Registered No litigation declared Residential / Group Housing project

SAI SAMRUDDHI RESIDENCY

By SAI MANGALAM GROUP

RG-MH-03951 · RERA P50500032748 · Last updated on MahaRERA portal: 6 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken
  • Rs 2.50 crore secured on the land, in favour of ARVIND SAHAKARI BANK LTD

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
4 of 11Construction stages donefurthest along: Internal walls, 97%
5 of 42Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 83 documents Report an error

SAI SAMRUDDHI RESIDENCY is a Residential / Group Housing project by SAI MANGALAM GROUP in Nagpur, Maharashtra, registered with MahaRERA as P50500032748 on 24 Jan 2022. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 37 of the 42 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameSAI SAMRUDDHI RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • KH NO 10/B
    • PH NO 37
    • PLOT NO 23
    • 24
    • 25
    • 52
    • 53
    • 54
    • MOUZA-HUDKESHWAR
    • NAGPUR
    • MOUZA-HUDKESHWAR
    • Hudkeshwar kh.
    • Nagpur (Rural)
    • Nagpur
    • 440034
  • Pincode440034
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500032748
  • ReraGenie IDRG-MH-03951

Builder

  • NameSAI MANGALAM GROUP
  • Entity typePartnership
  • PartnerPRAVIN SHANKARRAO CHOUDHARI

Key dates

this monthRegisteredJan 2022First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Jan 2022
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed83 files

Current status

88%37 of 42 units booked
92.9%Work done, per cost certificate

Figures as on 6 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAI SAMRUDDHI RESIDENCYNA8742042

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 97%.

SAI SAMRUDDHI RESIDENCY: 75% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises97%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.65%

Progress on shared amenities15

As on 6 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes82%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes82%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes82%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes82%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed119

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots119
Closed/Covered60
Open Space59

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,098 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofARVIND SAHAKARI BANK LTD
Secured amountRs 2.50 crore
CERSAI search filedYes
Declared on11 Dec 2025
LandownerVillageDistrict
M/S RAGHAV ASSOCIATESNagpur (M Corp.)Nagpur

Approvals and building plan

Sanctioning authorityNagpur Municipal Corporation (NMC)
Permissible FSI3512.24
Proposed, not sanctioned3,511 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchWARDHA ROAD, NAGPUR
Estimated costRs 6.75 cr
Cost incurredRs 6.27 cr
Work done92.89%
BuildingWingEstimatedIncurred
SAI SAMRUDDHI RESIDENCYNARs 6.75 crRs 6.27 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSYED MOBIN ARCHITECTS
ArchitectTEJASHREE GADODIA
EngineerSYED MOBIN ARCHITECTS
EngineerCHETAN GAHUKAR
EngineerAYUSH LONARE
Chartered AccountantCA AMIT A AGRAWAL
Chartered AccountantASHISH AGARWAL
Chartered AccountantSUMIT R CHANDWANI
PartnerRole in project
SAI MANGALAM GROUP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA12122518649Dec 2025 → Dec 2026

Reason as filed by the promoterDue to unforeseen circumstances beyond our control, the completion certificate for the aforementioned project has been delayed from the concerned department. This delay has arisen due to pending approvals and administrative procedures.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Jan 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Dec 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Dec 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Dec 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed83

