Saichaitanya
RG-MH-27991 · RERA P52000031098 · Last updated on MahaRERA portal: 11 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 36 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Saichaitanya is a Others project by BHOSALE BUILDCON in Raigarh, Maharashtra, registered with MahaRERA as P52000031098 on 5 Oct 2021. Possession is promised by 31 Dec 2026. The completion date has moved by 36 months from the original filing. 2 of the 25 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.
At a glance
Project
- NameSaichaitanya
- TypeOthers
- Location
- SECTOR -25A
- PUSHPAK NEW
- Wahal
- Panvel
- Raigarh
- 410206
- Pincode410206
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000031098
- ReraGenie IDRG-MH-27991
Builder
- NameBHOSALE BUILDCON
- Entity typePartnership
- PartnersSumeet Dhanraj Garad, Babasaheb Mahadeo Bhosale, Prashant Prabhakar Patekar
- Other registrations2 more →
- Completed2 of 3
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on5 Oct 2021
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2023)
- Buildings1 building record
- Documents filed96 files
Current status
Figures as on 11 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Saichaitanya | NA | 7 | 7 | 22 | 3 | 25 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 11 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 75%.
Saichaitanya: 32% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 75% |
| Slabs of Super Structure | 75% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 11 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed13
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SHRI.SURAJ KANHA GHARAT | Ulawe | Raigarh |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Saichaitanya | NA | Rs 1.49 cr | Rs 95.27 lakh |
| - | NA | Rs 7.85 lakh | - |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VASTUYOG ARCHITECT |
| Engineer | SK Consultants & Engineers |
| Chartered Accountant | Nusrat Sayed |
| Chartered Accountant | Pranav Bhaskaran & Associates |
| Chartered Accountant | Vallabh Vijay Joshi & co. |
| Chartered Accountant | Gaurav S Rajpal & Co. |
| Partner | Role in project |
|---|---|
| BHOSALE BUILDCON | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We have 0 sold units hence we do not require consent of allottees for purpose of extension of RERA registration period of the said project.
Reason as filed by the promoterWe apologize for the delay in the completion of the project and the submission of this request. The delay has occurred due to unforeseen circumstances, including procurement issues, financial constraints, and site challenges. Despite these setbacks, we are working diligently to address these issues and complete the remaining work. Given the circumstances, we kindly request an extension until 31-12-2026. to complete the project and fulfil all regulatory requirements.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 15 Sep 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Jan 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 21 Nov 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 31 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed96
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 - Saichaitanya as on June 2026.pdf | 11 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 - Saichaitanya as on June 2026.pdf | 11 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 - Saichaitanya as on June 2026.pdf | 11 Jul 2026 |
| Withdrawal Update Form 1File: Form - 1 -Saichantnya as on march 2026.pdf | 13 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 Saichaitanya-Bhosale Cardinal- as on 31-03-2026.pdf | 13 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 Saichaitanya-Bhosale Cardinal- as on 31-03-2026.pdf | 13 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 - Saichaitanya as on Dec 2025.pdf | 13 May 2026 |
| Withdrawal Update Form 2File: Form 2 - Saichatanya as on Dec 2025.pdf | 13 May 2026 |
| Withdrawal Update Form 3File: Form 3 - Saichatanya as on Dec 2025.pdf | 13 May 2026 |
| Withdrawal Update Form 1File: Form 1 - Saichaitanya as on Sep 2025.pdf | 20 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 - Saichatanya as on Sept 2025.pdf | 20 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 - Saichaitanya as on Sep 2025.pdf | 20 Feb 2026 |
| Building plan approvalFile: SANCTIONED LAYOUT PLAN - Parking Highlighted.pdf | 21 Nov 2025 |
| Form 5 (FY 2023-2024)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24) (3).pdf | 25 Sep 2025 |
| Withdrawal Update Form 1File: Form 1 - Saichatanya as on June 2025.pdf | 22 Sep 2025 |
| Withdrawal Update Form 2File: Form 2 - Saichaitanya as on June 2025.pdf | 22 Sep 2025 |
| Withdrawal Update Form 3File: Form 3 - Saichatanya as on June 2025.pdf | 22 Sep 2025 |
| Form 1File: Form 1 - Saichaitanya as on December 2024.pdf | 8 Sep 2025 |
| Form 2File: Form 2 - Saichatanya as on December 2024 (SIGNED).pdf | 8 Sep 2025 |
| Form 3File: Form 3 - Saichatanya as on December 2024 (SIGNED).pdf | 8 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Saichaitanya as on December 2024.pdf | 8 Sep 2025 |
| Form 1File: Form 1 - Saichatanya as on June 2025.pdf | 26 Aug 2025 |
| Form 2File: Form 2 - Saichatanya as on June 2025.pdf | 26 Aug 2025 |
| Form 3File: Form 3 - Saichatanya as on June 2025.pdf | 26 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Saichaitanya as on June 2025.pdf | 26 Aug 2025 |
| Form 1File: Form 1 - Saichanitanya as on March 2025.pdf | 26 Aug 2025 |
| Form 2File: Form 2 - Saichaitanya as on March 2025.pdf | 26 Aug 2025 |
