ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / SAI GANESH

Completed No litigation declared Residential / Group Housing project

SAI GANESH

By ADITYA DEVELOPERS

RG-MH-76492 · RERA P52100050633 · Last updated on MahaRERA portal: 29 Sep 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 16 other registrations.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
8 of 11Construction stages donefurthest along: Basement (if any), 0%
0 of 18Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 110 documents Report an error

SAI GANESH is a Residential / Group Housing project by ADITYA DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100050633 on 21 Apr 2023. The registration is recorded completed; possession was promised by 31 Dec 2026. 18 of the 18 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameSAI GANESH
  • TypeResidential / Group Housing
  • Location
    • KADOLKAR COLONY
    • 5092
    • Talegaon Dabhade (R)
    • Mawal
    • Pune
    • 410507
  • Pincode410507
  • RERA no.P52100050633
  • ReraGenie IDRG-MH-76492

Builder

  • NameADITYA DEVELOPERS
  • Entity typePartnership
  • PartnerDHIRAJ SURENDRA AGARWAL
  • Other registrations16 more →
  • Completed7 of 17
  • No longer live8 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

this monthRegisteredApr 2023PromisedDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on21 Apr 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed110 files

Current status

100%18 of 18 units booked
83.5%Work done, per cost certificate

Figures as on 29 Sep 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAI GANESHNA6618018

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

SAI GANESH: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 29 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area434 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on5 Jun 2025

Approvals and building plan

Sanctioning authorityTalegaon Dabhade Municipal Council
Permissible FSI1155.78
Proposed, not sanctioned1,156 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTALEGAON DABHADE
Estimated costRs 3.10 cr
Cost incurredRs 2.59 cr
Work done83.48%
BuildingWingEstimatedIncurred
SAI GANESHNARs 2.80 crRs 2.33 cr
-NARs 30.00 lakhRs 25.88 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAJIT PANDIT
EngineerSACHIN YADAV
EngineerSHIVAJI PATIL
Chartered AccountantNAVDEEP JINDAL jindal
PartnerRole in project
ADITYA DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Mar 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Mar 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed110

