Home / Browse projects / Raigarh, Maharashtra / Sai Shraddha Phase II

Registered No litigation declared Residential / Group Housing project

Sai Shraddha Phase II

By SAI SHRADDHA DEVELOPERS

RG-MH-18106 · RERA P52000056228 · Last updated on MahaRERA portal: 20 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 9 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
4 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 85%
59 of 70Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 52 documents Report an error

Sai Shraddha Phase II is a Residential / Group Housing project by SAI SHRADDHA DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000056228 on 22 May 2024. Possession is promised by 31 Dec 2029. 11 of the 70 units on this registration are recorded sold or booked, and 4 of 33 construction stages are filed complete.

At a glance

Project

  • NameSai Shraddha Phase II
  • TypeResidential / Group Housing
  • Location
    • Roha
    • India
    • Bhuwaneshwar (CT)
    • Raigarh
    • 402109
  • Pincode402109
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000056228
  • ReraGenie IDRG-MH-18106

Builder

  • NameSAI SHRADDHA DEVELOPERS
  • Entity typePartnership
  • PartnersSURESH GHEWARCHAND JAIN, RAJENDRA BASTIMAL JAIN, HITENDRA RAJNIKANT SHAH, ASHISH RAJNIKANT SHAH
  • Other registrations9 more →
  • Completed2 of 10
  • No longer live5 lapsed, de-registered or revoked
  • Declared earlier projects8 →

Key dates

this monthRegisteredMay 2024PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 May 2024
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings3 building records
  • Documents filed52 files

Current status

16%11 of 70 units booked
42.6%Work done, per cost certificate

Figures as on 20 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
H WINGNA33707
I WINGNA7742042
J WINGNA7721021

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 20 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 85%.

H WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
I WING74%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
J WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes75%
Water SupplyYes75%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsYes75%
Landscaping & Tree PlantingYes75%
Street LightingYes75%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes75%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes75%
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed83

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots83
Open Space83
BuildingOpen SpaceTotal
H WING99
I WING4343
J WING3131

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,628 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Jul 2025

Approvals and building plan

Sanctioning authorityRevenue and Forest Department Raigad District
Permissible FSI3991.47
Proposed, not sanctioned3,991 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 1 5, GROUND FLOOR, BRAND COMPLEX, MIDC ROAD, ROHA, RAIGAD 402109
Estimated costRs 8.59 cr
Cost incurredRs 3.66 cr
Work done42.58%
BuildingWingEstimatedIncurred
I WINGNARs 3.62 crRs 3.02 cr
-NARs 2.55 crRs 63.75 lakh
J WINGNARs 1.81 cr-
H WINGNARs 60.40 lakh-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAnjali Damle
EngineerMandar Nadgaundi
EngineerMahesh Chavan
Chartered AccountantY S J & Asssociates
Chartered AccountantSiddharth Anil Ostwal
PartnerRole in project
SAI SHRADDHA DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed52

