Registered No litigation declared Residential / Group Housing project

SAI SAMARTH SANKUL A TYPE

By SAI SAMARTH ENTERPRISES

RG-MH-29562 · RERA P52900032154 · Last updated on MahaRERA portal: 2 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 39 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 39 months from the original
8 of 22Construction stages doneacross 2 buildings; furthest along: Sanitary Fittings within the flats /..., 90%
17 of 28Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 88 documents Report an error

SAI SAMARTH SANKUL A TYPE is a Residential / Group Housing project by SAI SAMARTH ENTERPRISES in Sindhudurg, Maharashtra, registered with MahaRERA as P52900032154 on 14 Dec 2021. Possession is promised by 31 Mar 2027. The completion date has moved by 39 months from the original filing. 11 of the 28 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete.

At a glance

Project

  • NameSAI SAMARTH SANKUL A TYPE
  • TypeResidential / Group Housing
  • Location
    • KUDAL
    • Kudal (CT)
    • Sindhudurg
    • 416520
  • Pincode416520
  • RERA no.P52900032154
  • ReraGenie IDRG-MH-29562

Builder

  • NameSAI SAMARTH ENTERPRISES
  • Entity typePartnership
  • PartnersMEGHA ASHISH SHAH, ALHAD MANOHAR SAMANT, ASHISH RAMAKANT MAHAJAN, SACHIN SURESH MAHAJAN
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredDec 2021First promiseDec 2023Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Dec 2021
  • Promised completion31 Mar 2027
  • Revised completionRevised to 31 Mar 2027 (originally 31 Dec 2023)
  • Buildings2 building records
  • Documents filed88 files

Current status

39%11 of 28 units booked
15.9%Work done, per cost certificate

Figures as on 2 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING A1NA4416016
WING A2NA4412012

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 2 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.

WING A167%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
WING A225%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks5%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 2 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed3

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots3
Open Space3

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,867 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on11 Mar 2026

Approvals and building plan

Sanctioning authorityKUDAL NAGARPANCHAYAT
Permissible FSI1545.04
Proposed, not sanctioned1,545 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchChandansar, Virar
Estimated costRs 2.88 cr
Cost incurredRs 45.79 lakh
Work done15.9%
BuildingWingEstimatedIncurred
WING A1NARs 1.74 cr-
WING A2NARs 1.14 crRs 45.79 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDSM CONSULTANTS
EngineerANIL B CHOUGULE & ASSOCIATES
EngineerANIL B CHOUGULE
Chartered AccountantBHARAT KATARIA & CO
Chartered AccountantPALLAVI P BARAPATRE
Chartered AccountantCHRYSTAL MARTIN AND CO
PartnerRole in project
SAI SAMARTH ENTERPRISES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA08042620580Dec 2023 → Mar 2027

Reason as filed by the promoterWe have already applied for Occupancy Certificate. So we need to extend the Rera Certificate for the uploading of Occupancy Certificate as and when we receive it.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Dec 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Mar 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Mar 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Nov 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed88

