ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / Sai Siddhi Purushottam

Completed No litigation declared Residential / Group Housing project

Sai Siddhi Purushottam

By Manohar Janu Mhatre

RG-MH-62630 · RERA P52000048274 · Last updated on MahaRERA portal: 17 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Basement (if any), 0%
12 of 28Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 84 documents Report an error

Sai Siddhi Purushottam is a Residential / Group Housing project by Manohar Janu Mhatre in Raigarh, Maharashtra, registered with MahaRERA as P52000048274 on 22 Dec 2022. The registration is recorded completed; possession was promised by 31 Dec 2026. The completion date has moved by 24 months from the original filing. 16 of the 28 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameSai Siddhi Purushottam
  • TypeResidential / Group Housing
  • Location
    • 52 Bungalow
    • Old Panvel
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000048274
  • ReraGenie IDRG-MH-62630

Builder

  • NameManohar Janu Mhatre
  • Entity typeIndividual
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredDec 2022First promiseDec 2024Revised toDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on22 Dec 2022
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2024)
  • Buildings1 building record
  • Documents filed84 files

Current status

57%16 of 28 units booked
73.9%Work done, per cost certificate

Figures as on 17 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sai Siddhi PurushottamNA8728028

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

Sai Siddhi Purushottam: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 17 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed24

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots24
Closed/Covered18
Open Space6

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area499 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Shree Purushottam Co Operative Hsg Soc LtdPanvelRaigarh

Approvals and building plan

Sanctioning authorityPanvel Municipal Corporation
Permissible FSI1590.16
Proposed, not sanctioned1,492 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKhanda Colony New Panvel West Maharashtra 410206
Estimated costRs 5.35 cr
Cost incurredRs 3.95 cr
Work done73.89%
BuildingWingEstimatedIncurred
Sai Siddhi PurushottamNARs 5.08 crRs 3.89 cr
-NARs 26.74 lakhRs 6.69 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectEntity Architects
EngineerSK Consultants & Engineers
Chartered AccountantRutuja Narsingh & Associates
Chartered AccountantNB Sayed & Associates
PartnerRole in project
Manohar Janu Mhatre-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000027721Dec 2024 → Dec 2025

Reason as filed by the promoterWe apologize for the delay in the completion of the project and the submission of this request. The delay has occurred due to issues with procurement, unforeseen site conditions, coordination challenges and temporary financial constraints. Despite these setbacks, we are working diligently to address these issues and complete the remaining work. We are closely monitoring progress and taking all necessary steps to ensure timely completion. Given the circumstances, we kindly request an extension until 31-12-2025 to complete the project and fulfil all regulatory requirements.

EA30122519149Dec 2024 → Dec 2026

Reason as filed by the promoterWe request an extension of the project as approximately 90% of the construction work has been completed, and the remaining work is in progress. Also, we are in process to obtain full OC. The delay is due to unavoidable factors such as final finishing activities, installation of services, and coordination with external agencies for utilities. These activities require additional time to ensure quality, safety, and compliance with approved plans. We seek a short extension to complete the balance work and hand over the project responsibly to the allottees.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Nov 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed84

