SAI PALACE

By SAI SHLOK DEVELOPERS

RG-MH-07132 · RERA P52000077254 · Last updated on MahaRERA portal: 28 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
6 of 11Construction stages doneacross 2 buildings; furthest along: Stilt Floor, 90%
17 of 25Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 58 documents Report an error

SAI PALACE is a Mixed project by SAI SHLOK DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000077254 on 31 Jul 2024. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 8 of the 25 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameSAI PALACE
  • TypeMixed
  • Location
    • Plot No - 141
    • Sector - 1
    • Pushpak - Vadghar
    • Vadghar (CT)
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000077254
  • ReraGenie IDRG-MH-07132

Builder

  • NameSAI SHLOK DEVELOPERS
  • Entity typePartnership
  • PartnersSubhakar Dombaya Kotiyan, Abhith Subhakar Kotian

Key dates

this monthRegisteredJul 2024First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Jul 2024
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed58 files

Current status

32%8 of 25 units booked
98.0%Work done, per cost certificate

Figures as on 28 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAI PALACENA5521324

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 28 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete across 2 buildings. The stage furthest along is Stilt Floor, at 90%.

SAI PALACE77%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor90%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.79%
NA Plot Without StructureNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 28 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed5

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots5
Closed/Covered4
Open Space1

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area320 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Dattatray Bhekrya KhadkarKhargharRaigarh

Approvals and building plan

Sanctioning authorityCIDCO
Permissible FSI981.63
Proposed, not sanctioned732 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No - 174, Vashi Mumbai, Plot No - 8 - 1 C, Sector 28, Vashi Navi Mumbai, Maharashtra
Estimated costRs 1.28 cr
Cost incurredRs 1.25 cr
Work done98.0%
BuildingWingEstimatedIncurred
SAI PALACENARs 1.28 crRs 1.25 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectATUL PATEL
EngineerSK ENTERPRISES
EngineerKomal Mahendra Pawar
Chartered AccountantR. B. Singh & Associates
Chartered AccountantM.S Hemant & CO
Chartered AccountantMs Singh Ranjan & Co
PartnerRole in project
SAI SHLOK DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA09122518578Dec 2025 → Dec 2026

Reason as filed by the promoter1) Poor booking response from customer. 2) Because of poor response our work was very slow

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Nov 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Nov 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed58

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 30-06-2026.pdf28 Jul 2026
Withdrawal Update Form 2File: FORM 2 30-06-2026.pdf28 Jul 2026
Withdrawal Update Form 3File: Form 3 30-06-26 Sai Shlok developers.pdf28 Jul 2026
Withdrawal Update Form 1File: Form 1 Sai Shlok Dev 31-03-2026 SIGN.pdf28 May 2026
Withdrawal Update Form 2File: Form 2 Sai Shlok Dev 31-03-2026 sign.pdf28 May 2026
Withdrawal Update Form 3File: Form 3 31-03-26 Sai Shlok developers.pdf28 May 2026
Withdrawal Update Form 1File: Form 1.pdf6 Feb 2026
Withdrawal Update Form 2File: FORM 2 Sai Shlok 31-12-25.pdf6 Feb 2026
Withdrawal Update Form 3File: Form 3 31-12-25 Sai Shlok developers sign.pdf6 Feb 2026
Form 5 (FY 2024-2025)File: FORM 5 Sai Shlok 24-25.pdf24 Jan 2026
Form 2A (FY 2024-2025)File: Form 2A 2024-25.pdf23 Jan 2026
Form 1File: Form 1 30-06-25.pdf28 Nov 2025
Form 2File: Form 2 30-06-25.pdf28 Nov 2025
Form 3File: Form 3 30-06-25 Sai Shlok Developers.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold Unsold 30-06-25.pdf28 Nov 2025
Form 1File: Form 1 30-09-25.pdf28 Nov 2025
Form 2File: Form 2 30-09-25.pdf28 Nov 2025
Form 3File: Form 3 30-09-25 Sai Shlok developers.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold Unsold 30-09-25.pdf28 Nov 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - converted.pdf17 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf17 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf17 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - converted.pdf25 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30 Sai - converted.pdf25 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf25 Dec 2024
Other - LegalFile: Development Agreement.pdf9 Jul 2024
Proforma of Agreement for saleFile: AFS_SAI PALACE_SAI SHLOK DEVELOPERS_15062024.pdf17 Jun 2024
Deviation Report with respect to model copy of AgreementFile: sai shlok deviation report_organized_11zon.pdf17 Jun 2024
Other - TechnicalFile: sai shlok Order - 50.pdf17 Jun 2024
Other - TechnicalFile: CC Verification Mail.pdf17 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Verification Mail.pdf12 Jun 2024
Copy of the legal title reportFile: 1 Copy of the legal title report (48).pdf26 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sai shlok CA certificate for rera_compressed.pdf24 Apr 2024
Details of encumbrances concerned to FinanceFile: Enclumber letter finance.pdf19 Feb 2024
Details of encumbrances concerned to LegalFile: Enclumber letter finance.pdf19 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: bank form a letest update.pdf19 Feb 2024
Other - LegalFile: Sai Shlok Agreement to Lease_11zon.pdf9 Feb 2024
Details of encumbrances concerned to FinanceFile: Enclumber letter legal.pdf3 Feb 2024
Details of encumbrances concerned to LegalFile: Enclumber letter legal.pdf3 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf3 Feb 2024
Declaration about Commencement CertificateFile: Declation Abount cc Form D_9.pdf3 Feb 2024
CERSAI detailsFile: Cersai Declation .pdf3 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disloser of interest form a.pdf3 Feb 2024
Deviation Report with respect to Allotment letterFile: Develation report of allotment.pdf3 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer Certificate .pdf22 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate .pdf6 Dec 2023
Layout approvalFile: plan_11zon.pdf23 Nov 2023
Building plan approval or NA orderFile: Aproved Layout Plan Highlighted.pdf23 Nov 2023
PAN CardFile: pancard firm.pdf23 Nov 2023
PAN CardFile: GST CERTIFICATE.pdf23 Nov 2023
PAN CardFile: ROF CERTIFICATE CERTIFICATE.pdf23 Nov 2023
Details of encumbrances concerned to FinanceFile: ENCLUMBER CERTIFICATE.pdf23 Nov 2023
Details of encumbrances concerned to LegalFile: ENCLUMBER CERTIFICATE.pdf23 Nov 2023
Copy of Layout Approval (in case of layout)File: plan_11zon.pdf23 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: Aproved Layout Plan Highlighted.pdf23 Nov 2023
Declaration in FORM BFile: FORM B DECLARTION.pdf23 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf23 Nov 2023
Proforma of Allotment letterFile: Allottment Letter.pdf23 Nov 2023

How this compares with Raigarh

32%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 12 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAI PALACE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pushpak - Vadghar5,900+ in Raigarh

2 kmSAI PALACECompleted 138Lapsed / revoked 50Other 101Dot size: filed unitsN

Filed coordinates, straight-line distance. 289 registered projects within 2 km.

Builder: SAI SHLOK DEVELOPERS

SAI SHLOK DEVELOPERS has 1 registration on MahaRERA, including SAI PALACE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if SAI PALACE is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAI PALACE?

The registered promoter entity is SAI SHLOK DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAI PALACE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAI PALACE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAI PALACE?

The professionals named in the filing: Architect: ATUL PATEL; Engineer: SK ENTERPRISES; Engineer: Komal Mahendra Pawar; Chartered Accountant: R. B. Singh & Associates; Chartered Accountant: M.S Hemant & CO; Chartered Accountant: Ms Singh Ranjan & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAI PALACE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAI PALACE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAI PALACE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.