Home / Browse projects / Raigarh, Maharashtra / SAI GREENS
SAI GREENS
RG-MH-25078 · RERA P52000003773 · Last updated on MahaRERA portal: 1 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 137 months past the filed date
- 3 complaints at MahaRERA
- 3 extensions taken
Clear
- No litigation declared
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SAI GREENS is a Residential / Group Housing project by REKHA SUBHASH JAGDALE in Raigarh, Maharashtra, registered with MahaRERA as P52000003773 on 6 Aug 2017. Possession was promised by 31 May 2015 and is now 137 months past that date. 19 of the 24 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete. 3 complaints are on record with the regulator.
At a glance
Project
- NameSAI GREENS
- TypeResidential / Group Housing
- Location
- Kudawe Road
- Bramhan Ali
- Palaspe
- Panvel
- Raigarh
- 410221
- Pincode410221
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000003773
- ReraGenie IDRG-MH-25078
Builder
- NameREKHA SUBHASH JAGDALE
- Entity typeIndividual
- GSTIN27AAIPJ1460B1Z6
- Other registrations2 more →
- No longer live3 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on6 Aug 2017
- Promised completion31 May 2015
- Revised completionRevised to 31 May 2015 (originally 30 Sep 2019)
- Buildings1 building record
- Documents filed78 files
Current status
Figures as on 1 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Laxmi Vishnu Vihar | NA | 5 | 4 | 24 | 0 | 24 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 1 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
Laxmi Vishnu Vihar: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 1 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed14
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Laxmi Vishnu Vihar | NA | Rs 2.55 cr | Rs 2.55 cr |
| - | NA | Rs 40.49 lakh | Rs 40.49 lakh |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Navnath L Gole |
| Engineer | Ram Marathe |
| Chartered Accountant | Ashok T Upadhye |
| Partner | Role in project |
|---|---|
| REKHA SUBHASH JAGDALE | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe work is nearing completion as per the approved Development permission Ref No. CIDCO/NAINA/PANVEL/Palaspe/BP-44/CC/2017/73 dated 03.02.2017. This permission was issued based on Interim Draft Development Plan and Draft Development Control & Promotion Rules & Regulations dated 07.11.2016. And as per that draft interim DP Rules we had been deprived off our legitimate eligible FSI of approx. 250 sq. mtr. as the area used for Staircase, Lobbies etc. was not excluded from the usable area and hence there was reduction in the usable area approved by NAINA at that time. But however subsequently the
Reason as filed by the promoterThe construction work is substantially suffered and delayed due to COVID 19 Lockdown, non-availability of Labor & Staff, Construction Material etc. Hence the extension is required to complete the balance work as per existing approved plan and give possession to the existing flat buyers AND also to do the proposed additional construction as per proposed revised plan after getting the approval of the concerned authorities. Further the marketing/sale of Balance flat/inventory is also to be done which is becoming difficult day by day due to COVID 19 lockdown and slow down in the real estate market
Reason as filed by the promoterThe work is behind the schedule due to technical issues regarding the road connectivity to the project. The connecting road to the project plot was encroached by the attached neighboring plot owners by construction of unauthorized structures, illegal extention of their compound wall etc. We had to take this matter of encroachment to CIDCO/NAINA, & Palaspe Grampanchayat. After follow-up with CIDCO/NAINA & Palaspe Grampanchayat now said encroachment is removed and the road connectivity to the project is restored. After this removal of road encroachment now work at the site is in full progress. T
Complaints filed with MahaRERA3
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000209690 | बिल्डर कडून फसवणूक | Rekha Subhash Jagdale | 02/03/2022 |
| CC006000000396909 | Jitendra Dattaram Mugurdekar | Rekha Jagdale | 07/09/2023 |
| CC12503668 | Jitendra Dattaram Mugurdekar | REKHA SUBHASH JAGDALE | 15/10/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Oct 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed78
