ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / SAI Plaza

Registered No litigation declared Others project

SAI Plaza

By SHREE SAI SHAKTI DEVELOPERS

RG-MH-79269 · RERA P51700009309 · Last updated on MahaRERA portal: 19 Sep 2026

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • Completion date moved by 36 months
  • 4 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 36 months from the original
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
65 of 162Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 121 documents Report an error

SAI Plaza is a Others project by SHREE SAI SHAKTI DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700009309 on 22 Aug 2017. Possession is promised by 12 Dec 2026. The completion date has moved by 36 months from the original filing. 97 of the 162 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameSAI Plaza
  • TypeOthers
  • Location
    • new golden nest road
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401105
  • Pincode401105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700009309
  • ReraGenie IDRG-MH-79269

Builder

  • NameSHREE SAI SHAKTI DEVELOPERS
  • Entity typePartnership
  • PartnersRajendra Singh, Sirtaj Chaudhary, Ashish Kadam, Yogesh Rambhiya, Sachin Singh
  • Other registrations1 more →

Key dates

this monthRegisteredAug 2017First promiseDec 2023Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Aug 2017
  • Promised completion12 Dec 2026
  • Revised completionRevised to 12 Dec 2026 (originally 30 Dec 2023)
  • Buildings1 building record
  • Documents filed121 files

Current status

60%97 of 162 units booked
100.0%Work done, per cost certificate

Figures as on 19 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sai PlazaNA24246696162

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Sai Plaza: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 19 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed40

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots40
Closed/Covered34
Open Space6

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,100 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on28 Jul 2025

Approvals and building plan

Sanctioning authoritymira bhayandar muncipal corporation
Permissible FSI9159.75
Proposed, not sanctioned7,821 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchsHOP NO 5 TO 7 BLADE BHAWAN 90 FT ROAD BHAYNDER WEST
Estimated costRs 28.50 cr
Cost incurredRs 28.50 cr
Work done100.0%
BuildingWingEstimatedIncurred
Sai PlazaNARs 25.65 crRs 25.65 cr
-NARs 2.85 crRs 2.85 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDinesh N Patel
ArchitectRajesh B Dubey
EngineerPro Tech Consultants
EngineerVivek Arun singh
Chartered AccountantSanjay K Sharma & Co
Chartered AccountantThar & Co
PartnerRole in project
SHREE SAI SHAKTI DEVELOPERS-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700018083Dec 2023 → Dec 2024

Reason as filed by the promoterProject approval from authority(A wing 3rd to 9th Floor) received on 29th Oct 2021 hence we request you to provide extension till above mentioned date

EXT51700025969Dec 2023 → Jun 2025

Reason as filed by the promoterdue to election the approvals related to project are dealyed

EA30072502239Dec 2023 → Mar 2026

Reason as filed by the promoterDelay in OC by Authorities

EA05092622466Dec 2023 → Dec 2026

Reason as filed by the promoterDear Sir, we respectfully submit that the project has received the Full Occupancy Certificate dated 17/11/2025, and accordingly, we had applied on the MahaRERA portal for updating the project status as completed by uploading the said Occupancy Certificate; however, the application was rejected due to a mismatch in the built-up area, as the sanctioned plan details are not visible on the MahaRERA portal and the built-up area mentioned in the Occupancy Certificate does not tally with the details available on the portal. In this regard, we are enclosing a Declaration regarding the change in the bu

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000429486Abhinavkumar Shobhnath Gupta1. ShriChandrakant D. Mhatre01/03/2024
CC006000000429495Mr Shobhnath Narsingh GuptaShri Chandrakant D. Mhatre01/03/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Aug 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 12 Dec 2026

