Home / Browse projects / Raigarh, Maharashtra / SAI VISHWA RESIDENCY

Registered No litigation declared Others project

SAI VISHWA RESIDENCY

By WALMIK RAGHUNATH KHAIRNAR

RG-MH-29896 · RERA P52000029617 · Last updated on MahaRERA portal: 4 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 36 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 36 months from the original
8 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 90%
53 of 69Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 118 documents Report an error

SAI VISHWA RESIDENCY is a Others project by WALMIK RAGHUNATH KHAIRNAR in Raigarh, Maharashtra, registered with MahaRERA as P52000029617 on 14 Jun 2021. Possession is promised by 31 Dec 2026. The completion date has moved by 36 months from the original filing. 16 of the 69 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameSAI VISHWA RESIDENCY
  • TypeOthers
  • Location
    • PLOT NO 6
    • SEC 24
    • PHASE 2
    • Navade
    • Panvel
    • Raigarh
    • 410208
  • Pincode410208
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000029617
  • ReraGenie IDRG-MH-29896

Builder

  • NameWALMIK RAGHUNATH KHAIRNAR
  • Entity typeIndividual
  • Other registrations8 more →
  • Completed3 of 9
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects10 →

Key dates

this monthRegisteredJun 2021First promiseDec 2023Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Jun 2021
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2023)
  • Buildings1 building record
  • Documents filed118 files

Current status

23%16 of 69 units booked
51.6%Work done, per cost certificate

Figures as on 4 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAI VISHWA RESIDENCYNA8863669

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 4 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.

SAI VISHWA RESIDENCY: 85% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 4 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed48

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots48
Closed/Covered48

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area950 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Jan 2026

Approvals and building plan

Sanctioning authorityCIDCO (City and Industrial Development Corporation of Maharashtra)
Permissible FSI1424.8
Proposed, not sanctioned1,425 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCBD BELAPUR
Estimated costRs 6.40 cr
Cost incurredRs 3.31 cr
Work done51.64%
BuildingWingEstimatedIncurred
SAI VISHWA RESIDENCYNARs 6.20 crRs 3.31 cr
-NARs 20.00 lakh-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Architect07 Associates
EngineerStrucon consulting engineers
EngineerPavan Joshi
Chartered AccountantAnjali Ithkulla
Chartered AccountantJB Patel & Associates
Chartered AccountantRSL & CO
PartnerRole in project
WALMIK RAGHUNATH KHAIRNAR-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000018144Dec 2023 → Dec 2024

Reason as filed by the promoterReason- The project was delayed for reasons beyond our control on account of various unforeseen events.

EXT52000025490Dec 2023 → Dec 2025

Reason as filed by the promoter• Acquisition of Additional FSI and Allottee Consent: In 2023, we successfully acquired additional FSI (Floor Space Index) to enhance the scope and design of the project. This required us to revise certain plans and obtain formal consent from the allottees. The process of securing their approval and completing the necessary formalities took longer than initially anticipated, which has contributed to a delay in the overall project timeline. As part of this, we will be submitting a change application for approval in line with the updated project plans. • Labor and Resource Shortages: Additionall

EA06012619298Dec 2023 → Dec 2026

Reason as filed by the promoterThe project is at an advanced and final stage of construction; however, certain finishing, fit-out, and statutory compliance works remain pending, primarily relating to internal finishes, services installation, testing and commissioning, and obtaining requisite approvals. The delay in completing these works arose due to unavoidable financial constraints caused by prolonged statutory approvals, adverse market conditions, escalation in material and labour costs, and increased holding and overhead expenses, all of which were beyond the Promoter’s control and not due to any negligence. Despite the

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Jun 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Feb 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Dec 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed118

