RG-MH-87928 · RERA P51800046083 · Last updated on MahaRERA portal: 28 Jan 2026

Source: official MahaRERA filing

Red flags

  • Possession 1 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken
  • Rs 10.00 crore secured on the land, in favour of AU Small Finance Bank Limited

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Sep 2026Possession promised1 month past this date
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 10%
0Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

Sai Signature Spaces is a Commercial project by RAMACHANDRAN MUNISAWMY NARAYAN in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800046083 on 20 Jun 2022. Possession was promised by 30 Sep 2026 and is now 1 months past that date. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameSai Signature Spaces
  • TypeCommercial
  • Location
    • Roshan Nagar
    • Borivali West
    • Borivali
    • Mumbai Suburban
    • 400092
  • Pincode400092
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800046083
  • ReraGenie IDRG-MH-87928

Builder

  • NameRAMACHANDRAN MUNISAWMY NARAYAN
  • Entity typeIndividual

Key dates

1 months past promisethis monthRegisteredJun 2022First promiseSep 2025Revised toSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Jun 2022
  • Promised completion30 Sep 2026
  • Revised completionRevised to 30 Sep 2026 (originally 30 Sep 2025)
  • Buildings1 building record
  • Documents filed75 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sai Signature SpacesNA110000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 28 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 10%.

Sai Signature Spaces: 29% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities16

As on 28 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
Terrace GardenYes0%

Parking filed31

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots31
Closed/Covered30
Open Space1

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area471 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofAU Small Finance Bank Limited
Secured amountRs 10.00 crore
CERSAI search filedYes
Declared on21 Sep 2024

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI1907.55
Proposed, not sanctioned1,908 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNew CTS No 637 A Shivalaya Chanda Varkar Road Borivali Mumbai

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYOMESH NARAYAN RAO
EngineerPragnesh Oza
EngineerSalil V Pitkar
Chartered AccountantAgrawal Amit K and company
Chartered AccountantNYVYas&co
Chartered AccountantVASANI AND COMPANY
PartnerRole in project
RAMACHANDRAN MUNISAWMY NARAYAN-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800027804Sep 2025 → Sep 2026