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 Architect Certificate Dec 2025.pdf6 May 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate Dec 2025.pdf6 May 2026
Withdrawal Update Form 3File: Form 3 CA Certificate Dec 2025.pdf6 May 2026
Withdrawal Update Form 1File: FORM 1 Architect Certificate Dec 2025.pdf3 Feb 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate Dec 2025.pdf3 Feb 2026
Withdrawal Update Form 3File: Form 3 CA Certificate Dec 2025.pdf3 Feb 2026
Withdrawal Update Form 1File: FORM 1 Architect Certificate Sept 2025.pdf12 Dec 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate Sept 2025.pdf12 Dec 2025
Withdrawal Update Form 3File: Form 3 CA Certificate Sept 2025.pdf12 Dec 2025
Form 1File: FORM 1 Architect Certificate Sept 2025.pdf2 Dec 2025
Form 2File: Form 2 Engineer Certificate Sept 2025.pdf2 Dec 2025
Form 3File: Form 3 CA Certificate Sept 2025.pdf2 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory Sept 2025.pdf2 Dec 2025
Form 2A (FY 2021-2022)File: Form 2A FY 21-22 Sai samruddhi.pdf6 Nov 2025
Form 2A (FY 2022-2023)File: Form 2A FY 22-23 Sai samruddhi.pdf6 Nov 2025
Form 2A (FY 2023-2024)File: Form 2A FY 23-24 Sai samruddhi.pdf6 Nov 2025
Form 2A (FY 2024-2025)File: Form 2A FY 24-25 Sai samruddhi.pdf6 Nov 2025
Form 2A (FY 2024-2025)File: Form 2A FY 24-25 Sai samruddhi.pdf6 Nov 2025
Form 5 (FY 2022-2023)File: Form 5 FY 22-23 Sai Samruddhi.pdf6 Nov 2025
Form 5 (FY 2023-2024)File: Form 5 FY 23-24 Sai samruddhi.pdf6 Nov 2025
Form 5 (FY 2024-2025)File: Form 5 FY 24-25 Sai samruddhi.pdf6 Nov 2025
Form 1File: Form 1 Architect Certificate June24.pdf3 Nov 2025
Form 2File: Form 2 Engineer certificate June 24.pdf3 Nov 2025
Form 3File: Form 3 CA certificate June 24.pdf3 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory June 24.pdf3 Nov 2025
Form 1File: FORM 1 Architect Certificate Sept24.pdf3 Nov 2025
Form 2File: Form 2 Engineer certificate Sept 24.pdf3 Nov 2025
Form 3File: Form 3 CA Certificate Sept 24.pdf3 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory Sept 24.pdf3 Nov 2025
Form 1File: FORM 1-Architect Certificate Dec24.pdf3 Nov 2025
Form 2File: Form 2 Engineer certificate Dec24.pdf3 Nov 2025
Form 3File: Form 3 CA Certificate Dec 24.pdf3 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory Dec24.pdf3 Nov 2025
Form 1File: FORM 1-Architect Certificate March 25.pdf3 Nov 2025
Form 2File: Form 2 Engineer certificate March 25.pdf3 Nov 2025
Form 3File: Form 3 CA certificate March 25.pdf3 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory March 25.pdf3 Nov 2025
Form 1File: FORM 1-Architect Certificate June25.pdf3 Nov 2025
Form 2File: Form 2 Engineer certificate June 25.pdf3 Nov 2025
Form 3File: Form 3 CA certificate June25.pdf3 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold and Booked Inventory June 25.pdf3 Nov 2025
Form 1File: Form 1 Architect certificate March 23.pdf18 Oct 2025
Form 2File: Form 2 Engineer certificate march 23.pdf18 Oct 2025
Form 3File: Form 3 CA Certificate March 23.pdf18 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory March 2023.pdf18 Oct 2025
Form 1File: Form 1 Architect certificate June 23.pdf18 Oct 2025
Form 2File: Form 2 Engineer certificate June 23.pdf18 Oct 2025
Form 3File: Form 3 CA Certificate June 23.pdf18 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory June 2023.pdf18 Oct 2025
Form 1File: Form 1 Architect certificate Sept 23.pdf18 Oct 2025
Form 2File: Form 2 Engineer certificate Sept 23.pdf18 Oct 2025
Form 3File: Form 3 CA Certificate Sept 23.pdf18 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory Sept 2023.pdf18 Oct 2025
Form 1File: Form 1 Architect certificate dec 23.pdf18 Oct 2025
Form 2File: Form 2 Engineer certificate Dec 23.pdf18 Oct 2025
Form 3File: Form 3 CA Certificate Dec 23.pdf18 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory Dec 2023.pdf18 Oct 2025
Form 1File: Form 1 Architect Certificate March 24.pdf18 Oct 2025
Form 2File: Form 2 Engineer certificate march 24.pdf18 Oct 2025
Form 3File: Form 3 CA Certificate March 24.pdf18 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory March 2024.pdf18 Oct 2025
CERSAI detailsFile: CERSAI_Search_Report_200228215070_For_Debtor_Based_Search_17_01_2022_14_42_53_052.pdf17 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certificate.pdf7 Jan 2022
OtherFile: SALE DEED 1 .pdf7 Jan 2022
OtherFile: SALE DEED 3.pdf7 Jan 2022
OtherFile: SALE DEED 4.pdf7 Jan 2022
OtherFile: SALE_DEED 5.pdf7 Jan 2022
OtherFile: SALE_DEED_6.pdf7 Jan 2022
OtherFile: SALE_DEED 7.pdf7 Jan 2022
OtherFile: SALE_DEED_8.pdf7 Jan 2022
OtherFile: SALE DEED 2_compressed.pdf7 Jan 2022
Copy of the legal title reportFile: legal tittle report.pdf6 Jan 2022
Details of encumbrancesFile: Encumbrances.pdf4 Jan 2022
Declaration about Commencement CertificateFile: Declaration comencement certificate.pdf4 Jan 2022
Declaration in FORM BFile: Form B.pdf4 Jan 2022
Proforma of Allotment letterFile: Allotment Letter.pdf4 Jan 2022
Layout approvalFile: sanction map.pdf31 Dec 2021
Building plan approvalFile: sanction map.pdf31 Dec 2021
PAN CardFile: FIRM PANCARD.pdf31 Dec 2021
Copy of Layout Approval (in case of layout)File: sanction map.pdf31 Dec 2021

How this compares with Nagpur

88%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one moved by 12 months
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAI SAMRUDDHI RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MOUZA-HUDKESHWAR2,800+ in Nagpur

2 kmSAI SAMRUDDHI RESIDENCYCompleted 21Lapsed / revoked 4Other 22Dot size: filed unitsN

Filed coordinates, straight-line distance. 47 registered projects within 2 km.

Builder: SAI MANGALAM GROUP

SAI MANGALAM GROUP has 1 registration on MahaRERA, including SAI SAMRUDDHI RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if SAI SAMRUDDHI RESIDENCY is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAI SAMRUDDHI RESIDENCY?

The registered promoter entity is SAI MANGALAM GROUP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAI SAMRUDDHI RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAI SAMRUDDHI RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAI SAMRUDDHI RESIDENCY?

The professionals named in the filing: Architect: SYED MOBIN ARCHITECTS; Architect: TEJASHREE GADODIA; Engineer: SYED MOBIN ARCHITECTS; Engineer: CHETAN GAHUKAR; Engineer: AYUSH LONARE; Chartered Accountant: CA AMIT A AGRAWAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAI SAMRUDDHI RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAI SAMRUDDHI RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAI SAMRUDDHI RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.