SAI SANVIRA - SAI SHRADDHA

By PRAMOD MARUTI JADHAV

RG-MH-76152 · RERA P53100047012 · Last updated on MahaRERA portal: 19 Aug 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Sangli registration emailed to you, free during the pilot beta.
Oct 2026Possession promisedmoved 24 months from the original
1 of 11Construction stages donefurthest along: Basement (if any), 90%
40 of 44Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 62 documents Report an error

SAI SANVIRA - SAI SHRADDHA is a Others project by PRAMOD MARUTI JADHAV in Sangli, Maharashtra, registered with MahaRERA as P53100047012 on 26 Sep 2022. Possession is promised by 31 Oct 2026. The completion date has moved by 24 months from the original filing. 4 of the 44 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameSAI SANVIRA - SAI SHRADDHA
  • TypeOthers
  • Location
    • MAHARASHTRA
    • NEAR AHILYABAI HOLKAR SMARAK VIJAYNAGAR SANGLI
    • Sangli Miraj Kupwad (M Corp.)
    • Miraj
    • Sangli
    • 416416
  • Pincode416416
  • RERA no.P53100047012
  • ReraGenie IDRG-MH-76152

Builder

  • NamePRAMOD MARUTI JADHAV
  • Entity typeIndividual
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredSep 2022First promiseOct 2024Revised toOct 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 Sep 2022
  • Promised completion31 Oct 2026
  • Revised completionRevised to 31 Oct 2026 (originally 31 Oct 2024)
  • Buildings1 building record
  • Documents filed62 files

Current status

9%4 of 44 units booked
65.0%Work done, per cost certificate

Figures as on 19 Aug 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAI SANVIRA SAI SHRADDHANA75301444

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Aug 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 90%.

SAI SANVIRA SAI SHRADDHA: 72% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)90%
Podiums (if any)90%
Plinth90%
Stilt Floor90%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 19 Aug 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes70%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes40%
Landscaping & Tree PlantingYes30%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes50%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed8

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots8
Open Space8

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area578 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Aug 2025
LandownerVillageDistrict
VISHAKHA AKARAM CHARAPALESangli Miraj Kupwad (M Corp.)Sangli
MARUTI MALLAPPA DASI ( DASNATTI)Sangli Miraj Kupwad (M Corp.)Sangli
SUSHMA MARUTI DASNATTISangli Miraj Kupwad (M Corp.)Sangli

Approvals and building plan

Sanctioning authoritySMKC
Permissible FSI1509.06
Proposed, not sanctioned1,509 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSANGLI
Estimated costRs 3.69 cr
Cost incurredRs 2.40 cr
Work done65.05%
BuildingWingEstimatedIncurred
SAI SANVIRA SAI SHRADDHANARs 3.44 crRs 2.40 cr
-NARs 25.00 lakh-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAMIT MOHAN PANDIT MOHAN PANDIT
EngineerVIKAS SHAH V MANE
EngineerCHETAN V MANE
Chartered AccountantRCB & ASSOCIATES
Chartered AccountantSHREYAS SUHAS SHAH
PartnerRole in project
PRAMOD MARUTI JADHAV-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT53100025425Oct 2024 → Oct 2026

Reason as filed by the promoterWe had registered our project Sai Sanvira Sai Shraddha. Its completion date was 31-10-2024. But while the work was going on, we came to develop one more place next to us, so we amalgamated both the places and approved the revised plan, which we have submitted to you. Due to increase in work as per Revised plan, our project could not be completed till 31-10-2024 so we request extension till 31-10-2026

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Oct 2026

Documents filed62

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1 up to JUN 2024.pdf19 Aug 2025
Withdrawal Update Form 2File: Form 2 Up To Jun 2025.pdf19 Aug 2025
Withdrawal Update Form 3File: Form 3 Up to Jun 2025.pdf19 Aug 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Up to 30 Jun 2024.pdf28 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Up to 30 Sep 2024.pdf28 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Up to 31 Dec 2024.pdf28 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Up to 31 March 2025.pdf28 Jul 2025
Declaration in FORM BFile: form b.pdf25 Jul 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 22-23.pdf25 Jul 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A 23-24.pdf25 Jul 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 23-24.pdf25 Jul 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)File: FORM 5 24-25.pdf25 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 up to dec 2024.pdf5 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 up to mar 2025.pdf5 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Up to Dec 2022.pdf5 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Up to Mar 2023.pdf5 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Up to Jun 2023.pdf5 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Up to Sep 2023.pdf5 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Up to Dec 2023.pdf5 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Up to Mar 2024.pdf5 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Up to Dec 2024.pdf5 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Up to Mar 2025.pdf5 Jun 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Up To Dec 2024 .pdf5 Jun 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Up To Mar 2025.pdf5 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR 1.pdf29 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf29 Oct 2024
Disclosure of sold/ booked inventoryFile: SOLD UN.pdf29 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QUALITY ASSURANCE.pdf27 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 up to MAR.pdf26 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 up to JUN 2024.pdf26 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 up to JUN 2024.pdf26 Jul 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf19 Jul 2024
Layout approvalFile: AMALGMATION.pdf12 Jan 2024
Building plan approvalFile: scan0651.pdf12 Jan 2024
Copy of Layout Approval (in case of layout)File: AMALGMATION.pdf12 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: scan0651.pdf12 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: REVISE PERMISSION.pdf12 Jan 2024
Copy of the legal title reportFile: SEARCH REPOST.pdf11 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR CERT.pdf15 Apr 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD (2).pdf15 Apr 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf6 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf4 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf4 Mar 2023
Proforma of Allotment letterFile: allotment letter final.pdf19 Sep 2022
Proforma of Allotment letterFile: model draft agreement.pdf19 Sep 2022
Deviation Report with respect to Allotment letterFile: no devation allotment letter.pdf19 Sep 2022
Deviation Report with respect to model copy of AgreementFile: no devation report model draft.pdf19 Sep 2022
Details of encumbrances concerned to LegalFile: 2 Details of encumbrances.pdf18 Aug 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: LETTER.pdf26 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Adobe Scan 04 Jul 2022_compressed.pdf4 Jul 2022
Layout approvalFile: Adobe Scan 22 Jun 2022 (1)_removed.pdf22 Jun 2022
Copy of Layout Approval (in case of layout)File: Adobe Scan 22 Jun 2022 (1)_removed.pdf22 Jun 2022
Building plan approvalFile: scan0529.pdf20 Jun 2022
Copy of the legal title reportFile: PDF.pdf20 Jun 2022
Details of encumbrancesFile: PDF_removed.pdf20 Jun 2022
Details of encumbrancesFile: letter of encumbrances962022.pdf20 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: scan0529.pdf20 Jun 2022
Declaration in FORM BFile: form b landowner_compressed.pdf1 Jun 2022
PAN CardFile: PAN CARD.pdf30 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: PERMISSION.pdf30 Apr 2022
Declaration about Commencement CertificateFile: FORMAT D.pdf30 Apr 2022
CERSAI detailsFile: CERSAI.pdf30 Apr 2022

How this compares with Sangli

9%of this project is bookeddistrict median 16%
11%of Sangli projects moved their completion datethis one moved by 24 months
29%of Sangli registrations have lapsed or been cancelledthis one is on the register

Computed across the 790+ Sangli projects on ReraGenie, from their own filings.

Keep SAI SANVIRA - SAI SHRADDHA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR AHILYABAI HOLKAR SMARAK VIJAYNAGAR SANGLI790+ in Sangli

Builder: PRAMOD MARUTI JADHAV

Pramod Maruti Jadhav has 2 registrations on MahaRERA, including Sai Vishwas and SAI SANVIRA - SAI SHRADDHA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sangli district page.

Frequently asked questions

What are my rights if SAI SANVIRA - SAI SHRADDHA is delayed beyond 31 Oct 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAI SANVIRA - SAI SHRADDHA?

The registered promoter entity is PRAMOD MARUTI JADHAV, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAI SANVIRA - SAI SHRADDHA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAI SANVIRA - SAI SHRADDHA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAI SANVIRA - SAI SHRADDHA?

The professionals named in the filing: Architect: AMIT MOHAN PANDIT MOHAN PANDIT; Engineer: VIKAS SHAH V MANE; Engineer: CHETAN V MANE; Chartered Accountant: RCB & ASSOCIATES; Chartered Accountant: SHREYAS SUHAS SHAH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAI SANVIRA - SAI SHRADDHA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAI SANVIRA - SAI SHRADDHA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAI SANVIRA - SAI SHRADDHA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.