SALASAR SPARSH PHASE I

By MAXUS PRIME REALTY LLP

RG-MH-14399 · RERA P51700022775 · Last updated on MahaRERA portal: 9 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 39 months
  • 1 extension taken
  • Rs 50.00 crore secured on the land, in favour of ICICI HOME FINANCE LIMITED

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 39 months from the original
5 of 11Construction stages donefurthest along: Internal walls, 75%
81 of 156Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 123 documents Report an error

SALASAR SPARSH PHASE I is a Residential / Group Housing project by MAXUS PRIME REALTY LLP in Thane, Maharashtra, registered with MahaRERA as P51700022775 on 17 Oct 2019. Possession is promised by 31 Dec 2028. The completion date has moved by 39 months from the original filing. 75 of the 156 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameSALASAR SPARSH PHASE I
  • TypeResidential / Group Housing
  • Location
    • MAHESHWARI BHAVAN ROAD
    • BHAYANDAR WEST
    • BHAYANDAR
    • Thane
    • 401101
  • Pincode401101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700022775
  • ReraGenie IDRG-MH-14399

Builder

  • NameMAXUS PRIME REALTY LLP
  • Entity typePartnership
  • PartnersANAND RAMPRASAD AGRAWAL, MANHARLAL BALVANTRAI MEHTA
  • Declared earlier projects1 →

Key dates

this monthRegisteredOct 2019First promiseSep 2025Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Oct 2019
  • Promised completion31 Dec 2028
  • Revised completionRevised to 31 Dec 2028 (originally 30 Sep 2025)
  • Buildings1 building record
  • Documents filed123 files

Current status

48%75 of 156 units booked
75.6%Work done, per cost certificate

Figures as on 9 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SALASAR SPARSH BUILDING NUMBER 1 WING BNA36331560156

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 75%.

SALASAR SPARSH BUILDING NUMBER 1 WING B: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 9 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area5,044 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofICICI HOME FINANCE LIMITED
Secured amountRs 50.00 crore
CERSAI search filedYes
Declared on10 Jul 2025

Approvals and building plan

Sanctioning authorityMira Bhaindar Municipal Corporation
Permissible FSI11471.42
Proposed, not sanctioned3,372 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Porwal Complex, Shop No. 13, Dr B.R. Ambedkar Road, Bhayandar West, Thane.401101
Estimated costRs 68.00 cr
Cost incurredRs 51.38 cr
Work done75.56%
BuildingWingEstimatedIncurred
SALASAR SPARSH BUILDING NUMBER 1 WING BNARs 63.00 crRs 51.38 cr
-NARs 5.00 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTUSHAR SALI & ASSOCIATES
ArchitectANISH & ASSOCIATES
EngineerPROTECH CONSULTANTS
EngineerKISHOR CHAVAN
Chartered AccountantTHAR & CO
Chartered AccountantSANJAY K SHARMA AND CO1
PartnerRole in project
MAXUS PRIME REALTY LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700017323Sep 2025 → Dec 2028

Reason as filed by the promoter1. The Project SALASAR SPARSH PHASE I, was registered with MAHARERA on 17/10/2019, at that time we had registered the Project the approval was taken as per old Development Control and Promotion Regulations. 2. We have submitted our Revised Plans for the project as per New DEVELOPMENT CONTROL AND PROMOTION REGULATIONS 2020. We are yet to receive the Revised Commencement Certificate along with the Revised Sanctioned Plans. 3. As soon as we will receive the revised Commencement Certificate and Revised Sanctioned Plans, we will make the necessary changes to the profile. 4. To the date of this appl

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Sep 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Sep 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Nov 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed123

