Home / Browse projects / Aurangabad, Maharashtra / SAI SHRADDHA RESIDENCY
SAI SHRADDHA RESIDENCY
By SHRI SAI BUILDERS AND DEVELOPERS
RG-MH-03695 · RERA P51500046576 · Last updated on MahaRERA portal: 31 Dec 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 8 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SAI SHRADDHA RESIDENCY is a Residential / Group Housing project by SHRI SAI BUILDERS AND DEVELOPERS in Aurangabad, Maharashtra, registered with MahaRERA as P51500046576 on 19 Aug 2022. The registration is recorded completed; possession was promised by 31 Dec 2025. 11 of the 12 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.
At a glance
Project
- NameSAI SHRADDHA RESIDENCY
- TypeResidential / Group Housing
- Location
- PLOT NO 15 GUT NO 32/2/PART
- BRIJWADI
- Aurangabad (M Corp.)
- Aurangabad
- 431007
- Pincode431007
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51500046576
- ReraGenie IDRG-MH-03695
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on19 Aug 2022
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings1 building record
- Documents filed100 files
Current status
Figures as on 31 Dec 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SAI SHRADDHA RESIDENCY | NA | 7 | 7 | 12 | 0 | 12 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 31 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 80%.
SAI SHRADDHA RESIDENCY: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
Progress on shared amenities15
As on 31 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed24
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SAI SHRADDHA RESIDENCY | NA | Rs 1.30 cr | Rs 1.24 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AMRISH JOSHI |
| Engineer | PRAMOD MOTE |
| Engineer | TADEEBUDDIN TAUFIQUDDIN SIDDIQUI |
| Chartered Accountant | KEDAR JOSHI |
| Chartered Accountant | FAIZAN KHAN |
| Partner | Role in project |
|---|---|
| SHRI SAI BUILDERS AND DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 5 Jul 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 5 Jul 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 Aug 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 22 Jul 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed100
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 100 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: Sai Shraddha - Occupancy Certificate.pdf | 31 Dec 2025 |
| Form 2File: Form 2 2022-23 QPR 2 SS.pdf | 30 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: sold QPR 2 30-09-2022.pdf | 30 Dec 2025 |
| Form 3File: Form 3 QPR 2 2022-23.pdf | 30 Dec 2025 |
| Form 1File: Form 1 QPR 2 2022-23 SS.pdf | 30 Dec 2025 |
| Form 3File: Form 3 QPR 3 2022-23.pdf | 30 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: sold QPR 3 31-12-2022.pdf | 30 Dec 2025 |
| Form 1File: Form 1 QPR 3 2022-23 SS.pdf | 30 Dec 2025 |
| Form 2File: Form 2 QPR 3 2022-22 SS.pdf | 30 Dec 2025 |
| Form 3File: Form 3 QPR 4 2022-23.pdf | 30 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: sold QPR 4 31-03-2023.pdf | 30 Dec 2025 |
| Form 1File: Form 1 QPR 4 2022-23 SS.pdf | 30 Dec 2025 |
| Form 2File: Form 2 QPR 4 2022-23 SS.pdf | 30 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold QPR 1 30-06-2023.pdf | 30 Dec 2025 |
| Form 3File: Form 3 QPR 1 2023-24.pdf | 30 Dec 2025 |
| Form 1File: Form 1 QPR 1 2023-24 SS.pdf | 30 Dec 2025 |
| Form 2File: Form 2 QPR 1 2023-24 SS.pdf | 30 Dec 2025 |
| Form 1File: Form 1 QPR 2 2023-24 SS.pdf | 30 Dec 2025 |
| Form 2File: Form 2 QPR 2 2023-24 SS.pdf | 30 Dec 2025 |
| Form 3File: Form 3 QPR 2 2023-24.pdf | 30 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold QPR 2 30-09-2023.pdf | 30 Dec 2025 |
| Form 3File: Form 3 QPR 3 2023-24.pdf | 30 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold QPR 3 31-12-2023.pdf | 30 Dec 2025 |
| Form 1File: Form 1 QPR 3 2023-24 SS.pdf | 30 Dec 2025 |
| Form 2File: Form 2 QPR 3 2023-24 SS.pdf | 30 Dec 2025 |
| Form 3File: Form 3 QPR 4 2023-24.pdf | 30 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold QPR 4 31-03-2024.pdf | 30 Dec 2025 |
| Form 1File: Form 1 QPR 4 2023-24 SS.pdf | 30 Dec 2025 |
| Form 2File: Form 2 QPR 4 2023-24 SS.pdf | 30 Dec 2025 |
| Form 3File: Form 3 QPR 1 2024-25.pdf | 30 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold QPR 1 30-06-2024.pdf | 30 Dec 2025 |
| Form 1File: Form 1 QPR 1 2024-25.pdf | 30 Dec 2025 |
| Form 2File: Form 2 QPR 1 2024-25.pdf | 30 Dec 2025 |
| Form 1File: Form 1 QPR 2 2024-25 SS.pdf | 30 Dec 2025 |
| Form 2File: Form 2 QPR 2 2024-25 SS.pdf | 30 Dec 2025 |
| Form 3File: Form 3 QPR 2 2024-25.pdf | 30 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold QPR 2 30-09-2024.pdf | 30 Dec 2025 |
| Form 3File: Form 3 QPR 3 2024-25.pdf | 30 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold QPR 3 31-12-2024.pdf | 30 Dec 2025 |