Reason as filed by the promoterThe Ready Mix Concrete (RMC) supplier provided materials of substandard quality, which necessitated breaking and reworking the Plain Cement Concrete (PCC) components. This unfortunate situation led to a significant delay in the project timeline and to maintain our high quality standard had to arrange for new, higher-quality materials to continue with the work. Furthermore, the previously appointed Project Management Consultant (PMC) was unable to meet the project deadlines and effectively manage the scope of work. As a result, a new PMC has been appointed, contributing further to the delay.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Jun 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Jun 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Jun 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FORM 1 31122025 .pdf28 Jan 2026
Form 2File: FORM 2 31122025.pdf28 Jan 2026
Form 3File: FORM 3 31122025.pdf28 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold-Booked Inventory 31122025.pdf28 Jan 2026
OthersFile: FORM 2A 31122025.pdf28 Jan 2026
Form 1File: FORM 1 30092025.pdf1 Nov 2025
Form 2File: FORM 2 30092025.pdf1 Nov 2025
Form 3File: FORM 3 NEW 30092025.pdf1 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold-Booked Inventory 30092025.pdf1 Nov 2025
OthersFile: Form 2A 30092025.pdf1 Nov 2025
Form 5 (FY 2024-2025)File: FORM 5 31032025.pdf30 Sep 2025
Form 1File: FORM 1 31032025.pdf26 Jul 2025
Form 3File: FORM 3 NEW 31032025.pdf26 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold-Booked Inventory 310325.pdf26 Jul 2025
OthersFile: Form 2A.pdf26 Jul 2025
Form 2File: Form 2 31032025.pdf26 Jul 2025
Form 1File: FORM 1 30062025.pdf26 Jul 2025
Form 2File: Form 2 30062025.pdf26 Jul 2025
Form 3File: FORM 3 NEW 30062025.pdf26 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold-Booked Inventory 300625.pdf26 Jul 2025
OthersFile: Form 2A 300625.pdf26 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer's Certificate - Compressed.pdf18 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1(Architect Certificate) as on 30092024.pdf19 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 30-12-2024.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sai Signature Spaces_ form 3 as on 30092024 (2).pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 as on 31122024_Sai Signaure Spaces.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 (Engineer Certificate) as on 30092024.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer's Certificate.pdf19 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 30-12-2024.pdf5 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 as on 31122024_Sai Signaure Spaces_11zon.pdf5 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer's Certificate.pdf5 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory 30092024.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold signed.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1(Architect Certificate) as on 30092024.pdf22 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Signed copy.pdf17 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: RERA CERTIFICATE-SSS form 2A (1).pdf7 Aug 2024
Disclosure of sold/ booked inventoryFile: Disc of sold unsold as on 30062024 Sai Signature Spaces.pdf30 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Self Declaration 24Apr24.pdf24 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Self Declaration 24Apr24.pdf24 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Self Declaration 24Apr24.pdf24 Apr 2024
Disclosure of sold/ booked inventoryFile: Quarterly Update Q4_FY 23-24_Sai Signature Space_ Disclosure for Sold unsold units.pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NR Self Declaration.pdf3 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NR Self Declaration.pdf3 Feb 2024
Disclosure of sold/ booked inventoryFile: NR Disclosure of sold and Booked Inventory.pdf3 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NR Self Declaration.pdf3 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold_as on 30092023.pdf20 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: SSS- Form 2A.pdf27 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Sai Signature Spaces- Form 5 FY 22-23 Signed_final.pdf17 Oct 2023
Details of encumbrancesFile: Encumbrance - SSS.pdf4 Sep 2023
Disclosure of sold/ booked inventoryFile: Sold Booked Inventory as on 300623.pdf21 Aug 2023
Other - FinanceFile: NR-Encumbrance on project - Finance.pdf16 Aug 2023
Proforma of Agreement for saleFile: Draft of Final AFS.pdf14 Jul 2023
Deviation Report with respect to model copy of AgreementFile: Deviation report of Final AFS.pdf14 Jul 2023
CERSAI detailsFile: CERSAI Search Report.pdf29 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Sai Signature Spaces.pdf29 Jun 2023
Disclosure of sold/ booked inventoryFile: Sold-Booked Inventory as on 31032023.pdf30 May 2023
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf5 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA FORM NO 3 SIGNED final (2).pdf17 Jun 2022
Proforma of Allotment letterFile: Allotment letter Final.pdf17 Jun 2022
Proforma of Allotment letterFile: AFSSai Signatur Space Final.pdf17 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Signed Stamped compressed.pdf14 Jun 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Signed Stamped compressed.pdf14 Jun 2022
Layout approvalFile: IOD AMENDED Plan COMPRESSED.pdf13 Jun 2022
Copy of Layout Approval (in case of layout)File: IOD AMENDED Plan COMPRESSED.pdf13 Jun 2022
CERSAI detailsFile: CERSAI Search Report For Asset_Based_Search.pdf13 Jun 2022
Building plan approvalFile: 2308501Amend letter signed.pdf11 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: 2308501Amend letter signed.pdf11 Jun 2022
Declaration in FORM BFile: AffidavitForm Bcompressed.pdf11 Jun 2022
Disclosure of sold/ booked inventoryFile: Disclosure sold unsold inventory.pdf11 Jun 2022
CERSAI detailsFile: Undertaking in relation to cersai.pdf11 Jun 2022
PAN CardFile: PAN CARD PDF.pdf10 Jun 2022
Copy of the legal title reportFile: Title Certificate Ramachandran Narayan.pdf10 Jun 2022
Details of encumbrancesFile: Declerationfor encumberence.pdf10 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: 2326123FirstCCsigned.pdf10 Jun 2022
Declaration about Commencement CertificateFile: FormatDDeclaration about cc.pdf10 Jun 2022

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 12 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sai Signature Spaces on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Borivali West6,700+ in Mumbai Suburban

2 kmSai Signature SpacesCompleted 164Lapsed / revoked 94Other 222Dot size: filed unitsN

Filed coordinates, straight-line distance. 480 registered projects within 2 km.

Builder: RAMACHANDRAN MUNISAWMY NARAYAN

RAMACHANDRAN MUNISAWMY NARAYAN has 1 registration on MahaRERA, including Sai Signature Spaces. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Sai Signature Spaces is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sai Signature Spaces?

The registered promoter entity is RAMACHANDRAN MUNISAWMY NARAYAN, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sai Signature Spaces?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sai Signature Spaces?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sai Signature Spaces?

The professionals named in the filing: Architect: YOMESH NARAYAN RAO; Engineer: Pragnesh Oza; Engineer: Salil V Pitkar; Chartered Accountant: Agrawal Amit K and company; Chartered Accountant: NYVYas&co; Chartered Accountant: VASANI AND COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sai Signature Spaces?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sai Signature Spaces. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sai Signature Spaces to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.