Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Sai Nakshatra Trrident is a Residential / Group Housing project by JSB Homemakers Private Limited in Palghar, Maharashtra, registered with MahaRERA as P99000032964 on 2 Feb 2022. The registration is recorded completed; possession was promised by 31 Dec 2024.
At a glance
Project
- NameSai Nakshatra Trrident
- TypeResidential / Group Housing
- Location
- NA
- Vasai-Virar City (M Corp)
- Vasai
- Palghar
- 401303
- Pincode401303
- RERA no.P99000032964
- ReraGenie IDRG-MH-95559
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on2 Feb 2022
- Promised completion31 Dec 2024
- Revised completionNone
- Buildings1 building record
- Documents filed80 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Sai Nakshtra Trrident | NA | 24 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 30 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
Sai Nakshtra Trrident: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 30 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed122
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership3
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Vikas N. Vartak HUF | Thane (M Corp.) | Thane |
| Vikas N Vartak | Thane (M Corp.) | Thane |
| Pallavi Vikas Vartak | Thane (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Megha Urbanscapes |
| Engineer | Deepak Kumar Singh |
| Chartered Accountant | Ritesh G Sharma & Co. |
| Partner | Role in project |
|---|---|
| JSB Homemakers Private Limited | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 22 Jan 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 22 Jan 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 22 Jan 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 22 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 23 May 2024
Documents filed80
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Details of encumbrances concerned to FinanceFile: SBLHMUMB0006319- NDC- JSB HOMEMAKERS.pdf | 30 Apr 2025 |
| Details of encumbrances concerned to FinanceFile: SBLHMUMB0006319- NDC- JSB HOMEMAKERS.pdf | 30 Apr 2025 |
| Details of encumbrances concerned to FinanceFile: SBLHMUMB0006319- NDC- JSB HOMEMAKERS.pdf | 30 Apr 2025 |
| Details of encumbrances concerned to LegalFile: SBLHMUMB0006319- NDC- JSB HOMEMAKERS.pdf | 30 Apr 2025 |
| Details of encumbrances concerned to LegalFile: SBLHMUMB0006319- NDC- JSB HOMEMAKERS.pdf | 30 Apr 2025 |
| Details of encumbrances concerned to LegalFile: SBLHMUMB0006319- NDC- JSB HOMEMAKERS.pdf | 30 Apr 2025 |
| SBLHMUMB0006319- NDC- JSB HOMEMAKERS | 29 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A-Trrident-March-25.pdf | 17 Apr 2025 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf | 20 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM5_TRRIDENT_2023_2024.pdf | 14 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Disclsoure of sold Booked Inventory Jun 2024.pdf | 24 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sai Nakshatra Trrident Form 3 March 2024.pdf | 23 May 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Sai Nakshatra Trrident Occupation Certificate - OC.pdf | 23 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 21 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Trrident.pdf | 21 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SAI NAKSHATRA TRIDENT MARCH 2024.pdf | 17 May 2024 |
| Disclosure of sold/ booked inventoryFile: Disclsoure of sold Booked Inventory March 2024.pdf | 3 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Trrident Form 2.pdf | 24 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 2023.pdf | 14 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SAI NAKSHATRA TRRIDENT DEC 2023.pdf | 31 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Disclsoure of sold Booked Inventory Dec 2023.pdf | 31 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form-5_Sai Nakshatra Trrident-22-23.pdf | 13 Jan 2024 |
| Details of encumbrancesFile: Encumbrances_Sai Trrident - Mortgage details -SHFL.pdf | 4 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sai Nakshatra Trrident Sept 23.pdf | 6 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sai Nakshatra Trrident Sept 23.pdf | 2 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SEP 2023.pdf | 27 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Trrident June 2023.pdf | 20 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Trrident Sept 23.pdf | 20 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Trrident June 23.pdf | 19 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Trrident March 23.pdf | 19 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Trrident June 2023.pdf | 19 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sai Nakshatra form 1 JUNE 2023.pdf | 28 Jul 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrances_Sai Trrident - Mortgage details-HFCL.pdf | 2 Jun 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrances_Sai Trrident - Mortgage details-HFCL.pdf | 2 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sai Nakshatra Trrident FEB 2023.pdf | 2 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sai Nakshatra Trrident MAY 2023.pdf | 2 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sai Nakshatra Trrident DEC 2022 NEW.pdf | 2 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sai Nakshatra Trrident FEB 2023.pdf | 2 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Trrident March 23.pdf | 2 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Trrident March 23.pdf | 2 Jun 2023 |