| Form 1File: Form 1 QPR 3 2024-2025.pdf | 30 Dec 2025 |
| Form 2File: Form 2 QPR 3 2024-25 SS.pdf | 30 Dec 2025 |
| Form 1File: Form 1 QPR 4 2024-25 SS.pdf | 30 Dec 2025 |
| Form 2File: Form 2 QPR 4 2024-25 SS.pdf | 30 Dec 2025 |
| Form 3File: Form 3 QPR 4 2024-25.pdf | 30 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold QPR 4 31-03-2025.pdf | 30 Dec 2025 |
| Withdrawal Update Form 1File: Form 1 QPR 4 2024-25 SS.pdf | 30 Dec 2025 |
| Withdrawal Update Form 1File: Form 1 QPR 4 2024-25 SS.pdf | 30 Dec 2025 |
| Withdrawal Update Form 2File: Form 2 QPR 4 2024-25 SS.pdf | 30 Dec 2025 |
| Withdrawal Update Form 2File: Form 2 QPR 4 2024-25 SS.pdf | 30 Dec 2025 |
| Withdrawal Update Form 3File: Form 3 QPR 4 2024-25.pdf | 30 Dec 2025 |
| Withdrawal Update Form 3File: Form 3 QPR 4 2024-25.pdf | 30 Dec 2025 |
| Form 2A (FY 2022-2023)File: Form 2-A Sai Builders and Developers 2022-23.pdf | 30 Dec 2025 |
| Form 2A (FY 2023-2024)File: Form 2-A Sai builders and Developers 2023-24.pdf | 30 Dec 2025 |
| Form 2A (FY 2024-2025)File: Form 2-A Sai Builders and Developers 2024-25.pdf | 30 Dec 2025 |
| Form 2A (FY 2025-2026)File: Form 2-A Sai Builders and Developers 2025-26.pdf | 30 Dec 2025 |
| Form 5 (FY 2022-2023)File: Adobe Scan 30 Dec 2025.pdf | 23 Dec 2025 |
| Form 5 (FY 2023-2024)File: 23-24.pdf | 23 Dec 2025 |
| Form 5 (FY 2024-2025)File: 24-25.pdf | 23 Dec 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM_1.pdf | 30 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM_2_compressed.pdf | 30 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM2A_21.pdf | 30 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM2A_21.pdf | 30 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM2A_22.pdf | 30 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM2A_23.pdf | 30 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architecture Form-1.pdf | 19 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form no 2.pdf | 19 Jun 2023 |
| Building plan approvalFile: PLAN DIGITALLY SIGN.pdf | 12 Aug 2022 |
| Building plan approvalFile: MORALE FLAT 01.pdf | 12 Aug 2022 |
| Building plan approvalFile: PLAN DIGITALLY SIGN.pdf | 12 Aug 2022 |
| Building plan approvalFile: MORALE FLAT 02.pdf | 12 Aug 2022 |
| Building plan approvalFile: MORALE FLAT 04.pdf | 12 Aug 2022 |
| Building plan approvalFile: MORALE FLAT 05.pdf | 12 Aug 2022 |
| Building plan approvalFile: MORALE FLAT 06.pdf | 12 Aug 2022 |
| Building plan approvalFile: MORALE FLAT 07.pdf | 12 Aug 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN DIGITALLY SIGN.pdf | 12 Aug 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: MORALE FLAT 01.pdf | 12 Aug 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN DIGITALLY SIGN.pdf | 12 Aug 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: MORALE FLAT 02.pdf | 12 Aug 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: MORALE FLAT 04.pdf | 12 Aug 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: MORALE FLAT 05.pdf | 12 Aug 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Aurangabad
Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 8 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 100 filed documents as one ZIP, foldered, with a manifest
Keep SAI SHRADDHA RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BRIJWADI1,400+ in Aurangabad
Filed coordinates, straight-line distance. 24 registered projects within 2 km.
PMAY U Sundarwadi 10
Aurathrone Infra
PMAY U Sundarwadi 9
Aurathrone Infra
SECTOR 41
MANISH RAMNIRANJAN AGRAWAL AND AMITABH CHA
AURA SQUARE - KALYAN HEIGHTS
KALYAN HEIGHTS
URBAN AMBITION
MANISH RAMNIRANJAN AGRAWAL
Hrim Ssky City Phase V
Ashok Baheti
See every Aurangabad project, with the district possession charts
Builder: SHRI SAI BUILDERS AND DEVELOPERS
SHRI SAI BUILDERS AND DEVELOPERS has 9 registrations on MahaRERA, including SHRIEENIDHI ESTATE ISASANI and Saraswati Heights. Its filings disclose 4 earlier MahaRERA projects: declares 1 of 3 past projects completed on time. Read the full track record. See more projects on the Aurangabad district page.
Frequently asked questions
What are my rights if SAI SHRADDHA RESIDENCY is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SAI SHRADDHA RESIDENCY?
The registered promoter entity is SHRI SAI BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SAI SHRADDHA RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SAI SHRADDHA RESIDENCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SAI SHRADDHA RESIDENCY?
The professionals named in the filing: Architect: AMRISH JOSHI; Engineer: PRAMOD MOTE; Engineer: TADEEBUDDIN TAUFIQUDDIN SIDDIQUI; Chartered Accountant: KEDAR JOSHI; Chartered Accountant: FAIZAN KHAN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SAI SHRADDHA RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback