Home / Browse projects / Raigarh, Maharashtra / Sai Proviso County

Completed No litigation declared Residential / Group Housing project

Sai Proviso County

By Proviso Builders and Developers

RG-MH-08411 · RERA P51700002042 · Last updated on MahaRERA portal: 11 Jan 2024

Source: official MahaRERA filing

Red flags

  • 4 complaints at MahaRERA
  • Completion date moved by 30 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2023Possession promisedregistration recorded completed
52 of 99Construction stages doneacross 9 buildings; furthest along: Internal walls, 99%
4Complaints at MahaRERAon this registration
Jump to the 147 documents Report an error

Sai Proviso County is a Residential / Group Housing project by Proviso Builders and Developers in Raigarh, Maharashtra, registered with MahaRERA as P51700002042 on 31 Jul 2017. The registration is recorded completed; possession was promised by 31 Dec 2023. The completion date has moved by 30 months from the original filing. 4 complaints are on record with the regulator.

At a glance

Project

  • NameSai Proviso County
  • TypeResidential / Group Housing
  • Location
    • Mumbai Goa Highway
    • Panvel
    • Shirdhon
    • Raigarh
    • 410221
  • Pincode410221
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700002042
  • ReraGenie IDRG-MH-08411

Builder

  • NameProviso Builders and Developers
  • Entity typeOthers
  • GSTIN27AAKFP0856D1Z9
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersSanjay Motilal Gawande, Brij Acchru Ram Gupta, Suman Brij Gupta
  • Named personsM/s proviso builders and developers, M/s Sai proviso Developers
  • Other registrations2 more →
  • Completed3 of 3
  • Declared earlier projects6 →

Key dates

this monthRegisteredJul 2017First promiseJun 2021Revised toDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on31 Jul 2017
  • Promised completion31 Dec 2023
  • Revised completionRevised to 31 Dec 2023 (originally 30 Jun 2021)
  • Buildings9 building records
  • Documents filed147 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CarolNA60000
CrystalNA60000
DaisyNA60000
EbonyNA60000
FernNA60000
HazelNA60000
IrisNA60000
OceanaNA60000
Club ErosNA30000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building9

As on 11 Jan 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

52 of 99 construction stages are filed complete across 9 buildings. The stage furthest along is Internal walls, at 99%.

Carol85%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
Crystal85%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
Daisy85%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
Ebony85%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
Fern84%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.97%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
Hazel85%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
Iris85%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
Oceana85%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
Club Eros0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 11 Jan 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed856

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots856
Closed/Covered856
BuildingClosed/CoveredTotal
Carol139139
Crystal162162
Daisy132132
Ebony5252
Fern4242
Hazel145145
Iris7878
Oceana106106

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area20,600 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
SAI PROVISO DEVELOPERSNavi Mumbai (M Corp.)Thane

Approvals and building plan

Permissible FSI20557.13
Proposed, not sanctioned14,059 sq m
Buildings approved9
Buildings sanctioned8

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop no 10, 11 ,12 plot no 3, sector-16, sanpada

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRajesh R C
EngineerSamarth Agarwal
PartnerRole in project
Proviso Builders and Developers-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000008478Jun 2021 → Jun 2022

Reason as filed by the promoterNAINA Approvals Got Delayed.

EXT52000013549Jun 2021 → Dec 2023

Reason as filed by the promoterWe hereby apply for extension of registration of project ‘Sai Proviso County Project’ situated at Survey No. 153/1, 153/2, 154/1, 188/2, Village Shirdhon, Taluka Panvel, District Raigad registered with the regulatory authority vide project registration certificate bearing no. P517000002042 which has expired on 30th December, 2022. We are submitting the following documents and information, namely:- 1. Rupees Two Lakhs Six Thousand Only (Rs.2,06,000/-) as fee for extension as provided under sub-rule (3) of Rule 7; 2. The construction of the said Project is completed and we have applied for the f