| Disclosure of sold/ booked inventoryFile: Sai Nakshatra Trrident Sales MIS Sept 22.pdf | 2 Jun 2023 |
| Disclosure of sold/ booked inventoryFile: Sai Nakshatra Trrident Sales MIS Dec 22.pdf | 2 Jun 2023 |
| Disclosure of sold/ booked inventoryFile: Sai Nakshatra Trrident Sales MIS March 23.pdf | 2 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Trrident Form 3 OCT 2022.pdf | 2 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 JAN 2023 NEW 1-6.pdf | 2 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 JAN 2023 NEW 7-11.pdf | 2 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JSB Homemakers Pvt Ltd MAR 2023.pdf | 2 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sai Nakshatra Trrident MAY 23.pdf | 2 Jun 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Divyesh Seksaria.pdf | 2 Jun 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A-Sunil Seksaria.pdf | 2 Jun 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form-5_Sai Nakshatra Trrident-21-22.pdf | 17 Dec 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 23 Aug 2022 |
| Disclosure of sold/ booked inventoryFile: Discolsure of Sold booked inventory-Sai Nakshatra Trrident Sales Upload.pdf | 23 Aug 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sai Nakshatra Trrident-Jun 22 Upload.pdf | 23 Aug 2022 |
| Details of encumbrancesFile: Encumbrances_Sai Trrident - Mortgage details-HFCL.pdf | 14 Jul 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sai Nakshatra Trrident Upload.pdf | 7 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Upload.pdf | 7 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold booked inventory-Sai Nakshatra Trrident Sales_31-03-2022 Upload.pdf | 7 Jul 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_Sai Nakshatra Trrident_March 22 Upload.pdf | 7 Jul 2022 |
| Proforma of Allotment letterFile: Trrident Sales Draft Ageement-1-14 Upload.pdf | 7 Jul 2022 |
| Proforma of Allotment letterFile: Trrident Sales Draft Ageement-15-28 Upload.pdf | 7 Jul 2022 |
| Proforma of Allotment letterFile: Trrident Sales Draft Ageement-29-41 Upload.pdf | 7 Jul 2022 |
| Layout approvalFile: 1 Copy of Layout Approval (in case of layout).pdf | 22 Jan 2022 |
| Building plan approvalFile: 1 Building Plan Approval _ NA Order for plotted development.pdf | 22 Jan 2022 |
| PAN CardFile: JSB Home Makers PAN Card.pdf | 22 Jan 2022 |
| Copy of the legal title reportFile: 1 Copy of the legal title report.pdf | 22 Jan 2022 |
| Details of encumbrancesFile: 1 Details of encumbrances.pdf | 22 Jan 2022 |
| Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout).pdf | 22 Jan 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval _ NA Order for plotted development.pdf | 22 Jan 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: 1 Commencement Certificates _ NA Order for plotted development.pdf | 22 Jan 2022 |
| Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate.pdf | 22 Jan 2022 |
| Declaration in FORM BFile: 1 Declaration in FORM B.pdf | 22 Jan 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 22 Jan 2022 |
| CERSAI detailsFile: Clarification Letter for CERSAI Report.pdf | 22 Jan 2022 |
| CERSAI detailsFile: 1 CERSAI Search Report200228575891.pdf | 22 Jan 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 CA Certificate on Project Cost Fund withdrawal (Form 3).pdf | 22 Jan 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 CA Certificate on Project Cost Fund withdrawal (Form 3).pdf | 22 Jan 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 CA Certificate on Project Cost Fund withdrawal (Form 3).pdf | 22 Jan 2022 |
| Proforma of Allotment letterFile: Allotment Letter and agreement for sale.pdf | 22 Jan 2022 |
| Proforma of Allotment letterFile: Declaration for agreement for sale__.pdf | 22 Jan 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 6 other registrations, which the RERA portal never shows together
- All 80 filed documents as one ZIP, foldered, with a manifest
Keep Sai Nakshatra Trrident on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NA3,200+ in Palghar
Mayfair Virar Gardens Cluster-VI
MAYFAIR HOUSING
MAYFAIR VIRAR GARDENS CLUSTER IV
MAYFAIR HOUSING
MAYFAIR VIRAR GARDENS BUILDING NO 17, 18, 19,
MAYFAIR HOUSING
Agarwal Infinity
Laxminarayan Prabhudayal Agarwal
GOKUL HARI ANANTA
Mehta Ventures
GOKUL NAKSHATRA II
JSB HOMEMAKERS PRIVATE LIMITED
See every Palghar project, with the district possession charts
Builder: JSB Homemakers Private Limited
JSB Homemakers Private Limited has 7 registrations on MahaRERA, including Sai Nakshatra Trrident and Nakshatra Aazstha. Its filings disclose 11 earlier MahaRERA projects: declares 10 of 10 past projects completed on time. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if Sai Nakshatra Trrident is delayed beyond 31 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Sai Nakshatra Trrident?
The registered promoter entity is JSB Homemakers Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Sai Nakshatra Trrident?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Sai Nakshatra Trrident?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Sai Nakshatra Trrident?
The professionals named in the filing: Architect: Megha Urbanscapes; Engineer: Deepak Kumar Singh; Chartered Accountant: Ritesh G Sharma & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Sai Nakshatra Trrident?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback