum tenants issues at site, which in turn had slowed down the construction work of

Litigation declared2

CaseCourtStatus
691/2017HIGH COURTPENDING FOR HEARING
1168 of 2019/2019Bombay high courtex party order challenged

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC006000000001119LAKHMENDRA KHURANASAMARTH ERECTORS & DEVELOPERS06/10/2017
CC006000000209705MANOHAR SHIVAJI GAWDESAMARTH ERECTORS AND DEVELOPERS13/03/2022
CC12602799Priti Mithilesh PathakSAMARTH ERECTORS AND DEVELOPERS13/05/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Sep 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Sep 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed112

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 112 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect.pdf16 May 2026
Withdrawal Update Form 2File: Engineers.pdf16 May 2026
Withdrawal Update Form 3File: Form 3.pdf16 May 2026
Form 2A (FY 2025-2026)File: F G wing Form 2A March 2026.pdf16 May 2026
Withdrawal Update Form 1File: Architech Certificate FG Wing June 2025.pdf1 Apr 2026
Withdrawal Update Form 1File: Architech Certificate FG Wing Sep 2025.pdf1 Apr 2026
Withdrawal Update Form 1File: Architech Certificate FG Wing Dec 2025.pdf1 Apr 2026
Withdrawal Update Form 2File: Engineers Certificate F G Wing June 2025.pdf1 Apr 2026
Withdrawal Update Form 2File: Engineers Certificate F G Wing sept 2025.pdf1 Apr 2026
Withdrawal Update Form 2File: Engineering Certificate FG Wing Dec 2025.pdf1 Apr 2026
Withdrawal Update Form 3File: Form 3 F G Wing June 2025 signed scan.pdf1 Apr 2026
Withdrawal Update Form 3File: F G Wing Form 3 Sep 2025 signed copy.pdf1 Apr 2026
Withdrawal Update Form 3File: Form 3 FG Wing Dec 2025 Signed scan.pdf1 Apr 2026
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A march 24.pdf4 Mar 2025
Declaration in FORM BFile: FG Wing FORM-B 500 stamp.pdf27 Feb 2025
Disclosure of sold/ booked inventoryFile: inventory disclosure dec 24.pdf22 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 dec 24.pdf21 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 dec 24.pdf21 Feb 2025
Certificates of CA (Form 3)File: F G Wing March 24 Form 3 signed copy (1).pdf19 Feb 2025
Certificates of CA (Form 3)File: F G wing June 24 Form 3 signed copy (1).pdf19 Feb 2025
Certificates of CA (Form 3)File: Form-3 F G Wing Dec 2024 signed copy (1).pdf19 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24 FG wing signed scan (1).pdf19 Feb 2025
Declaration in FORM BFile: Form B.pdf12 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 with Promoter signature.pdf19 Dec 2023
Declaration in FORM BFile: Form B.pdf11 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form - 2 Sept 23.pdf11 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 18-19.pdf11 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 19-20.pdf11 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 20-21.pdf11 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf11 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf11 Dec 2023
Certificates of CA (Form 3)File: F G Wing Final Form 3.pdf4 Dec 2023
Declaration about Commencement CertificateFile: CC Declaration.pdf23 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A march 2020.pdf23 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A march 2021.pdf23 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2A march 2022.pdf23 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A march 2023.pdf23 Oct 2023
CERSAI detailsFile: Cersai Declaration.pdf23 Oct 2023
Certificates of CA (Form 3)File: FG wing Mar 18.pdf6 Sep 2023
Certificates of CA (Form 3)File: FG wing Mar 19.pdf6 Sep 2023
Certificates of CA (Form 3)File: FG wing Mar 20.pdf6 Sep 2023
Certificates of CA (Form 3)File: FG wing Mar 21.pdf6 Sep 2023
Certificates of CA (Form 3)File: FG wing Dec 21.pdf6 Sep 2023
Certificates of CA (Form 3)File: FG wing Mar 22.pdf6 Sep 2023
Certificates of CA (Form 3)File: FG wing June 22.pdf6 Sep 2023
Certificates of CA (Form 3)File: FG wing Sept 22.pdf6 Sep 2023
Certificates of CA (Form 3)File: FG wing Dec 22.pdf6 Sep 2023
Building plan approvalFile: IOA.pdf5 Sep 2023
Layout approvalFile: Sheet 1 IOA 21-OCT-2022_11zon.pdf5 Sep 2023
Layout approvalFile: Sheet 2 IOA 21-OCT-2022_11zon.pdf5 Sep 2023
Layout approvalFile: Sheet 3 IOA 21-OCT-2022_11zon.pdf5 Sep 2023
Layout approvalFile: Sheet 4 IOA 21-OCT-2022_11zon.pdf5 Sep 2023
Layout approvalFile: Sheet 5 IOA 21-OCT-2022_11zon.pdf5 Sep 2023
Layout approvalFile: Sheet 6 IOA 21-OCT-2022_11zon.pdf5 Sep 2023
Layout approvalFile: Sheet 7 IOA 21-OCT-2022_11zon.pdf5 Sep 2023
Layout approvalFile: Sheet 8 IOA 21-OCT-2022_11zon.pdf5 Sep 2023
Layout approvalFile: Sheet 8 IOA 21-OCT-2022_11zon.pdf5 Sep 2023
Layout approvalFile: Sheet 9 IOA 21-OCT-2022_11zon.pdf5 Sep 2023
Copy of Layout Approval (in case of layout)File: Sheet 1 IOA 21-OCT-2022_11zon.pdf5 Sep 2023
Copy of Layout Approval (in case of layout)File: Sheet 2 IOA 21-OCT-2022_11zon.pdf5 Sep 2023
Copy of Layout Approval (in case of layout)File: Sheet 3 IOA 21-OCT-2022_11zon.pdf5 Sep 2023
Copy of Layout Approval (in case of layout)File: Sheet 4 IOA 21-OCT-2022_11zon.pdf5 Sep 2023
Copy of Layout Approval (in case of layout)File: Sheet 5 IOA 21-OCT-2022_11zon.pdf5 Sep 2023
Copy of Layout Approval (in case of layout)File: Sheet 6 IOA 21-OCT-2022_11zon.pdf5 Sep 2023
Copy of Layout Approval (in case of layout)File: Sheet 7 IOA 21-OCT-2022_11zon.pdf5 Sep 2023
Copy of Layout Approval (in case of layout)File: Sheet 8 IOA 21-OCT-2022_11zon.pdf5 Sep 2023
Copy of Layout Approval (in case of layout)File: Sheet 8 IOA 21-OCT-2022_11zon.pdf5 Sep 2023
Copy of Layout Approval (in case of layout)File: Sheet 9 IOA 21-OCT-2022_11zon.pdf5 Sep 2023
Building Plan Approval (IOD)File: IOA.pdf5 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 F G Wing March 2018.pdf5 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2 F G Wing March 2019.pdf5 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 3 F G Wing March 2020.pdf5 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 4 F G Wing March 2021.pdf5 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 5 F G Wing Dec 2021.pdf5 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 6 F G Wing March 2022.pdf5 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 7 F G Wing June 2022.pdf5 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 7 F G Wing June 2022.pdf5 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 9 F G wing Dec 2022.pdf5 Sep 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD F G WING.pdf10 May 2023
Building plan approvalFile: IOA Sher e punjab.pdf14 Feb 2023

