Completed No litigation declared Residential / Group Housing project

Sakaleshwar CHS Ltd

By S Plus Associates

RG-MH-59058 · RERA P52000048975 · Last updated on MahaRERA portal: 19 Apr 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

Sakaleshwar CHS Ltd is a Residential / Group Housing project by S Plus Associates in Raigarh, Maharashtra, registered with MahaRERA as P52000048975 on 24 Jan 2023. The registration is recorded completed; possession was promised by 31 Dec 2026.

At a glance

Project

  • NameSakaleshwar CHS Ltd
  • TypeResidential / Group Housing
  • Location
    • Swami Nityanand Road
    • HOC Colony
    • Old Panvel
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • RERA no.P52000048975
  • ReraGenie IDRG-MH-59058

Builder

  • NameS Plus Associates
  • Entity typePartnership
  • PartnersSanket Satish Phase, Pooja Prashant Shinde
  • Other registrations1 more →
  • Completed2 of 2

Key dates

this monthRegisteredJan 2023PromisedDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on24 Jan 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed68 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sakaleshwar CHS LtdNA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

Sakaleshwar CHS Ltd: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 19 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed37

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots37
Closed/Covered12
Open Space25

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area532 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Sakaleshwar Co- Operative Housing Society LTDPanvelRaigarh

Approvals and building plan

Permissible FSI1625.14
Proposed, not sanctioned1,625 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRaje Complex Plot No- 198A Shivaji Chowk

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
S Plus Associates-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 15 Mar 2025

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Sakaleshwar CHS Ltd as on 31-03-2025.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sakaleshwar CHS Ltd as on March 2025.pdf19 Apr 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 1 Occupancy Certificate_ Completion Certificate_ Architect's certificate of completion for15 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sakaleshwar CHS Ltd as on Dec 2024.pdf29 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sakaleshwar CHS Ltd as on Dec 2024.pdf29 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form4 (2).pdf24 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: oc.pdf24 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sakaleshwar CHSL as on Sep 2024.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Sakaleshwar CHS Ltd as on 30th September 2024.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sakaleshwar CHSL as on Sep 2024.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SAKALESHWAR--8-ARCHITECT CERTIFICATE--FORM 1 Sep-2024.pdf8 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sakaleshwar CHSL as on June 2024.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Sakaleshwar CHS Ltd as on 30th June 2024.pdf19 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sakaleshwar CHSL as on June 2024.pdf16 Jul 2024
Disclosure of sold/ booked inventoryFile: Circular 29 - Sakaleshwar CHS March 2024.pdf24 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sakaleshwar CHSL as on March 2024.pdf16 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sakaleshwar CHSL as on March 2024.pdf16 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sakaleshwar CHSL as on March 2024.pdf10 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Sakaleshwar CHS Ltd as on 31-05-2023.pdf20 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sakaleshwar CHS Ltd as on Dec 2023.pdf18 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Sakaleshwar CHS Ltd as on 31st December 2023.pdf18 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sakaleshwar CHS as on Dec 2023.pdf6 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sakaleshwar CHS as on June 2023.pdf15 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sakaleshwar CHS as on March 2023.pdf15 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sakaleshwar CHS as on March 2023.pdf15 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sakaleshwar CHS Ltd as on June 2023.pdf15 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sakaleshwar CHS as on Sept 2023.pdf15 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sakaleshwar CHS as on March 2023.pdf15 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sakaleshwar CHS as on June 2023.pdf15 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sakaleshwar CHS as on Sept 2023.pdf15 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Sakaleshwar CHS Ltd as on September 2023.pdf18 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Sakaleshwar as on 31-03-2023.pdf6 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Sakaleshwar CHS Ltd as on 30th September 2023.pdf23 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Sakaleshwar CHS Ltd as on 30th September 2023.Pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 as on Sep 2023.pdf6 Oct 2023
Proforma of Agreement for saleFile: AFS_S Plus Associates_Sakaleshwar CHS LTD.pdf1 Sep 2023
Proforma of Agreement for saleFile: AFS_S Plus Associates_Sakaleshwar CHS LTD.pdf1 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5- Sakaleshwar FY 2022-23.pdf24 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Sakaleshwar CHS.pdf27 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Sakaleshwar CHS Ltd as on June 2023.pdf22 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Sakaleshwar CHS Ltd as on 30-06-2023.pdf22 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sakaleshwar CHS ltd Mar 23 - Form 2.pdf5 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Sakaleshwar CHS Ltd as on 31-03-2023.pdf5 May 2023
Building plan approvalFile: Plan_1-1.pdf10 Jan 2023
Building plan approvalFile: Plan_2-3.pdf10 Jan 2023
Building plan approvalFile: Plan_4-end.pdf10 Jan 2023
Layout approvalFile: 1 Copy of Layout Approval (in case of layout)_rotated.pdf10 Jan 2023
Copy of the legal title reportFile: Short Title - S Plus_compressed.pdf10 Jan 2023
Details of encumbrances concerned to FinanceFile: Encumbrance - Finance.pdf10 Jan 2023
Details of encumbrances concerned to FinanceFile: Encumbrance -legal.pdf10 Jan 2023
Details of encumbrances concerned to LegalFile: Encumbrance - Finance.pdf10 Jan 2023
Details of encumbrances concerned to LegalFile: Encumbrance -legal.pdf10 Jan 2023
Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout)_rotated.pdf10 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan_1-1.pdf10 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan_2-3.pdf10 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan_4-end.pdf10 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: CC- Sakaleshwar_11zon.pdf10 Jan 2023
Declaration about Commencement CertificateFile: Format D.pdf10 Jan 2023
Declaration in FORM BFile: Form B promoter.pdf10 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: First Form 3 - Sakaleshwar CHSL.pdf10 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexures A_compressed.pdf10 Jan 2023
Proforma of Agreement for saleFile: AFS.pdf10 Jan 2023
Proforma of Allotment letterFile: AL100123.pdf10 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf10 Jan 2023
Deviation Report with respect to Allotment letterFile: Deviation Allotment - Splus_compressed.pdf10 Jan 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Afs_compressed.pdf10 Jan 2023
PAN CardFile: Pan Card Firm.pdf6 Jan 2023
CERSAI detailsFile: CERSAI_Search_Report_200256892996_For_Asset_Based_Search_06_01_2023_12_12_24_631.pdf6 Jan 2023

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sakaleshwar CHS Ltd on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near HOC Colony, Old Panvel5,900+ in Raigarh

Builder: S Plus Associates

S Plus Associates has 2 registrations on MahaRERA, including Sai Vasant and Sakaleshwar CHS Ltd. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Sakaleshwar CHS Ltd is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sakaleshwar CHS Ltd?

The registered promoter entity is S Plus Associates, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sakaleshwar CHS Ltd?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sakaleshwar CHS Ltd?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in Sakaleshwar CHS Ltd?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sakaleshwar CHS Ltd. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sakaleshwar CHS Ltd to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.