Home / Browse projects / Palghar, Maharashtra / SAI SAVALI BUILDING A1

Registration lapsed No litigation declared Others project

SAI SAVALI BUILDING A1

By MAYFAIR ENTERPRISES

RG-MH-28586 · RERA P99000026399 · Last updated on MahaRERA portal: 9 Oct 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 24 months past the filed date
  • Completion date moved by 10 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Oct 2024Possession promised24 months past this date
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 55 documents Report an error

SAI SAVALI BUILDING A1 is a Others project by MAYFAIR ENTERPRISES in Palghar, Maharashtra, registered with MahaRERA as P99000026399 on 17 Sep 2020. Possession was promised by 15 Oct 2024 and is now 24 months past that date. The completion date has moved by 10 months from the original filing.

At a glance

Project

  • NameSAI SAVALI BUILDING A1
  • TypeOthers
  • Location
    • SURVEY NO 62 PART 2
    • VILLAGE KHAIRE
    • NEAR BOISAR RAILWAY STATION
    • BOISAR EAST
    • khairepada
    • Palghar
    • 401501
  • Pincode401501
  • RERA no.P99000026399
  • ReraGenie IDRG-MH-28586

Builder

  • NameMAYFAIR ENTERPRISES
  • Entity typePartnership
  • PartnersPERVIN KERSI IRANI, AKSHAY RAVINDRA SANKHE
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked

Key dates

24 months past promisethis monthRegisteredSep 2020First promiseDec 2023Revised toOct 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on17 Sep 2020
  • Promised completion15 Oct 2024
  • Revised completionRevised to 15 Oct 2024 (originally 15 Dec 2023)
  • Buildings1 building record
  • Documents filed55 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAI SAVALI BUILDING A1NA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

SAI SAVALI BUILDING A1: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 9 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed12

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots12
Closed/Covered8
Open Space4

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,000 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
SAIZAD F IRANIBoisarPalghar
ZARTHOST F IRANIBoisarPalghar

Approvals and building plan

Permissible FSI2818.08
Proposed, not sanctioned1,618 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBASSEIN CATHOLIC COOP BANK LTD, CLASSIC CORNER BUILDING, PALGHAR WEST

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectODYSSEY ARCHITECTS AND ASSOCIATES
EngineerAGAMI ENGINEERING
Chartered AccountantSACHIN K KORE
PartnerRole in project
MAYFAIR ENTERPRISES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000018157Dec 2023 → Oct 2024

Reason as filed by the promoterWe have completed construction of our said project SAI SAVALI BUILDING A1 and we have also applied for Occupation Certificate (O.C.) from Collector Office Palghar which is our approval authority on 30.10.2023, but there is delay in getting the O.C. which we are expecting within next 2 months. Thus we are applying for Maha RERA Extension for our said project. Hope you grant the extension at the earliest. Thanking You, Yours Faithfully, For Mayfair Enterprises Mr. Akshay Sankhe

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Sep 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Oct 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Oct 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 6 Oct 2024

Documents filed55

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Sai Savali (1).pdf9 Oct 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Sai Savali (1).pdf9 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sai Savali.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sai Savali.pdf6 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Sai Savali.pdf6 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sai Savali.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sai Savali.pdf6 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Sai Savali.pdf6 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 mayfair.pdf25 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 mayfair.pdf25 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold invntory mayfair.pdf25 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MAYFAIR_compressed.pdf25 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 mayfair.pdf25 Jan 2024
Proforma of Agreement for saleFile: Proforma of AFS.pdf25 Jan 2024
Declaration in FORM BFile: Form B new 2(4)-Compressed 2.pdf13 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2A 16120.pdf13 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A 161021.pdf13 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A 101022.pdf13 Dec 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf13 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 2022.pdf17 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 2021.pdf17 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 2022.pdf17 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mayfair Form 1.pdf15 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mayfair Form 1.pdf15 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mayfair Form 1 2020-2021.pdf15 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: MK_RERA_2020_21_signed.pdf15 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: MK_RERA_2021_22_signed.pdf15 Feb 2023
Layout approvalFile: APPROVED PLANS.pdf2 Nov 2022
Copy of Layout Approval (in case of layout)File: APPROVED PLANS.pdf2 Nov 2022
Declaration about Commencement CertificateFile: CC A-1.pdf2 Nov 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate bank account.pdf2 Nov 2022
Deviation Report with respect to Allotment letterFile: Allotment letter.pdf2 Nov 2022
Deviation Report with respect to model copy of AgreementFile: Agreement for sale.pdf2 Nov 2022
Building plan approvalFile: 202210182158.pdf25 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: 202210182158.pdf25 Oct 2022
Commencement Certificates / NA Order for plotted developmentFile: 202210182158.pdf25 Oct 2022
Commencement Certificates / NA Order for plotted developmentFile: 202210182158.pdf25 Oct 2022
Layout approvalFile: Approval Plan Part 2_compressed.pdf13 Sep 2020
Layout approvalFile: Approval plans Part 1_compressed.pdf13 Sep 2020
Building plan approvalFile: Revised Building Permission_compressed_compressed.pdf13 Sep 2020
Building plan approvalFile: NA ORDER 01.pdf13 Sep 2020
Building plan approvalFile: NA ORDER 02.pdf13 Sep 2020
Copy of the legal title reportFile: Title_compressed.pdf13 Sep 2020
Details of encumbrancesFile: Search.pdf13 Sep 2020
Details of encumbrancesFile: Search Report_compressed.pdf13 Sep 2020
Copy of Layout Approval (in case of layout)File: Approval Plan Part 2_compressed.pdf13 Sep 2020
Copy of Layout Approval (in case of layout)File: Approval plans Part 1_compressed.pdf13 Sep 2020
Building Plan Approval / NA Order for plotted developmentFile: Revised Building Permission_compressed_compressed.pdf13 Sep 2020
Building Plan Approval / NA Order for plotted developmentFile: NA ORDER 01.pdf13 Sep 2020
Building Plan Approval / NA Order for plotted developmentFile: NA ORDER 02.pdf13 Sep 2020
Commencement Certificates / NA Order for plotted developmentFile: Revised Building Permission_compressed_compressed.pdf13 Sep 2020
Commencement Certificates / NA Order for plotted developmentFile: CC IOD_compressed.pdf13 Sep 2020
Declaration in FORM BFile: Akshay Form B.pdf13 Sep 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM3.pdf13 Sep 2020
Proforma of Allotment letterFile: AGREEMENT FOR SALE NEW.pdf13 Sep 2020

How this compares with Palghar

31%of Palghar projects moved their completion datethis one moved by 10 months
26%of Palghar registrations have lapsed or been cancelledthis one is among them

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAI SAVALI BUILDING A1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR BOISAR RAILWAY STATION, BOISAR EAST3,200+ in Palghar

Builder: MAYFAIR ENTERPRISES

MAYFAIR ENTERPRISES has 2 registrations on MahaRERA, including OM SAI and SAI SAVALI BUILDING A1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What does it mean that SAI SAVALI BUILDING A1 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SAI SAVALI BUILDING A1 is delayed beyond 15 Oct 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAI SAVALI BUILDING A1?

The registered promoter entity is MAYFAIR ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAI SAVALI BUILDING A1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAI SAVALI BUILDING A1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAI SAVALI BUILDING A1?

The professionals named in the filing: Architect: ODYSSEY ARCHITECTS AND ASSOCIATES; Engineer: AGAMI ENGINEERING; Chartered Accountant: SACHIN K KORE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAI SAVALI BUILDING A1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAI SAVALI BUILDING A1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAI SAVALI BUILDING A1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.