How this compares with Mumbai Suburban

91%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 36 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAMARTH ENCLAVE F AND G WING ANDHERI CHHAYA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Goregaon East6,700+ in Mumbai Suburban

2 kmSAMARTH ENCLAVE F AND G Completed 103Lapsed / revoked 56Other 86Dot size: filed unitsN

Filed coordinates, straight-line distance. 245 registered projects within 2 km.

Builder: SAMARTH ERECTORS AND DEVELOPERS

SAMARTH ERECTORS AND DEVELOPERS has 3 registrations on MahaRERA, including SAMARTH ENCLAVE F AND G WING ANDHERI CHHAYA CHS and SAMARTH ENCLAVE H WING ANDHERI CHHAYA CHS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SAMARTH ENCLAVE F AND G WING ANDHERI CHHAYA CHS is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAMARTH ENCLAVE F AND G WING ANDHERI CHHAYA CHS?

The registered promoter entity is SAMARTH ERECTORS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAMARTH ENCLAVE F AND G WING ANDHERI CHHAYA CHS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SAMARTH ENCLAVE F AND G WING ANDHERI CHHAYA CHS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SAMARTH ENCLAVE F AND G WING ANDHERI CHHAYA CHS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAMARTH ENCLAVE F AND G WING ANDHERI CHHAYA CHS?

The professionals named in the filing: Architect: AJIT KUMAR RANE; Architect: KALPESH MEHTA; Engineer: MUKESH KUMAR; Engineer: MEET ADHYARU; Chartered Accountant: NEHALI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAMARTH ENCLAVE F AND G WING ANDHERI CHHAYA CHS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAMARTH ENCLAVE F AND G WING ANDHERI CHHAYA CHS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAMARTH ENCLAVE F AND G WING ANDHERI CHHAYA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.