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 118 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Architect Certificate.pdf4 Jun 2026
Withdrawal Update Form 2File: Form 2 (1).pdf4 Jun 2026
Withdrawal Update Form 3File: Sai Vishwa Resaidency_Q4 new COMPRESSED.pdf4 Jun 2026
Withdrawal Update Form 1File: form 1 dec 2025.pdf3 Feb 2026
Withdrawal Update Form 2File: SAI VISHWA - Q3 - FORM 2 (with date).pdf3 Feb 2026
Withdrawal Update Form 3File: FORM 3 SAI VISHWA RESIDENCY (1) Sign.pdf3 Feb 2026
Form 2A (FY 2024-2025)File: Form 2A 24-25 mm.pdf3 Feb 2026
Withdrawal Update Form 1File: Form 1 - June 25.pdf5 Jan 2026
Withdrawal Update Form 1File: Form 1 - June 25.pdf5 Jan 2026
Withdrawal Update Form 2File: Form 2 - June 25.pdf5 Jan 2026
Withdrawal Update Form 2File: FORM 2.pdf5 Jan 2026
Withdrawal Update Form 3File: Sai Vishwa_Form-3_30-09-2025 SIGNED.pdf5 Jan 2026
Withdrawal Update Form 3File: Sai Vishwa_Form-3_30-09-2025 SIGNED.pdf5 Jan 2026
Form 5 (FY 2024-2025)File: Form 5_Sai Vishwa_FY 2024-25.pdf24 Nov 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A.pdf14 Jun 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B.pdf14 Jun 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B (2).pdf14 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf24 Apr 2025
Declaration in FORM BFile: 6 (8).pdf7 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf12 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - DEC 24.pdf12 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 ENGINEER'S CERTIFICATE 12-9-23.pdf12 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_compressed.pdf12 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate.pdf12 Feb 2025
Layout approvalFile: Plan.pdf11 Feb 2025
Copy of Layout Approval (in case of layout)File: Plan.pdf11 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - DEC 24.pdf8 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf28 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2022.pdf15 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3(Signed by Manish Sir)_.pdf15 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2021.pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 24.pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-3 of Sai Vishwa for June 2024(Signed)_compressed.pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 March 2024_compressed.pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Dec-2022_compressed.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Dec-2021_compressed.pdf13 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: sai vishwaaaaaaaaaaaa.pdf9 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organization.pdf9 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_compressed (1).pdf31 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Flat.pdf31 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2 A (1).pdf28 Dec 2024
Building plan approvalFile: Latest Plan.pdf26 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: Latest CC.pdf26 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Latest Plan.pdf26 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Signed.pdf11 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 of Sai Vishwa for June 2024(Signed)_compressed.pdf11 Dec 2024
Details of encumbrances concerned to FinanceFile: Encumbrances to Finance.pdf10 Dec 2024
Details of encumbrances concerned to FinanceFile: Encumbrances to Legal.pdf10 Dec 2024
Declaration in FORM BFile: Form B Declaration.pdf10 Dec 2024
Declaration about Commencement CertificateFile: Declaration About CC.pdf10 Dec 2024
CERSAI detailsFile: CERSAI.pdf10 Dec 2024
Deviation Report with respect to Allotment letterFile: No Deviation From Model Allotment Letter.pdf10 Dec 2024
Details of encumbrances concerned to LegalFile: Encumbrances to Legal.pdf10 Dec 2024
Details of encumbrances concerned to LegalFile: Encumbrances to Finance.pdf10 Dec 2024
Deviation Report with respect to model copy of AgreementFile: No Deviation From Agreement For Sale.pdf10 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organization.pdf10 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Signed Sep 2024.pdf10 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: cc new.pdf5 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf17 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE SOLD UNSOLD.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf23 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGENEER CERTIFICATE.pdf23 Jul 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE SOLD UNSOLD SAI VISHWA.pdf23 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Declaration- Sai Vishwa.pdf12 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Certificate248907 Sai Vishwa Residency.pdf11 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf11 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A.pdf11 Apr 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE.pdf11 Apr 2024
Building plan approvalFile: 3 Building Plan Approval _ NA Order for plotted development.pdf21 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 3 Building Plan Approval _ NA Order for plotted development.pdf21 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: 3 Commencement Certificates _ NA Order for plotted development.pdf21 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 2023.pdf21 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 2021.pdf21 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 2022.pdf21 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2023.pdf21 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf25 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf25 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure Sold unsold.pdf25 Jan 2024

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SAI CHARANPLOT NO 149 SECTOR 23E ULWE NAVI MUMBAI15CompletedJul 2017Jul 2017
SAI DATTAPLOT NO 10 NAWADE NAVI MUMBAI28CompletedJul 2017Jul 2017

How this compares with Raigarh

23%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 36 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAI VISHWA RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PHASE 25,900+ in Raigarh

2 kmSAI VISHWA RESIDENCYCompleted 27Lapsed / revoked 6Other 28Dot size: filed unitsN

Filed coordinates, straight-line distance. 61 registered projects within 2 km.

Builder: WALMIK RAGHUNATH KHAIRNAR

WALMIK RAGHUNATH KHAIRNAR has 9 registrations on MahaRERA, including SAI ANGAN and ASTER. Its filings disclose 10 earlier MahaRERA projects: declares 4 of 6 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if SAI VISHWA RESIDENCY is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAI VISHWA RESIDENCY?

The registered promoter entity is WALMIK RAGHUNATH KHAIRNAR, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAI VISHWA RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAI VISHWA RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAI VISHWA RESIDENCY?

The professionals named in the filing: Architect: 07 Associates; Engineer: Strucon consulting engineers; Engineer: Pavan Joshi; Chartered Accountant: Anjali Ithkulla; Chartered Accountant: JB Patel & Associates; Chartered Accountant: RSL & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAI VISHWA RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAI VISHWA RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAI VISHWA RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.