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A_FY_2022-23.pdf17 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A_FY_2022-23.pdf17 Jul 2026
Occupational CertificateFile: OC.pdf17 Jul 2026
Occupational CertificateFile: OC Plan.pdf17 Jul 2026
Occupational CertificateFile: OC Verification Mail Screenshot.pdf17 Jul 2026
Occupational CertificateFile: CC.pdf17 Jul 2026
Occupational CertificateFile: CC Plan.pdf17 Jul 2026
Withdrawal Update Form 1File: Form 1 - Sai Siddhi Purushottam as on June 2026.pdf13 Jul 2026
Withdrawal Update Form 2File: Form 2 - Sai Siddhi Purushottam as on June 2026.pdf13 Jul 2026
Withdrawal Update Form 3File: Form 3 - Sai Siddhi Purushottam as on June 2026.pdf13 Jul 2026
Withdrawal Update Form 1File: Form 1 - Sai Siddhi Purushottam as on March 2026.pdf20 Jun 2026
Withdrawal Update Form 2File: Form 2 - Sai Siddhi Purushottam as on March 2026.pdf20 Jun 2026
Withdrawal Update Form 3File: Form 3 - Sai Siddhi Purushottam as on March 2026.pdf20 Jun 2026
Withdrawal Update Form 1File: Sai Siddhi Pursottham FORM 1 Decembe 2025.pdf12 Jun 2026
Withdrawal Update Form 2File: Form 2 - Sai Siddhi purshottam as on Dec 2025.pdf12 Jun 2026
Withdrawal Update Form 3File: Form 3 - Sai Siddhi purshottam as on Dec 2025.pdf12 Jun 2026
Withdrawal Update Form 1File: Form 1 - Sai Siddhi purshottam as on June 2025.pdf30 Dec 2025
Withdrawal Update Form 1File: Form 1 - Sai Siddhi Purshottam as on Sep 2025.pdf30 Dec 2025
Withdrawal Update Form 2File: Form 2 - Sai Siddhi purshottam as on June 2025.pdf30 Dec 2025
Withdrawal Update Form 2File: Form 2 - Sai Siddhi purshottam as on Sep 2025.pdf30 Dec 2025
Withdrawal Update Form 3File: Form 3 - Sai Siddhi purshottam as on June 2025.pdf30 Dec 2025
Withdrawal Update Form 3File: Form 3 - Sai Siddhi purshottam as on Sep 2025.pdf30 Dec 2025
Form 5 (FY 2024-2025)File: Form 5 of Sai Siddhi purshottam FY 2024-25.pdf30 Dec 2025
Declaration in FORM BFile: Form B-Sai Siddhi Purshottam.pdf22 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 2025 - Sai Siddhi Purshottam.pdf22 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 - 31-12-2024.pdf22 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Foem3 - 31-12-2024.pdf22 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- 31.pdf22 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 - 31-12-2024.pdf22 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 - 31-12-2024.pdf22 Apr 2025
Disclosure of sold/ booked inventoryFile: Circular 29.pdf22 Apr 2025
Other - TechnicalFile: Pert chart.pdf22 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf22 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A -22-23.pdf22 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf22 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf22 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A-23-24.pdf22 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24.pdf22 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sai Siddhi Purushottam as on 30-06-2024.pdf12 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sai Siddhi Purushottam as on 30-09-2024.pdf12 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sai Siddhi Purushottam as on 31-12-2024.pdf12 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sai Siddhi Purushottam as on June 2024.pdf12 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sai Siddhi Purushottam as on Sep 2024.pdf12 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sai Siddhi Purushottam as on Dec 2024.pdf12 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 7 CA Certificate on Project Cost Fund withdrawal (Form 3).pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf19 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 of Sai Siddhi purshottam FY 2023-24.pdf13 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf16 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf16 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6 CA Certificate on Project Cost Fund withdrawal (Form 3).pdf16 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sai Siddhi Purushottam as on Sept 2023.pdf20 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sai Siddhi Purushottam as on Dec 2023.pdf20 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sai Siddhi Purushottam as on March 2024.pdf20 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sai Siddhi Purushottam as on Sep 2023.pdf20 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sai Siddhi Purushottam as on Dec 2023.pdf20 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sai Siddhi Purushottam as on March 2024.pdf20 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sai Siddhi Purushottam as on March 2023.pdf5 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sai Siddhi Purushottam as on June 2023.pdf5 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: New Format Form 3 - Sai Siddhi Purushottam as on 31-03-2023.pdf5 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sai Siddhi Purushottam as on June 2023.pdf5 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sai Siddhi Purushottam as on Sep 2023.pdf18 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5- Sai Siddhi Purshottam as on 2022-23.pdf30 Sep 2023
Declaration in FORM BFile: Promoter form B -Notarized.pdf13 Dec 2022
Other - TechnicalFile: Landowner Form B -Notarized.pdf13 Dec 2022
Declaration about Commencement CertificateFile: Scan2022-11-29_104931.pdf29 Nov 2022
CERSAI detailsFile: CERSAI_Search_Report_200253407202_For_Asset_Based_Search_29_11_2022_12_06_44_873.pdf29 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: organized (38).pdf29 Nov 2022
Proforma of Allotment letterFile: Allotment Letter_Manohar Mhatre_Sai Siddhi Purushottam_26112022.pdf29 Nov 2022
Proforma of Agreement for saleFile: AFS_MANOHAR MHATRE_SAI SIDDHI PURUSHOTTAM_25112022.pdf29 Nov 2022
Layout approvalFile: Page 1.pdf26 Nov 2022
Building plan approvalFile: Page 2_Page 3_merged_compressed.pdf26 Nov 2022
PAN CardFile: KYC- Manohar Janu Mhatre Pancard.pdf26 Nov 2022
Copy of the legal title reportFile: TITLE_compressed.pdf26 Nov 2022
Details of encumbrances concerned to FinanceFile: Encumbrance Dues -Sai Siddhi Purshotam.pdf26 Nov 2022
Details of encumbrances concerned to FinanceFile: Encumbrance Legal -Sai Siddhi Purshotam.pdf26 Nov 2022
Details of encumbrances concerned to LegalFile: Encumbrance Dues -Sai Siddhi Purshotam.pdf26 Nov 2022
Details of encumbrances concerned to LegalFile: Encumbrance Legal -Sai Siddhi Purshotam.pdf26 Nov 2022
Copy of Layout Approval (in case of layout)File: Page 1.pdf26 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: Page 2_Page 3_merged_compressed.pdf26 Nov 2022

How this compares with Raigarh

57%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 24 months
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sai Siddhi Purushottam on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Old Panvel5,900+ in Raigarh

2 kmSai Siddhi PurushottamCompleted 187Lapsed / revoked 64Other 140Dot size: filed unitsN

Filed coordinates, straight-line distance. 391 registered projects within 2 km.

Builder: Manohar Janu Mhatre

Manohar Janu Mhatre has 2 registrations on MahaRERA, including Sai Siddhi Purushottam and SAI SIDDHI MADHUBAN. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Sai Siddhi Purushottam is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sai Siddhi Purushottam?

The registered promoter entity is Manohar Janu Mhatre, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sai Siddhi Purushottam?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sai Siddhi Purushottam?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sai Siddhi Purushottam?

The professionals named in the filing: Architect: Entity Architects; Engineer: SK Consultants & Engineers; Chartered Accountant: Rutuja Narsingh & Associates; Chartered Accountant: NB Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sai Siddhi Purushottam?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sai Siddhi Purushottam. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sai Siddhi Purushottam to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.