Documents filed121

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 121 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 December 2025_compressed.pdf19 Sep 2026
Withdrawal Update Form 2File: FORM2 SSSD UPTO 31 December 25 SIGN compressed.pdf19 Sep 2026
Withdrawal Update Form 3File: Form 3 SSSD 31st Dec 25 signed.pdf19 Sep 2026
Building plan approvalFile: 1_compressed.pdf25 Aug 2026
Building plan approvalFile: 2_compressed.pdf25 Aug 2026
Building plan approvalFile: 3.pdf25 Aug 2026
Building plan approvalFile: 4_compressed.pdf25 Aug 2026
Building plan approvalFile: 5_compressed.pdf25 Aug 2026
Withdrawal Update Form 1File: Form 1 December 2025_compressed.pdf25 Aug 2026
Withdrawal Update Form 2File: FORM2 SSSD UPTO 31 December 25 SIGN compressed.pdf25 Aug 2026
Withdrawal Update Form 3File: Form 3 SSSD 31st Dec 25 signed.pdf25 Aug 2026
Form 2A (FY 2025-2026)File: form2A final.pdf25 Aug 2026
Withdrawal Update Form 1File: Form 1 30 september Final.pdf25 Mar 2026
Withdrawal Update Form 1File: Form 1 December 2025_compressed.pdf25 Mar 2026
Withdrawal Update Form 2File: Form2 SSSD UPTO 30th Sep25.pdf25 Mar 2026
Withdrawal Update Form 2File: FORM2 SSSD UPTO 31 December 25 SIGN compressed.pdf25 Mar 2026
Withdrawal Update Form 3File: Form 3 sept 2025 (SSSD) - Signed final (1).pdf25 Mar 2026
Withdrawal Update Form 3File: Form 3 SSSD 31st Dec 25 signed.pdf25 Mar 2026
Form 2A (FY 2024-2025)File: Form 2A SSSD fY 2024-2025.pdf19 Mar 2026
Form 5 (FY 2024-2025)File: FORM-5 (2024-25) SSSD (SIGN).pdf1 Aug 2025
Form 1File: Form1.pdf31 May 2025
Form 2File: FORM2.pdf31 May 2025
Form 3File: FORM3.pdf31 May 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Sold Unsold Inventory.pdf31 May 2025
Declaration in FORM BFile: SSSD FORM B UPDATED.pdf9 Apr 2025
Certificates of CA (Form 3)File: Form 3.pdf11 Feb 2025
Declaration in FORM BFile: Form B.pdf10 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1 SSSD SIGN.pdf10 Feb 2025
Certificates of CA (Form 3)File: Form 3 June 24.pdf10 Feb 2025
Certificates of CA (Form 3)File: Form 3 Sep 24.pdf10 Feb 2025
Certificates of CA (Form 3)File: Form 3 Dec24.pdf10 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 SSSD SIGN.pdf10 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure List Sold Unsold.pdf10 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Signed.pdf10 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf31 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 SSSD sign.pdf31 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 SSSD.pdf31 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 signed.pdf31 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 SSSD.pdf31 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 SSSD.pdf31 Dec 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE LIST SOLD UNSOLD.pdf31 Dec 2024
Layout approvalFile: Layout plan_c.pdf26 Jun 2024
Copy of Layout Approval (in case of layout)File: Layout plan_c.pdf26 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Sai Plaza Updated.pdf26 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf10 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf10 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM2A.pdf10 Jun 2024
Disclosure of sold/ booked inventoryFile: Disclosure Sold Unsold Inventory.pdf10 Jun 2024
Disclosure of sold/ booked inventoryFile: Disclosure Sold Unsold Inventory.pdf10 Jun 2024
Certificates of CA (Form 3)File: SSSD FORM 3 31ST DEC 2023.pdf10 Jun 2024
Certificates of CA (Form 3)File: SSSD FORM 3 31ST MARCH 2024.pdf10 Jun 2024
Building plan approvalFile: 5 Revised.pdf31 May 2024
Building Plan Approval (IOD)File: 5 Revised.pdf31 May 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Sai Plaza Updated 070722.pdf28 May 2024
Layout approvalFile: 3_compressed.pdf29 Dec 2023
Building plan approvalFile: 1_compressed.pdf29 Dec 2023
Building plan approvalFile: 2_compressed.pdf29 Dec 2023
Building plan approvalFile: 4_compressed.pdf29 Dec 2023
Building plan approvalFile: 5_compressed.pdf29 Dec 2023
Copy of Layout Approval (in case of layout)File: 3_compressed.pdf29 Dec 2023
Building Plan Approval (IOD)File: 1_compressed.pdf29 Dec 2023
Building Plan Approval (IOD)File: 2_compressed.pdf29 Dec 2023
Building Plan Approval (IOD)File: 4_compressed.pdf29 Dec 2023
Building Plan Approval (IOD)File: 5_compressed.pdf29 Dec 2023
Declaration in FORM BFile: FORM B rule 3 (4) SSSD.pdf21 Dec 2023
Disclosure of sold/ booked inventoryFile: Disclosure Sold Unsold Inventory.pdf21 Dec 2023
Certificates of CA (Form 3)File: Form 3 30-09-2023_compressed (1).pdf1 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 June, 23 sssd.pdf30 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 Sept23 SSSD.pdf30 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 March,23 sssd.pdf30 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 JUNE, 23 SSSD.pdf30 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 SEPT 23.pdf30 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf18 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf18 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf18 Nov 2023
PAN CardFile: SSSD PAND CARD NEW569.pdf11 Feb 2023
Details of encumbrances concerned to FinanceFile: Emc Legal.pdf11 Feb 2023
Details of encumbrances concerned to LegalFile: Emc Legal.pdf11 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 31-03-2019.pdf11 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 31-03-2020.pdf11 Feb 2023

How this compares with Thane

60%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 36 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAI Plaza on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mira-Bhayandar (M Corp.)7,600+ in Thane

2 kmSAI PlazaCompleted 106Lapsed / revoked 80Other 108Dot size: filed unitsN

Filed coordinates, straight-line distance. 294 registered projects within 2 km.

Builder: SHREE SAI SHAKTI DEVELOPERS

SHREE SAI SHAKTI DEVELOPERS has 2 registrations on MahaRERA, including SAI Plaza and RAMABAI PARADISE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SAI Plaza is delayed beyond 12 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAI Plaza?

The registered promoter entity is SHREE SAI SHAKTI DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAI Plaza?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SAI Plaza?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SAI Plaza?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAI Plaza?

The professionals named in the filing: Architect: Dinesh N Patel; Architect: Rajesh B Dubey; Engineer: Pro Tech Consultants; Engineer: Vivek Arun singh; Chartered Accountant: Sanjay K Sharma & Co; Chartered Accountant: Thar & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAI Plaza?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAI Plaza. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAI Plaza to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.