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 123 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1_ MARCH 26_ SALASAR SPARSH.pdf9 Jun 2026
Withdrawal Update Form 1File: FORM 1_ MARCH 26_ SALASAR SPARSH.pdf9 Jun 2026
Withdrawal Update Form 2File: FORM 2_ MARCH 26_ SALASAR SPARSH.pdf9 Jun 2026
Withdrawal Update Form 2File: FORM 2_ MARCH 26_ SALASAR SPARSH.pdf9 Jun 2026
Withdrawal Update Form 3File: FORM 3_ MARCH 26_ SALASAR SPARSH_compressed.pdf9 Jun 2026
Withdrawal Update Form 3File: FORM 3_ MARCH 26_ SALASAR SPARSH_compressed.pdf9 Jun 2026
Withdrawal Update Form 1File: FORM 1_DEC 25_SALASAR SPARSH.pdf25 Mar 2026
Withdrawal Update Form 2File: FORM 2_DEC 25_SALASAR SPARSH.pdf25 Mar 2026
Withdrawal Update Form 3File: FORM 3_DEC 25_SALASAR SPARSH_compressed.pdf25 Mar 2026
Withdrawal Update Form 1File: FORM 1_SEP 25_SALASAR SPARSH.pdf18 Nov 2025
Withdrawal Update Form 2File: FORM 2_SEP 25_SALASAR SPARSH.pdf18 Nov 2025
Withdrawal Update Form 3File: FORM 3_ SEP 25_ SALASAR SPARSH com.pdf18 Nov 2025
Withdrawal Update Form 1File: FORM 1_ JUNE 25_ SALASAR SPARSH.pdf21 Aug 2025
Withdrawal Update Form 1File: FORM 1_ JUNE 25_ SALASAR SPARSH.pdf21 Aug 2025
Withdrawal Update Form 1File: FORM 1_ JUNE 25_ SALASAR SPARSH.pdf21 Aug 2025
Withdrawal Update Form 1File: FORM 1_ JUNE 25_ SALASAR SPARSH.pdf21 Aug 2025
Withdrawal Update Form 1File: FORM 1_ JUNE 25_ SALASAR SPARSH.pdf21 Aug 2025
Withdrawal Update Form 1File: FORM 1_ JUNE 25_ SALASAR SPARSH.pdf21 Aug 2025
Withdrawal Update Form 1File: FORM 1_ JUNE 25_ SALASAR SPARSH.pdf21 Aug 2025
Withdrawal Update Form 1File: FORM 1_ JUNE 25_ SALASAR SPARSH.pdf21 Aug 2025
Withdrawal Update Form 2File: FORM 2_ JUNE 25_ SALASAR SPARSH.pdf21 Aug 2025
Withdrawal Update Form 2File: FORM 2_ JUNE 25_ SALASAR SPARSH.pdf21 Aug 2025
Withdrawal Update Form 2File: FORM 2_ JUNE 25_ SALASAR SPARSH.pdf21 Aug 2025
Withdrawal Update Form 2File: FORM 2_ JUNE 25_ SALASAR SPARSH.pdf21 Aug 2025
Withdrawal Update Form 2File: FORM 2_ JUNE 25_ SALASAR SPARSH.pdf21 Aug 2025
Withdrawal Update Form 2File: FORM 2_ JUNE 25_ SALASAR SPARSH.pdf21 Aug 2025
Withdrawal Update Form 2File: FORM 2_ JUNE 25_ SALASAR SPARSH.pdf21 Aug 2025
Withdrawal Update Form 2File: FORM 2_ JUNE 25_ SALASAR SPARSH.pdf21 Aug 2025
Withdrawal Update Form 3File: FORM 3_ JUNE 25_ SALASAR SPARSH.pdf21 Aug 2025
Withdrawal Update Form 3File: FORM 3_ JUNE 25_ SALASAR SPARSH.pdf21 Aug 2025
Withdrawal Update Form 3File: FORM 3_ JUNE 25_ SALASAR SPARSH.pdf21 Aug 2025
Withdrawal Update Form 3File: FORM 3_ JUNE 25_ SALASAR SPARSH.pdf21 Aug 2025
Withdrawal Update Form 3File: FORM 3_ JUNE 25_ SALASAR SPARSH.pdf21 Aug 2025
Withdrawal Update Form 3File: FORM 3_ JUNE 25_ SALASAR SPARSH.pdf21 Aug 2025
Withdrawal Update Form 3File: FORM 3_ JUNE 25_ SALASAR SPARSH.pdf21 Aug 2025
Withdrawal Update Form 3File: FORM 3_ JUNE 25_ SALASAR SPARSH.pdf21 Aug 2025
Form 1File: FORM 1_ JUNE 24_ SALASAR SPARSH.pdf11 Jul 2025
Form 2File: FORM 2_ JUNE 24_ SALASAR SPARSH.pdf11 Jul 2025
Form 3File: FORM 3_ JUNE 24_ SALASAR SPARSH_compressed.pdf11 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ JUNE 24_ SALASAR SPARSH.pdf11 Jul 2025
Form 1File: FORM 1_ SEP 24_ SALASAR SPARSH.pdf11 Jul 2025
Form 2File: FORM 2_ SEP 24_ SALASAR SPARSH.pdf11 Jul 2025
Form 3File: FORM 3_ SEP 24_ SALASAR SPARSH.pdf11 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ SEP 24_ SALASAR SPARSH.pdf11 Jul 2025
Form 1File: FORM 1_ DEC 24_ SALASAR SPARSH.pdf11 Jul 2025
Form 2File: FORM 2_ DEC 24_ SALASAR SPARSH.pdf11 Jul 2025
Form 3File: FORM 3_ DEC 24_ SALASAR SPARSH.pdf11 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ DEC 24_ SALASAR SPARSH.pdf11 Jul 2025
Form 1File: FORM 1_ MARCH 25_ SALASAR SPARSH.pdf11 Jul 2025
Form 2File: FORM 2_ MARCH 25_ SALASAR SPARSH.pdf11 Jul 2025