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Sai S 310326.pdf20 Jun 2026
Withdrawal Update Form 2File: Form 2Sai Shradha31032026 final.pdf20 Jun 2026
Withdrawal Update Form 3File: Sai Shraddha Developers 310326 form 3.pdf20 Jun 2026
Withdrawal Update Form 1File: Sai shraddha Form 1 dec 31.pdf29 Mar 2026
Withdrawal Update Form 2File: Sai Shraddha Form 2.pdf29 Mar 2026
Withdrawal Update Form 3File: Form 3 31st dec Sai Shraddha.pdf29 Mar 2026
Withdrawal Update Form 1File: form1 Sai shraddha.pdf20 Nov 2025
Withdrawal Update Form 2File: Form 2_Sai Shradha (1).pdf20 Nov 2025
Withdrawal Update Form 3File: Withdrawal Application Form3 signed.pdf20 Nov 2025
Form 5 (FY 2024-2025)File: Sai Shraddha Developers Form 5[1].pdf30 Sep 2025
Form 1File: Form 1.pdf19 Jul 2025
Form 2File: Form 2.pdf19 Jul 2025
Form 3File: form 3 final.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory Disclosure.pdf19 Jul 2025
Form 1File: Form 1.pdf16 Jul 2025
Form 2File: Form 2 (1).pdf16 Jul 2025
Form 3File: Form 3 Sept final.pdf16 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold inventory.pdf16 Jul 2025
Form 1File: Form 1 Suresh Jain.pdf16 Jul 2025
Form 2File: Form 2 Signed.pdf16 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold inventory.pdf16 Jul 2025
Form 3File: Form 3 Final.pdf16 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Suresh Jain.pdf27 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Signed.pdf27 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sept final.pdf24 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM - 2 Suresh Jain_30092024 dsc.pdf23 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Anneure A_ Form 1 _ Architect Certificate_ 30_09_2024.pdf18 Dec 2024
Details of encumbrances concerned to FinanceFile: Encumbrances.pdf15 May 2024
Details of encumbrances concerned to LegalFile: Encumbrances.pdf15 May 2024
Other - TechnicalFile: Plot Area Final.pdf11 May 2024
Other - TechnicalFile: Declaration cum undertaking Final.pdf11 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf10 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final Changed.pdf10 Apr 2024
Proforma of Agreement for saleFile: Agreement For Sale .pdf10 Apr 2024
Other - TechnicalFile: Screenshot.pdf10 Apr 2024
Layout approvalFile: Copy of layout Approval_11zon.pdf9 Apr 2024
Building plan approvalFile: NA Order.pdf9 Apr 2024
PAN CardFile: Pan Card (1).pdf9 Apr 2024
Copy of the legal title reportFile: Legal title Report.pdf9 Apr 2024
Copy of Layout Approval (in case of layout)File: Copy of layout Approval_11zon.pdf9 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: NA Order.pdf9 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: NA Order.pdf9 Apr 2024
Declaration in FORM BFile: Form B_compressed.pdf9 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure.pdf9 Apr 2024
Proforma of Allotment letterFile: Proforma of Allotment letter .pdf9 Apr 2024
Details of encumbrances concerned to FinanceFile: Legal Encumbrances final.pdf4 Apr 2024
Details of encumbrances concerned to LegalFile: Legal Encumbrances final.pdf4 Apr 2024
Declaration about Commencement CertificateFile: Declaration of Commencement certificate.pdf4 Apr 2024
CERSAI detailsFile: Cersai.pdf4 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seperate bank Account final.pdf4 Apr 2024
Deviation Report with respect to Allotment letterFile: Proforma Deviation report allotment letter.pdf4 Apr 2024
Deviation Report with respect to model copy of AgreementFile: Proforma Deviation report.pdf4 Apr 2024

How this compares with Raigarh

16%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sai Shraddha Phase II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near India5,900+ in Raigarh

2 kmSai Shraddha Phase IICompleted 21Lapsed / revoked 10Other 17Dot size: filed unitsN

Filed coordinates, straight-line distance. 48 registered projects within 2 km.

Builder: SAI SHRADDHA DEVELOPERS

SAI SHRADDHA DEVELOPERS has 10 registrations on MahaRERA, including SAI SHRADDHA DEVELOPERS and ANUJ RESIDENCY. Its filings disclose 8 earlier MahaRERA projects: declares 7 of 8 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Sai Shraddha Phase II is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sai Shraddha Phase II?

The registered promoter entity is SAI SHRADDHA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sai Shraddha Phase II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sai Shraddha Phase II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sai Shraddha Phase II?

The professionals named in the filing: Architect: Anjali Damle; Engineer: Mandar Nadgaundi; Engineer: Mahesh Chavan; Chartered Accountant: Y S J & Asssociates; Chartered Accountant: Siddharth Anil Ostwal. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sai Shraddha Phase II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sai Shraddha Phase II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sai Shraddha Phase II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.