Registered No litigation declared Residential / Group Housing project

SAI RAJWADA 21

By AICD INFRAVENTURE

RG-MH-30443 · RERA P50500050900 · Last updated on MahaRERA portal: 9 May 2026

Source: official MahaRERA filing

Red flags

  • Possession 1 months past the filed date
  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Sep 2026Possession promised1 month past this date
9 of 11Construction stages donefurthest along: Basement (if any), 0%
3 of 14Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 108 documents Report an error

SAI RAJWADA 21 is a Residential / Group Housing project by AICD INFRAVENTURE in Nagpur, Maharashtra, registered with MahaRERA as P50500050900 on 15 May 2023. Possession was promised by 30 Sep 2026 and is now 1 months past that date. The completion date has moved by 24 months from the original filing. 11 of the 14 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameSAI RAJWADA 21
  • TypeResidential / Group Housing
  • Location
    • AMBAZARI ROAD
    • AMBAZARI
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440010
  • Pincode440010
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500050900
  • ReraGenie IDRG-MH-30443

Builder

  • NameAICD INFRAVENTURE
  • Entity typePartnership
  • PartnersLEKHRAJ MAHADEORAO BHOYAR, NITIN MADHUKARRAO BARAPATRE, SAPANA NITIN BARAPATRE

Key dates

1 months past promisethis monthRegisteredMay 2023First promiseSep 2024Revised toSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 May 2023
  • Promised completion30 Sep 2026
  • Revised completionRevised to 30 Sep 2026 (originally 5 Sep 2024)
  • Buildings1 building record
  • Documents filed108 files

Current status

79%11 of 14 units booked
100.0%Work done, per cost certificate

Figures as on 9 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAI RAJWADA 21NA8714014

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

SAI RAJWADA 21: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 9 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed21

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots21
Closed/Covered1
Open Space20

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area646 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on31 Jul 2025
LandownerVillageDistrict
JAY RAMCHANDRA DEOTALENagpur (M Corp.)Nagpur
VIJAY RAMCHANDRA DEOTALENagpur (M Corp.)Nagpur
VIDYA SANJAY MUNGHATENagpur (M Corp.)Nagpur

Approvals and building plan

Sanctioning authorityNagpur Municipal corporation
Permissible FSI2294.04
Proposed, not sanctioned2,294 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGANDHI NAGAR, NAGPUR, MAHARASHTRA-440010
Estimated costRs 6.76 cr
Cost incurredRs 6.76 cr
Work done100.0%
BuildingWingEstimatedIncurred
SAI RAJWADA 21NARs 6.76 crRs 6.76 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDEVINE ARCHITECTS
EngineerNishant Siddharth Sontakke
Chartered AccountantVinod sukhdeo Bhakta
Chartered AccountantVINOD BHAKTA & ASSOCIATES
PartnerRole in project
AICD INFRAVENTURE-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT50500025040Sep 2024 → Sep 2025

Reason as filed by the promoterDue to unforeseen circumstances beyond our control, the completion certificate for the aforementioned project has been delayed from the concerned department. This delay has arisen due to pending approvals and administrative procedures.

EA02122518492Sep 2024 → Sep 2026

Reason as filed by the promoterDue to unforeseen circumstances beyond our control, the completion certificate for the aforementioned project has been delayed from the concerned department. This delay has arisen due to pending approvals and administrative procedures. Consent of more than 51% has been obtained. The Occupation Certificate (OC) was received on 30th September 2025. All construction work was completed by 30th September 2025. After obtaining the extension, we will apply for the change application, and thereafter, we will apply for completion.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed108

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 108 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: AICD RERA Architech certificate December25.pdf9 May 2026
Withdrawal Update Form 1File: AICD RERA Architech certificate March 2026.pdf9 May 2026
Withdrawal Update Form 1File: AICD RERA Architech certificate March 2026.pdf9 May 2026
Withdrawal Update Form 2File: AICD RERA Engineer Certificate December25.pdf9 May 2026
Withdrawal Update Form 2File: AICD RERA Engineer Certificate March 2026.pdf9 May 2026
Withdrawal Update Form 2File: AICD RERA Engineer Certificate March 2026.pdf9 May 2026
Withdrawal Update Form 3File: CA Certificate December 2025.pdf9 May 2026
Withdrawal Update Form 3File: CA Certificate March 2026.pdf9 May 2026
Withdrawal Update Form 3File: CA Certificate March 2026.pdf9 May 2026
Withdrawal Update Form 1File: AICD RERA Architech Certificate September25.pdf29 Oct 2025
Withdrawal Update Form 2File: AICD RERA Engineer Certificate September25.pdf29 Oct 2025
Withdrawal Update Form 3File: CA Certificate September 2025.pdf29 Oct 2025
Withdrawal Update Form 1File: AICD RERA Architech Certificate June25.pdf7 Aug 2025
Withdrawal Update Form 1File: AICD RERA Architech Certificate June25.pdf7 Aug 2025
Withdrawal Update Form 2File: AICD RERA Engineer Certificate June 25.pdf7 Aug 2025
Withdrawal Update Form 2File: AICD RERA Engineer Certificate June 25.pdf7 Aug 2025
Withdrawal Update Form 3File: CA certificate JUNE 2025.pdf7 Aug 2025
Withdrawal Update Form 3File: CA certificate JUNE 2025.pdf7 Aug 2025
Declaration in FORM BFile: FORM B.pdf4 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 15 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf4 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE mar25.pdf4 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf4 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory Sept.pdf4 Apr 2025
Disclosure of sold/ booked inventoryFile: sold unsold inventory Dec.pdf4 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory Mar.pdf4 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 14 CA CERTIFICATE ON PROJECT COST AND FUND WITHDRAWAL(FORM 3).pdf25 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 7 Annual Audit Report of Statutory CA (Form 5) (FY 2024-25).pdf13 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 8 Annual Audit Report of Statutory CA (Form 5) (FY 2024-25).pdf13 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 14 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf11 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 14 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf11 Jan 2025
Declaration in FORM BFile: FORM -B-.pdf14 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf16 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf16 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 Architech Certificate of completion 92.pdf9 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7 ARCHITECH CERTIFICATE ON COMPLETION OF PROJECT 24 SEP 2024.pdf9 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 ENGINEER CERTIFICATE ON QUALITY ASSURANCE 92.pdf9 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 Engineer certificate 96.pdf9 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 6 ENGINEER CERTIFICATE ON QUALITY ASSURANCE 92.pdf9 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 7 Engineer certificate 96.pdf9 Oct 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf22 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architech Certificate of completion of project.pdf21 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Ahitech Certificate of completion of project 25 JULY 23.pdf21 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Architech Certificate of completion of project Q3 25 OCT 23.pdf21 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Architech Certificate of completion of project 25 JAN 24.pdf21 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 Architech Certificate of completion of project 24 APRIL 24.pdf21 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1Engineer Certificate on cost incurred 25 APRIL 23.pdf21 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2Engineer Certificate On quality assurance 25 JULY 23.pdf21 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3Engineer Certificate On quality Assurance 25 OCT 23.pdf21 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4Engineer Certificate on quality assurance 25 JAN 24.pdf21 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5Engineer Certificate on quality assurance 5th 25 APRIL 2024.pdf21 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 CA CERTIFICATE ON PROJECT COST AND FUND WITHDRAWAL 24 april 2023.pdf21 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 CA CERTIFICATE ON PROJECT COST AND FUND WITHDRAWAL 25 JULY 2023.pdf21 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 CA CERTIFICATE ON PROJECT COST AND FUND WITHDRAWAL 24 OCT 2023.pdf21 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5 CA CERTIFICATE ON PROJECT COST AND FUND WITHDRAWAL 25 JAN 2024.pdf21 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6 CA CERTIFICATE ON PROJECT COST AND FUND WITHDRAWAL 24 APRIL 2024.pdf21 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2CA CERTIFICATE ON PROJECT COST AND FUND WITHDRAWAL 24 april 2023.pdf20 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 CA CERTIFICATE ON PROJECT COST AND FUND WITHDRAWAL 25 JULY 2023.pdf20 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 CA CERTIFICATE ON PROJECT COST AND FUND WITHDRAWAL 24 OCT 2023.pdf20 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5 CA CERTIFICATE ON PROJECT COST AND FUND WITHDRAWAL 25 JAN 2024.pdf20 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6 CA CERTIFICATE ON PROJECT COST AND FUND WITHDRAWAL 24 APRIL 2024.pdf20 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architech Certificate of completion of project.pdf19 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Ahitech Certificate of completion of project.pdf19 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Architech Certificate of completion of project.pdf19 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Architech Certificate of completion of project.pdf19 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 Architech Certificate of completion of project.pdf19 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1Engineer Certificate on cost incurred.pdf19 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2Engineer Certificate On quality assurance 2nd.pdf19 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3Engineer Certificate On quality Assurance 3rd.pdf19 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4Engineer Certificate on quality assurance 4th.pdf19 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5Engineer Certificate on quality assurance 5th 25 APRIL 2024.pdf19 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer Certificate on quality assurance.pdf13 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer Certificate On quality assurance 2nd.pdf13 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer Certificate On quality Assurance 3rd.pdf13 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer Certificate on quality assurance 4th.pdf13 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer Certificate on quality assurance 5th.pdf13 Jun 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory.pdf13 Jun 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory.pdf13 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Annual Audit Report of Statutory CA.pdf13 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 2 Annual Audit Report of Statutory CA.pdf13 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 3 Annual Audit Report of Statutory CA.pdf13 Jun 2024

How this compares with Nagpur

79%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one moved by 24 months
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAI RAJWADA 21 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AMBAZARI2,800+ in Nagpur

2 kmSAI RAJWADA 21Completed 25Lapsed / revoked 15Other 44Dot size: filed unitsN

Filed coordinates, straight-line distance. 84 registered projects within 2 km.

Builder: AICD INFRAVENTURE

AICD INFRAVENTURE has 1 registration on MahaRERA, including SAI RAJWADA 21. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if SAI RAJWADA 21 is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAI RAJWADA 21?

The registered promoter entity is AICD INFRAVENTURE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAI RAJWADA 21?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAI RAJWADA 21?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAI RAJWADA 21?

The professionals named in the filing: Architect: DEVINE ARCHITECTS; Engineer: Nishant Siddharth Sontakke; Chartered Accountant: Vinod sukhdeo Bhakta; Chartered Accountant: VINOD BHAKTA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAI RAJWADA 21?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAI RAJWADA 21. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAI RAJWADA 21 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.