Form 3File: FORM 3_ MARCH 25_ SALASAR SPARSH_compressed (1).pdf11 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ MARCH 25_ SALASAR SPARSH.pdf11 Jul 2025
Form 2A (FY 2023-2024)File: FORM 2A_2024.pdf11 Jul 2025
Form 2A (FY 2024-2025)File: FORM 2A_2025.pdf11 Jul 2025
Form 5 (FY 2023-2024)File: FORM 5_ MARCH 24.pdf11 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 FORM 1_ MARCH 24.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 FORM 2_ MARCH 24.pdf9 Aug 2024
Disclosure of sold/ booked inventoryFile: 4 SOLD UNSOLD_ MARCH 24_compressed.pdf9 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 FORM 3_ MARCH 24_compressed.pdf9 Aug 2024
Proforma of Agreement for saleFile: Draft (1).pdf29 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank - Declaration.pdf27 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-SALASAR SPARSH PHASE 1_DEC 23.pdf28 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-SALASAR SPARSH PHASE 1_DEC 23.pdf28 Feb 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD-SALASAR SPARSH PHASE 1_DEC 23.pdf28 Feb 2024
Details of encumbrances concerned to FinanceFile: 2 Details of encumbrances.pdf24 Jan 2024
Details of encumbrances concerned to LegalFile: 2 Details of encumbrances.pdf24 Jan 2024
CERSAI detailsFile: CHMUM00001580305-CERSAI_Search_Report_Security_Interest_Id_Based_Search_19_01_2024_16_15_224 Jan 2024
Details of encumbrancesFile: ENCUMBERNCE CERTIFICATE (2).pdf13 Jan 2024
Building plan approvalFile: PLAN PRINT-1.pdf16 Nov 2023
Building plan approvalFile: PLAN PRINT-2.pdf16 Nov 2023
Building plan approvalFile: PLAN PRINT-3.pdf16 Nov 2023
Building plan approvalFile: PLAN PRINT-4.pdf16 Nov 2023
Building plan approvalFile: PLAN PRINT-5.pdf16 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN PRINT-1.pdf16 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN PRINT-2.pdf16 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN PRINT-3.pdf16 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN PRINT-4.pdf16 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN PRINT-5.pdf16 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: CC PRINT.pdf16 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-SALASAR SPARSH_SEP 23.pdf7 Nov 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Salasar WoodsOLD 299 NEW 180 HISSA 4 KANAKIA ROAD MIRA ROAD EAST THANE 401101144CompletedDec 2020Late, Dec 2021

How this compares with Thane

48%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 39 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SALASAR SPARSH PHASE I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BHAYANDAR WEST7,600+ in Thane

2 kmSALASAR SPARSH PHASE ICompleted 39Lapsed / revoked 30Other 22Dot size: filed unitsN

Filed coordinates, straight-line distance. 91 registered projects within 2 km.

Builder: MAXUS PRIME REALTY LLP

MAXUS PRIME REALTY LLP has 1 registration on MahaRERA, including SALASAR SPARSH PHASE I. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SALASAR SPARSH PHASE I is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SALASAR SPARSH PHASE I?

The registered promoter entity is MAXUS PRIME REALTY LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SALASAR SPARSH PHASE I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SALASAR SPARSH PHASE I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SALASAR SPARSH PHASE I?

The professionals named in the filing: Architect: TUSHAR SALI & ASSOCIATES; Architect: ANISH & ASSOCIATES; Engineer: PROTECH CONSULTANTS; Engineer: KISHOR CHAVAN; Chartered Accountant: THAR & CO; Chartered Accountant: SANJAY K SHARMA AND CO1. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SALASAR SPARSH PHASE I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SALASAR SPARSH PHASE I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SALASAR SPARSH PHASE I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.