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 110 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: 2A- SAI GANESH.pdf29 Sep 2025
Occupational CertificateFile: Occupancy certificate -Sai Ganesh.pdf23 Jul 2025
Withdrawal Update Form 1File: Form 1.pdf18 Jul 2025
Withdrawal Update Form 2File: Form 2.pdf18 Jul 2025
Withdrawal Update Form 3File: Form 3.pdf18 Jul 2025
Form 1File: FORM 1 Sai Ganesh Jun-24_signed.pdf5 Jun 2025
Form 2File: ANNEXURE B.pdf5 Jun 2025
Form 3File: FORM 3 Sai Ganesh Jun-24_signed.pdf5 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold-Booked Inventory Jun-24_signed.pdf5 Jun 2025
Self-declaration of Quarterly ProgressFile: SDFQPR ADITYA DEVELOPERS 5-6-25.pdf5 Jun 2025
Form 1File: Form 1 Sai Ganesh Sept-24_signed.pdf5 Jun 2025
Form 2File: Form 2 Sai Ganesh Sept-24_signed.pdf5 Jun 2025
Form 3File: Form 3 Sai Ganesh Sept-24_signed.pdf5 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold Sept-24_signed.pdf5 Jun 2025
Self-declaration of Quarterly ProgressFile: SDFQPR ADITYA DEVELOPERS 5-6-25.pdf5 Jun 2025
Form 1File: FORM 1 Sai Ganesh Dec-24_signed.pdf5 Jun 2025
Form 2File: FORM 2 Sai Ganesh Dec-24_signed.pdf5 Jun 2025
Form 3File: FORM 3 Dec-24_signed.pdf5 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold-Booked Inventory Dec-24_signed.pdf5 Jun 2025
Self-declaration of Quarterly ProgressFile: SDFQPR ADITYA DEVELOPERS 5-6-25.pdf5 Jun 2025
Form 1File: FORM 1 Sai Ganesh March_25_signed.pdf5 Jun 2025
Form 2File: FORM 2 Sai Ganesh March_25_signed.pdf5 Jun 2025
Form 3File: FORM 3 Sai Ganesh March_25_signed.pdf5 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold-Booked Inventory March_25_signed.pdf5 Jun 2025
Self-declaration of Quarterly ProgressFile: SDFQPR ADITYA DEVELOPERS 5-6-25.pdf5 Jun 2025
Form 1File: arc cer 11-4-24.pdf5 Jun 2025
Form 2File: Aditya Developers 31-3-24.pdf5 Jun 2025
Form 3File: FORM 3 Mar-24.pdf5 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY MAR.pdf5 Jun 2025
Self-declaration of Quarterly ProgressFile: SDFQPR ADITYA DEVELOPERS 5-6-25.pdf5 Jun 2025
Form 1File: arc cer 30-12-23.pdf5 Jun 2025
Form 2File: Aditya Developers 31-12-23.pdf5 Jun 2025
Form 3File: FORM 3 Dec-23.pdf5 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY DEC.pdf5 Jun 2025
Self-declaration of Quarterly ProgressFile: SDFQPR ADITYA DEVELOPERS 5-6-25.pdf5 Jun 2025
Form 1File: arc cer 30-9-23.pdf5 Jun 2025
Form 2File: Aditya Developers 30-9-23.pdf5 Jun 2025
Form 3File: FORM 3 Sep 23.pdf5 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY SEP.pdf5 Jun 2025
Self-declaration of Quarterly ProgressFile: SDFQPR ADITYA DEVELOPERS 5-6-25.pdf5 Jun 2025
Form 1File: arc cer 30-6-23.pdf5 Jun 2025
Form 2File: Aditya Developers 30-6-23.pdf5 Jun 2025
Form 3File: FORM 3 jun 23.pdf5 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY JUNE.pdf5 Jun 2025
Self-declaration of Quarterly ProgressFile: SDFQPR ADITYA DEVELOPERS 5-6-25.pdf5 Jun 2025
Withdrawal Update Form 1File: FORM 1 Sai Ganesh March_25_signed.pdf5 Jun 2025
Withdrawal Update Form 2File: FORM 2 Sai Ganesh March_25_signed.pdf5 Jun 2025
Withdrawal Update Form 3File: FORM - 3.pdf5 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 24-25.pdf25 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Signed.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 24-25.pdf25 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory March_25.pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf23 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3.pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf23 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOSUREB- SAI GANESH.pdf23 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 signed.pdf21 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sai Ganesh.pdf5 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SAI GANESH SEPT 24.pdf5 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SEPT 24.pdf5 Dec 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE SEPT 2024.pdf5 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf14 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ANNEXURE B.pdf14 Aug 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD.pdf14 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM - 3.pdf14 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aditya Developers 30-6-23.pdf21 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aditya Developers 30-9-23.pdf21 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aditya Developers 31-12-23.pdf21 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aditya Developers 31-3-24.pdf21 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arc cer 30-6-23.pdf26 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arc cer 30-9-23.pdf26 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arc cer 30-12-23.pdf26 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arc cer 11-4-24.pdf26 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 30-6-23.pdf26 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 30-9-23.pdf26 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 31-12-23.pdf26 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 31-3-24.pdf26 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 jun 23.pdf26 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Sep 23.pdf26 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Dec-23.pdf26 Apr 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
ADITYA VIHARPLOT NO 74 75 VIDYA VIHAR COLONY CTS 1722 1723 TALEGAON DABHADE PUNE 41050728CompletedSep 2018Jun 2018

How this compares with Pune

100%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAI GANESH on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near 509213,700+ in Pune

Builder: ADITYA DEVELOPERS

ADITYA DEVELOPERS has 17 registrations on MahaRERA, including NEW EKTA CHS and BORIVALI GULMOHAR TERRACE CHS. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SAI GANESH is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAI GANESH?

The registered promoter entity is ADITYA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAI GANESH?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAI GANESH?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAI GANESH?

The professionals named in the filing: Architect: AJIT PANDIT; Engineer: SACHIN YADAV; Engineer: SHIVAJI PATIL; Chartered Accountant: NAVDEEP JINDAL jindal. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAI GANESH?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAI GANESH. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAI GANESH to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.