| Form 3File: Form 3 - Saichaitanya as on March 2025.pdf | 26 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Saichaitanya as on March 2025.pdf | 26 Aug 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Saichanitanya as on March 2025.pdf | 11 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Saichaitanya as on Dec 2024.pdf | 9 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Saichaitanya for FY 2023-24.pdf | 21 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Circular 29 - Saichantanya - Sep 2024.pdf | 7 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Saichaitanya-Bhosale Cardinal- as on 30-06-2024.pdf | 20 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Saichaitanya-Bhosale Cardinal- as on 30-09-2024.pdf | 20 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Saichatanya as on June 2024.pdf | 20 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Saichatanya as on September 2024.pdf | 20 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Architect’s Certificate of Percentage of Completion of Work (Form 1) (2).pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11 Engineer’s Certificate on Cost Incurred on Project (Form 2) (1).pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: zzzzzzzzzzzzzzzzz.pdf | 20 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Saichaitanya as on December 2023.pdf | 3 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Saichaitanya as on March 2024.pdf | 3 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Saichaitanya as on March 2024.pdf | 3 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sai Chaitanya Bhosale Cardinal as on Dec 2023.pdf | 29 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: CIRCULAR 29.pdf | 29 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Saichaitanya-Bhosale Cardinal- as on 31-12-2023.pdf | 29 Apr 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A - Seperate Bank Account Details.pdf | 29 Apr 2024 |
| Declaration in FORM BFile: Form B_with stamp.pdf | 13 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_with stamp.pdf | 13 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Jun 23_20240212_0001_11zon.pdf | 12 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Jun 23_20240212_0001_11zon.pdf | 12 Feb 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY 22-23_20240212_0002_11zon.pdf | 12 Feb 2024 |
| Declaration about Commencement CertificateFile: FORMAT D (32).pdf | 10 Feb 2024 |
| Declaration in FORM BFile: Form B (1).pdf | 10 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 (1).pdf | 10 Feb 2024 |
| CERSAI detailsFile: DECLARATION of Cersai.pdf | 10 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: CIRCULAR 29.pdf | 10 Feb 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf | 10 Feb 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A - Seperate Bank Account Details.pdf | 10 Feb 2024 |
| Declaration about Commencement CertificateFile: Format D Saichaitanya.pdf | 9 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2 A 2021-22 Saichaitanya.pdf | 9 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 A 2022-23 Saichaitanya.pdf | 9 Feb 2024 |
| Layout approvalFile: Layout_compressed.pdf | 31 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: Layout_compressed.pdf | 31 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: cc.pdf | 31 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Saichatanya as on 31st Dec 2021.pdf | 1 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Saichatanya as on March 2022.pdf | 1 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Saichatanya as on June 2022.pdf | 1 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Saichatanya as on Sept 2022.pdf | 1 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Saichatanya as on Dec 2022.pdf | 1 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Saichatanya as on March 2023.pdf | 1 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Saichatanya as on June 2023.pdf | 1 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Saichatanya as on 31st Dec 2021.pdf | 1 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Saichatanya as on 31st Mar 2022.pdf | 1 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Saichaitanya as on 30th June 2022.pdf | 1 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Saichatanya as on 30th Sept 2022.pdf | 1 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Saichatanya as on 31st Dec 2022.pdf | 1 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Saichatanya as on 31st Mar 2023.pdf | 1 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Saichatanya as on 30th June 2023.pdf | 1 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 of Saichaitanya (Bhosale Cardinal) for FY 22-23.pdf | 1 Dec 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 96 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Saichaitanya on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PUSHPAK NEW5,900+ in Raigarh
Filed coordinates, straight-line distance. 217 registered projects within 2 km.
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: BHOSALE BUILDCON
BHOSALE BUILDCON has 3 registrations on MahaRERA, including BHOSALE BLUESTAR and BHOSALE PALASH. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if Saichaitanya is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Saichaitanya?
The registered promoter entity is BHOSALE BUILDCON, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Saichaitanya?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Saichaitanya?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Saichaitanya?
The professionals named in the filing: Architect: VASTUYOG ARCHITECT; Engineer: SK Consultants & Engineers; Chartered Accountant: Nusrat Sayed; Chartered Accountant: Pranav Bhaskaran & Associates; Chartered Accountant: Vallabh Vijay Joshi & co.; Chartered Accountant: Gaurav S Rajpal & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Saichaitanya?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback