Sai Ornate

By Jay Gurudev Construction

RG-MH-20727 · RERA P52000004164 · Last updated on MahaRERA portal: 7 Apr 2023

Source: official MahaRERA filing

Red flags

  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2022Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 53 documents Report an error

Sai Ornate is a Others project by Jay Gurudev Construction in Raigarh, Maharashtra, registered with MahaRERA as P52000004164 on 8 Aug 2017. The registration is recorded completed; possession was promised by 30 Dec 2022. The completion date has moved by 18 months from the original filing.

At a glance

Project

  • NameSai Ornate
  • TypeOthers
  • Location
    • Ulawe
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000004164
  • ReraGenie IDRG-MH-20727

Builder

  • NameJay Gurudev Construction
  • Entity typePartnership
  • PartnersSanjay J Jain, Girish M Matta
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredAug 2017First promiseJun 2021Revised toDec 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on8 Aug 2017
  • Promised completion30 Dec 2022
  • Revised completionRevised to 30 Dec 2022 (originally 30 Jun 2021)
  • Buildings1 building record
  • Documents filed53 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sai OrnateNA150000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

Sai Ornate: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 7 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed16

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots16
Closed/Covered2
Open Space14

Land and ownership6

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area950 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
LandownerVillageDistrict
Krishnabai K BhoirNhaveRaigarh
Vishwas K BhoirNhaveRaigarh
Nandkishor K BhoirNhaveRaigarh
Ganesh K BhoirNhaveRaigarh
Sarita K BhoirNhaveRaigarh
Pratibha K BhoirNhaveRaigarh

Approvals and building plan

Permissible FSI1424.39
Proposed, not sanctioned1,424 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNeel Empress, Plot 92,93, Sector 1F, New Panvel East, Navi Mumbai 410206

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTriarch Design Studio
EngineerAgharkar Consultants
PartnerRole in project
Jay Gurudev Construction-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000010149Jun 2021 → Jun 2022

Reason as filed by the promoterThe Project has been delayed on account of various reasons beyond our control and more particularly due to Lockdown announced on account of pandemic of Covid-19. Due to this unprecedented crises, we have witnessed the reverse migration of labourers and shortage of liquidity in the market. Moreover various private and Government offices have not been working at full strength and the complete supply chain has broken down. It appears that it is going to take a lot of time to normalize the real estate industry.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 6 Jan 2022

Documents filed53

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 17-18.pdf7 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Certificate 222.pdf7 Apr 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4- Sai Ornate.pdf21 Jun 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sai Ornate 3rd Jan 2022.pdf25 May 2022
CERSAI detailsFile: Sai Ornate.pdf25 May 2022
Certificates of CA (Form 3)File: Form 3 Sai Ornate 03rd January 2022_compressed.pdf25 May 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Sai Ornate.pdf6 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sai Ornate Sept 2021.pdf30 Nov 2021
Certificates of CA (Form 3)File: Form 3 Sai Ornate 30th September 2021_compressed.pdf30 Nov 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sai Ornate June 2021.pdf20 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sai Ornate June 2021.pdf20 Aug 2021
Certificates of CA (Form 3)File: Form 3 Sai Ornate 30th June 2021.pdf20 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sai Ornate Dec 2020.pdf5 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sai Ornate Mar 2021.pdf5 Aug 2021
Certificates of CA (Form 3)File: Form 3 Sai Ornate 31st Dec 2020.pdf5 Aug 2021
Certificates of CA (Form 3)File: Form 3 Sai Ornate 31st Mar 2021.pdf5 Aug 2021
Declaration about Commencement CertificateFile: Declaration About Commencement Certifica.pdf29 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 FY 19-20 Sai Ornate.pdf29 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY 20-21 Sai Ornate.pdf29 Jun 2021
Disclosure of sold/ booked inventoryFile: JGC Circular 29.pdf20 May 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sai Ornate Jun 2020_compressed.pdf30 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sai Ornate 30th Sept 2020_compressed.pdf30 Nov 2020
Certificates of CA (Form 3)File: Form 3 Sai Ornate 30th June 2020_compressed.pdf30 Nov 2020
Certificates of CA (Form 3)File: Form 3 Sai Ornate 30th September 2020_compressed.pdf30 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sai Ornate 31st Mar 2020.pdf2 Sep 2020
Certificates of CA (Form 3)File: Form 3 Jay Gurudev 31st Mar 2020_compressed.pdf2 Sep 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Sai Ornate.pdf27 Feb 2020
Certificates of CA (Form 3)File: Form 3 Sai Ornate.pdf26 Feb 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Sai Oranate.pdf11 Jan 2020
Certificates of CA (Form 3)File: Form 3 Sai Ornate.pdf6 Jan 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Sai Ornate.pdf1 Nov 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sai Ornate.pdf16 Sep 2019
Certificates of CA (Form 3)File: FORM 3 Sai Ornate.pdf16 Sep 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sai Ornate.pdf17 Jun 2019
Certificates of CA (Form 3)File: Form 3 - Sai Ornate-compressed.pdf17 Jun 2019
Status of Formation of Legal Entity (Society/Co Op etc.)File: Jay Gurudev Construction 01-04-2018.pdf2 Apr 2018
Certificates of CA (Form 3)File: JGC CA Certificate final.pdf26 Jul 2017
Proforma of Allotment letterFile: Agreement and Allotment JGC.pdf26 Jul 2017
Layout approvalFile: 01 of 03.pdf25 Jul 2017
Layout approvalFile: 02 of 03.pdf25 Jul 2017
Layout approvalFile: 03 of 03.pdf25 Jul 2017
Building plan approvalFile: CC COPY.pdf25 Jul 2017
PAN CardFile: JAY GURUDEV CONSTRUCTION PAN CARD.pdf25 Jul 2017
Copy of the legal title reportFile: JGC SEARCH TITLE.pdf25 Jul 2017
Details of encumbrancesFile: LETERHEAD ENCUMBRANCE.pdf25 Jul 2017
Copy of Layout Approval (in case of layout)File: 01 of 03.pdf25 Jul 2017
Copy of Layout Approval (in case of layout)File: 02 of 03.pdf25 Jul 2017
Copy of Layout Approval (in case of layout)File: 03 of 03.pdf25 Jul 2017
Building Plan Approval (IOD)File: CC COPY.pdf25 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC COPY.pdf25 Jul 2017
Declaration in FORM BFile: FORM B JGC.pdf25 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM -1 ARCHITECT'S CERTIFICATE.pdf25 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: JGC ENGINEER CERTIFICATE.pdf25 Jul 2017

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one moved by 18 months
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sai Ornate on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ulawe5,900+ in Raigarh

2 kmSai OrnateCompleted 77Lapsed / revoked 13Other 60Dot size: filed unitsN

Filed coordinates, straight-line distance. 150 registered projects within 2 km.

Builder: Jay Gurudev Construction

Jay Gurudev Construction has 2 registrations on MahaRERA, including Sai Ornate and Sai Pearl. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Sai Ornate is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sai Ornate?

The registered promoter entity is Jay Gurudev Construction, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sai Ornate?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sai Ornate?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sai Ornate?

The professionals named in the filing: Architect: Triarch Design Studio; Engineer: Agharkar Consultants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sai Ornate?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sai Ornate. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sai Ornate to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.