Home / Browse projects / Nagpur, Maharashtra / SAI NAGRI 9

Completed No litigation declared Plotted project

SAI NAGRI 9

By SAIDHAM BUILDERS AND ASSOCIATES

RG-MH-18010 · RERA P50500077184 · Last updated on MahaRERA portal: 31 Jan 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Jul 2029Possession promisedregistration recorded completed
21 of 47Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

SAI NAGRI 9 is a Plotted project by SAIDHAM BUILDERS AND ASSOCIATES in Nagpur, Maharashtra, registered with MahaRERA as P50500077184 on 29 Jul 2024. The registration is recorded completed; possession was promised by 31 Jul 2029. 26 of the 47 units on this registration are recorded sold or booked.

At a glance

Project

  • NameSAI NAGRI 9
  • TypePlotted
  • Location
    • BORKHEDI
    • KHASARA NO 12/1 AND KHASARA NO 12-2 PSK NO 74 BORKHEDI
    • Nagpur (Rural)
    • Nagpur
    • 441108
  • Pincode441108
  • RERA no.P50500077184
  • ReraGenie IDRG-MH-18010

Builder

  • NameSAIDHAM BUILDERS AND ASSOCIATES
  • Entity typePartnership
  • GSTIN27ADRFS8805P1ZZ
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersAMOL VISHVANATHRAO WAIRALE, PRAVEEN SATISH SAHNI, SUDHAKAR VITTHALRAO KOHALE, KRISHNA GOPAL CHANDAK, MADHUSUDAN RAMESH GARG, VIKAS RAMESH GARG, RAJESH SATISH SAHNI, PRAVIN RAMRICH AGRAWAL
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredJul 2024PromisedJul 2029Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on29 Jul 2024
  • Promised completion31 Jul 2029
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed73 files

Current status

55%26 of 47 units booked
31.6%Work done, per cost certificate

Figures as on 31 Jan 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 31 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 31 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area10,053 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Aug 2025

Approvals and building plan

Sanctioning authorityNAGPUR METROPOLITAN REGION DEVELOPMENT AUTHORITY

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC BANK LTD., BESIDES BANK OF INDIA WARDHA ROAD, NAGPUR MAHARASHTRA 440015
Estimated costRs 2.70 cr
Cost incurredRs 85.31 lakh
Work done31.59%
BuildingWingEstimatedIncurred
-NARs 2.70 crRs 85.31 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDhawal Harshe
EngineerDhawal Harshe
Chartered AccountantMJM ASSOCIATES
Chartered AccountantPriyanka Parse
PartnerRole in project
SAIDHAM BUILDERS AND ASSOCIATES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Jul 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Jul 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Jul 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 31 Jan 2026