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 300925.pdf2 May 2026
Withdrawal Update Form 1File: FORM 1 311225.pdf2 May 2026
Withdrawal Update Form 2File: FORM 2 30092025.pdf2 May 2026
Withdrawal Update Form 2File: FORM 2 311225.pdf2 May 2026
Withdrawal Update Form 3File: FORM 3 300925.pdf2 May 2026
Withdrawal Update Form 3File: FORM3 311225.pdf2 May 2026
Form 1File: FORM 1 SAI SAMARTH 310324.pdf30 Apr 2026
Form 2File: FORM 2 SAI SAMARTH 310324.pdf30 Apr 2026
Form 3File: FORM 3 SAI SAMARTH 310324.pdf30 Apr 2026
Disclosure of Sold and Booked InventoryFile: samarth sold n unsold 310324.pdf30 Apr 2026
Form 1File: FORM 1 SAI SAMARTH 300624.pdf30 Apr 2026
Form 2File: FORM 2 SAI SAMARTH 300624.pdf30 Apr 2026
Form 3File: FORM 3 SAI SAMARTH 300624.pdf30 Apr 2026
Disclosure of Sold and Booked InventoryFile: samarth sold n unsold 300624.pdf30 Apr 2026
Form 1File: FORM 1 SAI SAMARTH 300924.pdf30 Apr 2026
Form 2File: FORM 2 SAI SAMARTH 300924.pdf30 Apr 2026
Form 3File: FORM 3 SAI SAMARTH 300924.pdf30 Apr 2026
Disclosure of Sold and Booked InventoryFile: samarth sold n unsold 300924.pdf30 Apr 2026
Form 1File: SAI SAMARTH FORM 1 311224.pdf30 Apr 2026
Form 2File: FORM 2 SAI SAMARTH 311224.pdf30 Apr 2026
Form 3File: FORM 3 SAI SAMARTH 311224.pdf30 Apr 2026
Disclosure of Sold and Booked InventoryFile: samarth sold n unsold 311224.pdf30 Apr 2026
Form 1File: FORM 1 SAI SAMARTH 310325.pdf30 Apr 2026
Form 2File: FORM 2 SAI SAMARTH 310325.pdf30 Apr 2026
Form 3File: FORM 3 SAI SAMARTH 310325.pdf30 Apr 2026
Disclosure of Sold and Booked InventoryFile: samarth sold n unsold 310325.pdf30 Apr 2026
Withdrawal Update Form 1File: FORM 1 SAI SAMARTH 300625.pdf30 Apr 2026
Withdrawal Update Form 2File: FORM 2 SAI SAMARTH 300625.pdf30 Apr 2026
Withdrawal Update Form 3File: FORM 3 30062025.pdf30 Apr 2026
Form 2A (FY 2021-2022)File: FORM 2A SAI SAMARTH 2021-22.pdf8 Apr 2026
Form 2A (FY 2022-2023)File: FORM 2A SAI SAMARTH 2022-2023.pdf8 Apr 2026
Form 2A (FY 2023-2024)File: FORM 2A SAI SAMARTH 2023-2024.pdf8 Apr 2026
Form 5 (FY 2021-2022)File: Form 5 sai samarth enterprises 2021 -22.pdf8 Apr 2026
Form 5 (FY 2022-2023)File: samarth form 5 22-23.pdf8 Apr 2026
Form 5 (FY 2023-2024)File: samarth form 5 202324.pdf8 Apr 2026
Form 1File: FORM 1 SAI SAMARTH 300623.pdf17 Feb 2026
Form 2File: FORM 2 SAI SAMARTH 300623.pdf17 Feb 2026
Form 3File: FORM 3 SAI SAMARTH 300623.pdf17 Feb 2026
Disclosure of Sold and Booked InventoryFile: samarth sold n unsold 300623.pdf17 Feb 2026
Form 1File: FORM 1 SAI SAMARTH 300923.pdf17 Feb 2026
Form 2File: FORM 2 SAI SAMARTH 300923.pdf17 Feb 2026
Form 3File: FORM 3 SAI SAMARTH 300923.pdf17 Feb 2026
Disclosure of Sold and Booked InventoryFile: samarth sold n unsold 300923.pdf17 Feb 2026
Form 1File: FORM 1 SAI SAMARTH 311223.pdf17 Feb 2026
Form 2File: FORM 2 SAI SAMARTH 311223.pdf17 Feb 2026
Form 3File: FORM 3 SAI SAMARTH 311223.pdf17 Feb 2026
Disclosure of Sold and Booked InventoryFile: samarth sold n unsold 311223.pdf17 Feb 2026
Form 3File: FORM 3 SAI SAMARTH DEC 2021.pdf16 Feb 2026
Form 2File: FORM 2 SWAMI SAMARTH DEC 2021.pdf16 Feb 2026
Disclosure of Sold and Booked InventoryFile: samarth sold n unsold 311221.pdf16 Feb 2026
Form 1File: Form 1 shree samarth krupa 311221.pdf16 Feb 2026
Form 1File: FORM 1 SAI SAMARTH 310322.pdf16 Feb 2026
Form 2File: FORM 2 SAI SAMARTH 31032022.pdf16 Feb 2026
Form 3File: FORM 3 SAI SAMARTH MAR 2022.pdf16 Feb 2026
Disclosure of Sold and Booked InventoryFile: samarth sold n unsold 310322.pdf16 Feb 2026
Form 1File: FORM 1 SAI SAMARTH 30062022.pdf16 Feb 2026
Form 2File: FORM 2 ENGINEER CERTIFICATE 300622.pdf16 Feb 2026
Form 3File: FORM 3 SAI SAMARTH 300622.pdf16 Feb 2026
Disclosure of Sold and Booked InventoryFile: samarth sold n unsold 300622.pdf16 Feb 2026
Form 1File: FORM 1 SAI SAMARTH 300922.pdf16 Feb 2026
Form 2File: FORM 2 SAI SAMARTH 300922.pdf16 Feb 2026
Form 3File: FORM 3 SAI SAMARTH 300922.pdf16 Feb 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 300922.pdf16 Feb 2026
Form 1File: FORM 1 SAI SAMARTH 311222.pdf16 Feb 2026
Form 2File: FORM 2 SAI SAMARTH 311222.pdf16 Feb 2026
Form 3File: FORM 3 SAI SAMARTH 311222.pdf16 Feb 2026
Disclosure of Sold and Booked InventoryFile: samarth sold n unsold 311222.pdf16 Feb 2026
Form 1File: FORM 1 SAI SAMARTH 310323.pdf16 Feb 2026
Form 2File: form 2 sai samarth 310323.pdf16 Feb 2026
Form 3File: FORM 3 SAI SAMARTH 310323.pdf16 Feb 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 310323.pdf16 Feb 2026
Copy of the legal title reportFile: Tiltle Search Report.pdf2 Dec 2021
CERSAI detailsFile: Sai Samarth Enterprises 1.pdf2 Dec 2021
Proforma of Allotment letterFile: 2 Proforma of the allotment letter and agreement for sale.pdf2 Dec 2021
Declaration about Commencement CertificateFile: Declaration about CC.pdf9 Nov 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate_V2.pdf3 Nov 2021
Proforma of Allotment letterFile: Draft Sale Agreement.pdf3 Nov 2021
Layout approvalFile: Layout Plan.pdf5 Mar 2021
Building plan approvalFile: MYSCAN_20170731_0002.pdf5 Mar 2021
PAN CardFile: PAN CARD.pdf5 Mar 2021

