Home / Browse projects / Sindhudurg, Maharashtra / Sai Pushpa

Registration lapsed No litigation declared Residential / Group Housing project

Sai Pushpa

By Sai Ganesh Enterprises

RG-MH-56886 · RERA P52900018296 · Last updated on MahaRERA portal: 3 Feb 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 5 months past the filed date
  • Completion date moved by 50 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.
May 2026Possession promised5 months past this date
4 of 11Construction stages donefurthest along: Internal walls, 80%
26 of 40Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 180 documents Report an error

Sai Pushpa is a Residential / Group Housing project by Sai Ganesh Enterprises in Sindhudurg, Maharashtra, registered with MahaRERA as P52900018296 on 22 Oct 2018. Possession was promised by 31 May 2026 and is now 5 months past that date. The completion date has moved by 50 months from the original filing. 14 of the 40 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameSai Pushpa
  • TypeResidential / Group Housing
  • Location
    • Satkar Pananad
    • Kudal St Stand
    • Kudal (CT)
    • Kudal
    • Sindhudurg
    • 416520
  • Pincode416520
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52900018296
  • ReraGenie IDRG-MH-56886

Builder

  • NameSai Ganesh Enterprises
  • Entity typePartnership
  • PartnersManoj Pandharinath Mhatre, Alpa Yatin Mhatre, Priya Rakesh Rawat
  • Other registrations2 more →
  • No longer live2 lapsed, de-registered or revoked

Key dates

5 months past promisethis monthRegisteredOct 2018First promiseMar 2022Revised toMay 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on22 Oct 2018
  • Promised completion31 May 2026
  • Revised completionRevised to 31 May 2026 (originally 30 Mar 2022)
  • Buildings1 building record
  • Documents filed180 files

Current status

35%14 of 40 units booked

Figures as on 3 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sai PushpaNA5540040

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 80%.

Sai Pushpa: 57% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure5%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities16

As on 3 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes25%
Storm Water DrainsYes14%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes10%
Roof on TerraceYes100%

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,740 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 Mar 2026
LandownerVillageDistrict
Pravin Jyotiba JadhavThane (M Corp.)Thane
Manoj P MhatreThane (M Corp.)Thane

Approvals and building plan

Sanctioning authorityKudal Nagar Panchyat
Permissible FSI1874.4
Proposed, not sanctioned1,512 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 4 nd 5, Milestone Corporate Park, Duttwadi, OLd Mumbai Poona Road, Kalwa Thane 400605

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRupesh N Tawate
EngineerMadhukar S Shirsat
EngineerAnil B Chogule
Chartered AccountantDinesh Humane
Chartered AccountantA Mahesh Shashikant Bhagat
PartnerRole in project
Sai Ganesh Enterprises-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52900013673Mar 2022 → May 2026

Reason as filed by the promoterExtended CC for few New flats and Floor

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Oct 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Oct 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Oct 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Oct 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed180