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: sai nagri 9 form 1.pdf31 Jan 2026
Withdrawal Update Form 2File: sai nagri 9 form 2.pdf31 Jan 2026
Withdrawal Update Form 3File: sai nagri 9 form 3.pdf31 Jan 2026
Completion CertificateFile: completion certificate sainagari 9 (1).pdf31 Jan 2026
Completion CertificateFile: Sai nagri 9 mail verification.pdf31 Jan 2026
Completion CertificateFile: sai nagri 9 form 4.pdf31 Jan 2026
Withdrawal Update Form 1File: Form 1.pdf19 Dec 2025
Withdrawal Update Form 1File: Form 1.pdf19 Dec 2025
Withdrawal Update Form 2File: Form 2.pdf19 Dec 2025
Withdrawal Update Form 2File: Form 2.pdf19 Dec 2025
Withdrawal Update Form 3File: Form 3 April to June 2025 signed updated.pdf19 Dec 2025
Withdrawal Update Form 3File: Form 3 July to September 2025 signed updated.pdf19 Dec 2025
Form 1File: july to sept form 1 2024.pdf6 Oct 2025
Form 2File: FORM 2 july to september.pdf6 Oct 2025
Form 3File: july to sept form 3.pdf6 Oct 2025
Disclosure of Sold and Booked InventoryFile: 1 Disclosure of sold_ booked inventory JULY TO SEPT 24.pdf6 Oct 2025
Form 1File: october to december form 1.pdf6 Oct 2025
Form 2File: 3 Engineer’s Certificate on Cost Incurred on Project (Form 2) (1) october to december.pdf6 Oct 2025
Form 3File: withdrawal (Form 3) oct to dec.pdf6 Oct 2025
Disclosure of Sold and Booked InventoryFile: 2 Disclosure of sold_ booked inventory oct to dec 2024.pdf6 Oct 2025
Form 1File: Form 1.pdf14 Aug 2025
Form 2File: Form 2.pdf14 Aug 2025
Form 3File: Form 3.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: sai nagari-9.pdf14 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf26 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf26 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf26 Apr 2025
Disclosure of sold/ booked inventoryFile: sai nagari-9.pdf26 Apr 2025
Disclosure of sold/ booked inventoryFile: DSBI_Oct-Dec 24.pdf24 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf10 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf5 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf3 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: sai nagri 9 Form1 Q 20 JULY 2024 to 30 SEP 2024.pdf17 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: sai nagari 9 Form 3 Q July to Sep 2024_compressed.pdf17 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: sai nagari 9 form 2 Q 29 JULY 2024 to 30 SEP 2024.pdf17 Dec 2024
Disclosure of sold/ booked inventoryFile: sai nagri 9 booked inve Q 29 JULY 2024 to 30 SEP 2024).pdf17 Dec 2024
CERSAI detailsFile: CERSAI Report.pdf4 Jul 2024
CERSAI detailsFile: Undertaking For CERSAI.pdf4 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised Form 3.pdf4 Jul 2024
Proforma of Agreement for saleFile: AFS.pdf4 Jul 2024
Proforma of Allotment letterFile: Allotment Letter.pdf4 Jul 2024
Deviation Report with respect to model copy of AgreementFile: No Deviation AFS.pdf4 Jul 2024
Layout approvalFile: MAp_.pdf3 Jul 2024
Building plan approval or NA orderFile: MAp_.pdf3 Jul 2024
PAN CardFile: Pan Saidham Associate .pdf3 Jul 2024
Copy of the legal title reportFile: Search Report _REVISED.pdf3 Jul 2024
Details of encumbrances concerned to FinanceFile: Nil Financial Encumberance.pdf3 Jul 2024
Details of encumbrances concerned to FinanceFile: Nil Legal Encumberance.pdf3 Jul 2024
Details of encumbrances concerned to LegalFile: Nil Financial Encumberance.pdf3 Jul 2024
Details of encumbrances concerned to LegalFile: Nil Legal Encumberance.pdf3 Jul 2024
Copy of Layout Approval (in case of layout)File: MAp_.pdf3 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: MAp_.pdf3 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate_.pdf3 Jul 2024
Declaration about Commencement CertificateFile: Format D.pdf3 Jul 2024
Declaration in FORM BFile: Affidavit promoter.pdf3 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf3 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf3 Jul 2024
Disclosure for secured/unsecured finance availed for the projectFile: Nil Borrowing Declaration_new.pdf3 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Ane A Amol_new.pdf3 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Ane A Praveen Sahani.pdf3 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Ane A_Sudhakar_11zon.pdf3 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Ane Krishna Chandak_4_11zon.pdf3 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Ane A Madhusudhan Garg_2_11zon.pdf3 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Ane A Vikas Garg_3_11zon.pdf3 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Ane Pravin Agrawal_5_11zon.pdf3 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Ane RAjesh Sahani_6_11zon.pdf3 Jul 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: New Bank Declaration_new.pdf3 Jul 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Bankletterhead_new.pdf3 Jul 2024
Deviation Report with respect to Allotment letterFile: No Deviation Al.pdf3 Jul 2024
Other - LegalFile: Sale Deed Compressed.pdf3 Jul 2024
Other - LegalFile: Ownership Declaration.pdf3 Jul 2024
Other - LegalFile: Affidavit Copromoter.pdf3 Jul 2024
Other - TechnicalFile: No Double Registration.pdf3 Jul 2024

How this compares with Nagpur

55%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is completed

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAI NAGRI 9 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KHASARA NO 12/1 AND KHASARA NO 12-2 PSK NO 74 BORKHEDI2,800+ in Nagpur

Builder: SAIDHAM BUILDERS AND ASSOCIATES

SAIDHAM BUILDERS AND ASSOCIATES has 2 registrations on MahaRERA, including SAI NAGRI 9 and Sai Nagri 10. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if SAI NAGRI 9 is delayed beyond 31 Jul 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAI NAGRI 9?

The registered promoter entity is SAIDHAM BUILDERS AND ASSOCIATES, a partnership as per the filing. Its GSTIN 27ADRFS8805P1ZZ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAI NAGRI 9?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAI NAGRI 9?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAI NAGRI 9?

The professionals named in the filing: Architect: Dhawal Harshe; Engineer: Dhawal Harshe; Chartered Accountant: MJM ASSOCIATES; Chartered Accountant: Priyanka Parse. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAI NAGRI 9?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAI NAGRI 9. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAI NAGRI 9 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.