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Architect Cert Sai Greens Palaspe 31 March 2025.pdf | 1 May 2026 |
| Withdrawal Update Form 1File: Form 1 Architect Cert Sai Greens Palaspe 31 March 2025.pdf | 1 May 2026 |
| Withdrawal Update Form 1File: Form 1 Sai Greens 30 June 2025 compressed.pdf | 1 May 2026 |
| Withdrawal Update Form 1File: Form 1 Sai Greens 30 Sept 2025 compressed.pdf | 1 May 2026 |
| Withdrawal Update Form 1File: Form 1 Sai Greens 31 Dec 2025 compressed.pdf | 1 May 2026 |
| Withdrawal Update Form 2File: Form 2 Sai Greens 31 March 2025 compressed.pdf | 1 May 2026 |
| Withdrawal Update Form 2File: Form 2 Sai Greens 31 March 2025 compressed.pdf | 1 May 2026 |
| Withdrawal Update Form 2File: Form 2 Sai Greens 30 June 2025 compressed.pdf | 1 May 2026 |
| Withdrawal Update Form 2File: Form 2 Sai Greens 30 Sept 2025 compressed.pdf | 1 May 2026 |
| Withdrawal Update Form 2File: Form 2 Sai Greens 31 Dec 2025 compressed.pdf | 1 May 2026 |
| Withdrawal Update Form 3File: Form 3 Sai Greens 31 March 2025 compressed.pdf | 1 May 2026 |
| Withdrawal Update Form 3File: Form 3 Sai Greens 31 March 2025 compressed.pdf | 1 May 2026 |
| Withdrawal Update Form 3File: Form 3 Sai Greens 30 June 2025 compressed.pdf | 1 May 2026 |
| Withdrawal Update Form 3File: Form 3 Sai Greens 30 June 2025 compressed.pdf | 1 May 2026 |
| Withdrawal Update Form 3File: Form 3 Sai Greens 31 Dec 2025 compressed.pdf | 1 May 2026 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Cert 31 March 2025.pdf | 27 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engr Cert Sai Greens 31 March 2025 Compressed.pdf | 27 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arct Cert Sai Greens LVV 31 Dec 2024.pdf | 21 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 Sai Greens 31 Dec 2024 Compressed.pdf | 21 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engr Cert Sai Greens LVV 31 Dec 2024.pdf | 21 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Sai Greens 31 March 2024.pdf | 21 Feb 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A June 24 Format Declaration Sai Greens.pdf | 11 Nov 2024 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: UBI Letter RERA Accounts Opening Sai Greens.pdf | 11 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Archt Cert Sai Greens 31 March 24.pdf | 13 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engr Cert as on 31 March 24 Compressed.pdf | 13 Aug 2024 |
| Certificates of CA (Form 3)File: Form 3 Sai Greens March 2024-compressed.pdf | 13 Aug 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Sai Greens March 2024.pdf | 13 Aug 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Sai Greens March 2024.pdf | 13 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate 31 Jan 2024.pdf | 3 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate 31 Jan 2024.pdf | 3 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Inventory disclosure 31 Jan 2024 Sai Greens.pdf | 3 Mar 2024 |
| Certificates of CA (Form 3)File: Form 3 CA Cert 31 Jan 2024 Sai Greens compressed.pdf | 3 Mar 2024 |
| Declaration in FORM BFile: Form B Notorized Declaration Compresssed.pdf | 2 Dec 2023 |
| Certificates of CA (Form 3)File: Form 3 Revised CA Cert 31 March 2023 Sai Greens.pdf | 1 Dec 2023 |
| Certificates of CA (Form 3)File: Form 3 Revised CA Cert 14 Sept 2023 Sai Greens.pdf | 1 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 CA Certificate 31 March 2023.pdf | 1 Dec 2023 |
| Layout approvalFile: Amendment Approved CC Drawings Compressed 1 Sept 2023.pdf | 30 Oct 2023 |
| Details of encumbrances concerned to FinanceFile: Legal Declaration Sai Greens.pdf | 30 Oct 2023 |
| Details of encumbrances concerned to LegalFile: Legal Declaration Sai Greens.pdf | 30 Oct 2023 |
| Copy of Layout Approval (in case of layout)File: Amendment Approved CC Drawings Compressed 1 Sept 2023.pdf | 30 Oct 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Amendment Permission CC dt 1st Sept 2023 Compressed.pdf | 30 Oct 2023 |