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 180 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: form 1 Architect Certificate 31 dec 2025.pdf3 Feb 2026
Form 2File: form 2 Engineer Certificate 31 dec 2025.pdf3 Feb 2026
Form 3File: 7 jan 2026.pdf3 Feb 2026
Disclosure of Sold and Booked InventoryFile: 30 jan 2026.pdf3 Feb 2026
Self-declaration of Quarterly ProgressFile: 29 dec 2025.pdf3 Feb 2026
Form 2A (FY 2018-2019)File: FForm 2 A 18-19.pdf3 Feb 2026
Form 2A (FY 2019-2020)File: Form 2 A 19-20.pdf3 Feb 2026
Form 2A (FY 2020-2021)File: Form 2 A 20-21.pdf3 Feb 2026
Form 2A (FY 2021-2022)File: Form 2 A 21-22.pdf3 Feb 2026
Form 2A (FY 2022-2023)File: Form 2 A 22-23.pdf3 Feb 2026
Form 2A (FY 2023-2024)File: Form 2 A 23-24.pdf3 Feb 2026
Form 2A (FY 2024-2025)File: Form 2A 24-25.pdf3 Feb 2026
Form 1File: form 1 Architect Certificate 31st dec 2019.pdf21 Jan 2026
Form 2File: form 2 Engineer Certificate 30th Dec 2019.pdf21 Jan 2026
Form 3File: 5 Jan 2020.pdf21 Jan 2026
Disclosure of Sold and Booked InventoryFile: 6 jan 2020.pdf21 Jan 2026
Self-declaration of Quarterly ProgressFile: 5 dec 2019.pdf21 Jan 2026
Form 1File: form 1 Architect Certificate 31st March 2020.pdf21 Jan 2026
Form 2File: form 2 Engineer Certificate 31st March 2020.pdf21 Jan 2026
Form 3File: 6 April 2020.pdf21 Jan 2026
Disclosure of Sold and Booked InventoryFile: 7 apr 2020.pdf21 Jan 2026
Self-declaration of Quarterly ProgressFile: 6 mar 2020.pdf21 Jan 2026
Form 1File: form 1 Architect Certificate 30th june 2020.pdf21 Jan 2026
Form 2File: form 2 Engineer Certificate 30th june 2020.pdf21 Jan 2026
Form 3File: 7 July 2020.pdf21 Jan 2026
Disclosure of Sold and Booked InventoryFile: 8 jul 2020.pdf21 Jan 2026
Self-declaration of Quarterly ProgressFile: 7 jun 2020.pdf21 Jan 2026
Form 1File: form 1 Architect Certificate 30th sept 2020.pdf21 Jan 2026
Form 2File: form 2 Engineer Certificate 30th sept 2020.pdf21 Jan 2026
Form 3File: 8 Oct 2020.pdf21 Jan 2026
Disclosure of Sold and Booked InventoryFile: 9 oct 2020.pdf21 Jan 2026
Self-declaration of Quarterly ProgressFile: 8 sep 2020.pdf21 Jan 2026
Form 1File: form 1 Architect Certificate 31st dec 2020.pdf21 Jan 2026
Form 2File: form 2 Engineer Certificate 31st dec 2020.pdf21 Jan 2026
Form 3File: 9 Jan 2021.pdf21 Jan 2026
Disclosure of Sold and Booked InventoryFile: 10 jan 2021.pdf21 Jan 2026
Self-declaration of Quarterly ProgressFile: 9 dec 2020.pdf21 Jan 2026
Form 1File: form 1 Architect Certificate 31st March 2021.pdf21 Jan 2026
Form 2File: form 2 Engineer Certificate 31st March 2021.pdf21 Jan 2026
Form 3File: 10 April 2021.pdf21 Jan 2026
Disclosure of Sold and Booked InventoryFile: 11 apr 2021.pdf21 Jan 2026
Self-declaration of Quarterly ProgressFile: 10 mar 2021.pdf21 Jan 2026
Form 1File: form 1 Architect Certificate 30th june 2021.pdf21 Jan 2026
Form 2File: form 2 Engineer Certificate 30th june 2021.pdf21 Jan 2026
Form 3File: 11 July 2021.pdf21 Jan 2026
Disclosure of Sold and Booked InventoryFile: 12 jul 2021.pdf21 Jan 2026
Self-declaration of Quarterly ProgressFile: 11 jun 2021.pdf21 Jan 2026
Form 1File: form 1 Architect Certificate 30th sept 2021.pdf21 Jan 2026
Form 2File: form 2 Engineer Certificate 30th sept 2021.pdf21 Jan 2026
Form 3File: 12 Oct 2021.pdf21 Jan 2026
Disclosure of Sold and Booked InventoryFile: 13 oct 21.pdf21 Jan 2026
Self-declaration of Quarterly ProgressFile: 12 sep 2021.pdf21 Jan 2026
Form 1File: form 1 Architect Certificate 31st dec 2021.pdf21 Jan 2026
Form 2File: form 2 Engineer Certificate 31st dec 2021.pdf21 Jan 2026
Form 3File: 13 Jan 2022.pdf21 Jan 2026
Disclosure of Sold and Booked InventoryFile: 14 jan 2022.pdf21 Jan 2026
Self-declaration of Quarterly ProgressFile: 13 dec 2021.pdf21 Jan 2026
Form 1File: form 1 Architect Certificate 31st March 2022.pdf21 Jan 2026
Form 2File: form 2 Engineer Certificate 31st March 2022.pdf21 Jan 2026
Form 3File: 14 April 2022.pdf21 Jan 2026
Disclosure of Sold and Booked InventoryFile: 15 apr 2022.pdf21 Jan 2026
Self-declaration of Quarterly ProgressFile: 14 mar 2022.pdf21 Jan 2026
Form 1File: form 1 Architect Certificate 30th june 2022.pdf21 Jan 2026
Form 2File: form 2 Engineer Certificate 30th june 2022.pdf21 Jan 2026
Form 3File: 15 July 2022.pdf21 Jan 2026
Disclosure of Sold and Booked InventoryFile: 16 jul 2022.pdf21 Jan 2026
Self-declaration of Quarterly ProgressFile: 15 jun 2022.pdf21 Jan 2026
Form 1File: form 1 Architect Certificate 30th sept 2022.pdf21 Jan 2026
Form 2File: form 2 Engineer Certificate 30th sept 2022.pdf21 Jan 2026
Form 3File: 16 Oct 2022.pdf21 Jan 2026
Disclosure of Sold and Booked InventoryFile: 17 oct 2022.pdf21 Jan 2026
Self-declaration of Quarterly ProgressFile: 16 sept 2022.pdf21 Jan 2026
Form 1File: form 1 Architect Certificate 31st dec 2022.pdf21 Jan 2026
Form 2File: form 2 Engineer Certificate 31st dec 2022.pdf21 Jan 2026
Form 3File: 17 Jan 2023.pdf21 Jan 2026
Disclosure of Sold and Booked InventoryFile: 18 jan 2023.pdf21 Jan 2026
Self-declaration of Quarterly ProgressFile: 17 dec 2022.pdf21 Jan 2026
Form 1File: form 1 Architect Certificate 31st March 2023.pdf21 Jan 2026
Form 2File: form 2 Engineer Certificate 31st March 2023.pdf21 Jan 2026
Form 3File: 18 April 2023.pdf21 Jan 2026

How this compares with Sindhudurg

35%of this project is bookeddistrict median 15%
21%of Sindhudurg projects moved their completion datethis one moved by 50 months
30%of Sindhudurg registrations have lapsed or been cancelledthis one is among them

Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.

Keep Sai Pushpa on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kudal St Stand530+ in Sindhudurg

2 kmSai PushpaCompleted 18Lapsed / revoked 12Other 26Dot size: filed unitsN

Filed coordinates, straight-line distance. 56 registered projects within 2 km.

Builder: Sai Ganesh Enterprises

Sai Ganesh Enterprises has 3 registrations on MahaRERA, including Sai Pushpa and Sai Mauli. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sindhudurg district page.

Frequently asked questions

What does it mean that Sai Pushpa shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Sai Pushpa is delayed beyond 31 May 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sai Pushpa?

The registered promoter entity is Sai Ganesh Enterprises, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sai Pushpa?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sai Pushpa?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sai Pushpa?

The professionals named in the filing: Architect: Rupesh N Tawate; Engineer: Madhukar S Shirsat; Engineer: Anil B Chogule; Chartered Accountant: Dinesh Humane; Chartered Accountant: A Mahesh Shashikant Bhagat. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sai Pushpa?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sai Pushpa. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sai Pushpa to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.