How this compares with Sindhudurg

39%of this project is bookeddistrict median 15%
21%of Sindhudurg projects moved their completion datethis one moved by 39 months
30%of Sindhudurg registrations have lapsed or been cancelledthis one is on the register

Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.

Keep SAI SAMARTH SANKUL A TYPE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KUDAL530+ in Sindhudurg

Builder: SAI SAMARTH ENTERPRISES

SAI SAMARTH ENTERPRISES has 3 registrations on MahaRERA, including SAI SAMARTH SANKUL and SAI COMPLEX. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sindhudurg district page.

Frequently asked questions

What are my rights if SAI SAMARTH SANKUL A TYPE is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAI SAMARTH SANKUL A TYPE?

The registered promoter entity is SAI SAMARTH ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAI SAMARTH SANKUL A TYPE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAI SAMARTH SANKUL A TYPE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAI SAMARTH SANKUL A TYPE?

The professionals named in the filing: Architect: DSM CONSULTANTS; Engineer: ANIL B CHOUGULE & ASSOCIATES; Engineer: ANIL B CHOUGULE; Chartered Accountant: BHARAT KATARIA & CO; Chartered Accountant: PALLAVI P BARAPATRE; Chartered Accountant: CHRYSTAL MARTIN AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAI SAMARTH SANKUL A TYPE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAI SAMARTH SANKUL A TYPE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAI SAMARTH SANKUL A TYPE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.