Complaints filed with MahaRERA4

Case no.ComplainantRespondentFiled
CC006000000089648Ashutosh SahSanjay Gawande07/06/2019
CC12400040Samarendra ParhiProviso Builders and Developers05/09/2024
CC12502167Rekha Parshuram ShindeProviso Builders and Developers30/06/2025
CC12600979Sudha Devendra MishraProviso Builders and Developers23/02/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Mar 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Mar 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 12 May 2023

Documents filed147

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 147 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 County Scanned Copy.pdf11 Jan 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf17 May 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COUNTY_-_CORRIGENDUM.pdf12 May 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: County _OC.pdf5 May 2023
Declaration about Commencement CertificateFile: Form D.pdf13 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A_County.pdf12 Jan 2023
Disclosure of sold/ booked inventoryFile: Cercular 29.pdf12 Jan 2023
Certificates of CA (Form 3)File: Form 3_Dec'22.pdf12 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 20-21.pdf12 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf12 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: County Form II.pdf11 Jan 2023
Certificates of CA (Form 3)File: Form-3_Sep22.pdf11 Jan 2023
Certificates of CA (Form 3)File: Form-3-Dec22.pdf11 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE Sept'21 County.pdf10 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1_Architect Certificate.pdf9 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1.pdf4 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 COUNTY.pdf4 Jan 2023
Certificates of CA (Form 3)File: County Form 3.pdf4 Jan 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Status of Society Formation.pdf21 Nov 2022
Copy of the legal title reportFile: New Title Report.pdf5 Aug 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1_30-06-2022.pdf20 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - County.pdf20 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 19-20 County.pdf20 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A- 20-21 County.pdf20 Jul 2022
Certificates of CA (Form 3)File: Form 3.pdf20 Jul 2022
Details of encumbrancesFile: encumbrance certificate.pdf1 Jul 2022
Certificates of CA (Form 3)File: Form 3_March'22.pdf24 Jun 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1_31-03-2022.pdf31 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf31 May 2022
Certificates of CA (Form 3)File: Form 3 County.pdf31 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1_31-12-2021.pdf7 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer County.pdf7 May 2022
Certificates of CA (Form 3)File: Form III County Dec'21.pdf7 May 2022
Certificates of CA (Form 3)File: Form 3 County Sept'21 new.pdf3 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form I Sept'21.pdf15 Nov 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE Sept'21 County.pdf15 Nov 2021
Certificates of CA (Form 3)File: Form III Sept'21.pdf15 Nov 2021
Details of encumbrancesFile: County Encumbrances letter.pdf4 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 Architect Certificate.pdf12 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE JUNE-2021.pdf12 Aug 2021
Certificates of CA (Form 3)File: County June'21 Form III.pdf12 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: RERA FORM-5 COUNTY 2018-19.pdf28 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: RERA FORM-5 COUNTY 2019-20.pdf25 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 Architect Certificate.pdf15 May 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: County Engineer's Certificate.pdf15 May 2021
Certificates of CA (Form 3)File: County Form III.pdf15 May 2021
OtherFile: AMENITIES SHARING AGREEMENT.pdf18 Mar 2021
Layout approvalFile: Amended layout plan-1.pdf16 Mar 2021
Layout approvalFile: Amended layout plan-2.pdf16 Mar 2021
Layout approvalFile: Amended layout plan-3.pdf16 Mar 2021
Layout approvalFile: Amended layout plan-4.pdf16 Mar 2021
Layout approvalFile: Amended layout plan-5.pdf16 Mar 2021
Layout approvalFile: Amended layout plan-6.pdf16 Mar 2021
Layout approvalFile: Amended layout plan-7.pdf16 Mar 2021
Layout approvalFile: Amended layout plan-8.pdf16 Mar 2021
Layout approvalFile: Amended layout plan-9.pdf16 Mar 2021
Layout approvalFile: Amended layout plan-10.pdf16 Mar 2021
Layout approvalFile: Amended layout plan-11.pdf16 Mar 2021
Layout approvalFile: Amended layout plan-12.pdf16 Mar 2021
Layout approvalFile: Amended layout plan-13.pdf16 Mar 2021
Layout approvalFile: Amended layout plan-14.pdf16 Mar 2021
Layout approvalFile: Amended layout plan-15.pdf16 Mar 2021
Layout approvalFile: Amended layout plan-16.pdf16 Mar 2021
Layout approvalFile: Amended layout plan-17.pdf16 Mar 2021
Layout approvalFile: Amended layout plan-18.pdf16 Mar 2021
Copy of Layout Approval (in case of layout)File: Amended layout plan-1.pdf16 Mar 2021
Copy of Layout Approval (in case of layout)File: Amended layout plan-2.pdf16 Mar 2021
Copy of Layout Approval (in case of layout)File: Amended layout plan-3.pdf16 Mar 2021
Copy of Layout Approval (in case of layout)File: Amended layout plan-4.pdf16 Mar 2021
Copy of Layout Approval (in case of layout)File: Amended layout plan-5.pdf16 Mar 2021
Copy of Layout Approval (in case of layout)File: Amended layout plan-6.pdf16 Mar 2021
Copy of Layout Approval (in case of layout)File: Amended layout plan-7.pdf16 Mar 2021
Copy of Layout Approval (in case of layout)File: Amended layout plan-8.pdf16 Mar 2021
Copy of Layout Approval (in case of layout)File: Amended layout plan-9.pdf16 Mar 2021
Copy of Layout Approval (in case of layout)File: Amended layout plan-10.pdf16 Mar 2021
Copy of Layout Approval (in case of layout)File: Amended layout plan-11.pdf16 Mar 2021
Copy of Layout Approval (in case of layout)File: Amended layout plan-12.pdf16 Mar 2021
Copy of Layout Approval (in case of layout)File: Amended layout plan-13.pdf16 Mar 2021
Copy of Layout Approval (in case of layout)File: Amended layout plan-14.pdf16 Mar 2021
Copy of Layout Approval (in case of layout)File: Amended layout plan-15.pdf16 Mar 2021

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Proviso HeightsPlot No. 179 Sector 17 Ulwe Navi Mumbai-410206135CompletedJun 2016May 2016
Proviso Cornerplot no 224 sector 23 ulwe62CompletedJun 2016Late, Aug 2016
Galaxy Carinaplot no 10 sector 15 Kharghar Navi mumbai89CompletedDec 2015May 2015
Proviso Complexplot no 5 6 7 sector 35 E kharghar navi mumbai159CompletedSep 2014Jul 2013
Galaxy OrionPlot no.50 A Sector -35D Kharghar93CompletedDec 2013Jul 2013
Galaxy NebulaPlot no 220 and 221 sector 10 Kharghar Navi mumbai80CompletedJun 2013Late, Jul 2013

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one moved by 30 months
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sai Proviso County on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Panvel5,900+ in Raigarh

2 kmSai Proviso CountyLapsed / revoked 1Other 12Dot size: filed unitsN

Filed coordinates, straight-line distance. 13 registered projects within 2 km.

Builder: Proviso Builders and Developers

Proviso Builders and Developers has 3 registrations on MahaRERA, including Sai Proviso County and Sai Proviso Sapphire. Its filings disclose 6 earlier MahaRERA projects: declares 4 of 6 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Sai Proviso County is delayed beyond 31 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sai Proviso County?

The registered promoter entity is Proviso Builders and Developers, an others as per the filing. Its GSTIN 27AAKFP0856D1Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sai Proviso County?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Sai Proviso County?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Sai Proviso County?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sai Proviso County?

The professionals named in the filing: Architect: Rajesh R C; Engineer: Samarth Agarwal. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sai Proviso County?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sai Proviso County. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sai Proviso County to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.