| Declaration about Commencement CertificateFile: Format D Declaration Sai Greens.pdf | 30 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architects Certificate 31 March 2023.pdf | 30 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architects Certificate 14 Sept 2023.pdf | 30 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Cert 31 March 2023.pdf | 30 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Cert 14 Sept 2023.pdf | 30 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Sai Greens 2020.pdf | 30 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Sai Greens 2021.pdf | 30 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Sai Greens 2022.pdf | 30 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Sai Greens 2023.pdf | 30 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Inventory List.pdf | 30 Oct 2023 |
| Certificates of CA (Form 3)File: Form 3 CA Cert 14 Sept 2023 Sai Greens Compressed.pdf | 30 Oct 2023 |
| Certificates of CA (Form 3)File: Form 3 CA Cert 31 March 2023 Sai Greens compressed.pdf | 30 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 CA Certificate FY Ended on 31 March 22.pdf | 5 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Sai Greens Form 5 CA Cert 2020.pdf | 8 Aug 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Sai Greens Form 5 CA Cert 2021.pdf | 8 Aug 2022 |
| Certificates of CA (Form 3)File: LVV Form 3 Revised March 2017.pdf | 3 Dec 2019 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: LVV Form 5 CA Certificate March 2018.pdf | 3 Dec 2019 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: LVV Form 5 CA Certificate March 2019.pdf | 3 Dec 2019 |
| Layout approvalFile: NAINA Approved Drawing 1.PDF | 27 Jul 2017 |
| Building plan approvalFile: NAINA Approved Drawing 2.PDF | 27 Jul 2017 |
| Building plan approvalFile: NAINA Approved Drawing 3.pdf | 27 Jul 2017 |
| Building plan approvalFile: NAINA Approved Drawing 1.PDF | 27 Jul 2017 |
| PAN CardFile: Rekha Jagdale PAN Card.pdf | 27 Jul 2017 |
| Copy of the legal title reportFile: Title Certificate.pdf | 27 Jul 2017 |
| Details of encumbrancesFile: letter of emcumbrances.pdf | 27 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: NAINA Approved Drawing 1.PDF | 27 Jul 2017 |
| Building Plan Approval (IOD)File: NAINA Approved Drawing 1.PDF | 27 Jul 2017 |
| Building Plan Approval (IOD)File: NAINA Approved Drawing 2.PDF | 27 Jul 2017 |
| Building Plan Approval (IOD)File: NAINA Approved Drawing 3.pdf | 27 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: Cidco CC compressed.pdf | 27 Jul 2017 |
| Declaration in FORM BFile: LVV Declaration Form B.pdf | 27 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: LVV_Architect Certificate.pdf | 27 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: LVV_Engineer Certificate.pdf | 27 Jul 2017 |
| Certificates of CA (Form 3)File: CA form3.pdf | 27 Jul 2017 |
| Proforma of Allotment letterFile: LVV RERA Agreement for Sale.pdf | 27 Jul 2017 |
| Proforma of Allotment letterFile: LVV RERA Allotment Letter format.pdf | 27 Jul 2017 |
| OtherFile: Scan.pdf | 27 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 78 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SAI GREENS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bramhan Ali5,900+ in Raigarh
Filed coordinates, straight-line distance. 20 registered projects within 2 km.
ARIHANT ASPIRE PHASE I
ARIHANT ABODE LIMITED
Green Terraces, Godrej City, Panvel
CAROA PROPERTIES LLP
Nexspace, Godrej City, Panvel
CAROA PROPERTIES LLP
The Highlands, Godrej City, Panvel
CAROA PROPERTIES LLP
LA MER ONE
La Mer Homes LLP
Emperia Hill Crest
Emperia Builtcon
See every Raigarh project, with the district possession charts
Builder: REKHA SUBHASH JAGDALE
REKHA SUBHASH JAGDALE has 3 registrations on MahaRERA, including SAI GREENS and SAI GARDENS. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What does it mean that SAI GREENS shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SAI GREENS is delayed beyond 31 May 2015?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SAI GREENS?
The registered promoter entity is REKHA SUBHASH JAGDALE, an individual as per the filing. Its GSTIN 27AAIPJ1460B1Z6 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SAI GREENS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SAI GREENS?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for SAI GREENS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SAI GREENS?
The professionals named in the filing: Architect: Navnath L Gole; Engineer: Ram Marathe; Chartered Accountant: Ashok T Upadhye. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SAI GREENS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback