ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / Sai Baba Nagar Residential with Shopline Building with A B C Wings

Registered No litigation declared Residential / Group Housing project

Sai Baba Nagar Residential with Shopline Building with A B C Wings

By Shreeji Associates

RG-MH-42270 · RERA P99000015106 · Last updated on MahaRERA portal: 24 Jan 2018

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
0 of 33Construction stages doneacross 3 buildings; furthest along: Excavation, 70%
0Complaints at MahaRERAon this registration
Jump to the 184 documents Report an error

Sai Baba Nagar Residential with Shopline Building with A B C Wings is a Residential / Group Housing project by Shreeji Associates in Palghar, Maharashtra, registered with MahaRERA as P99000015106 on 31 Jan 2018. Possession is promised by 30 Dec 2026.

At a glance

Project

  • NameSai Baba Nagar Residential with Shopline Building with A B C Wings
  • TypeResidential / Group Housing
  • Location
    • Behind Laxmiben Chheda Marg
    • Nallasopara West
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401203
  • Pincode401203
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000015106
  • ReraGenie IDRG-MH-42270

Builder

  • NameShreeji Associates
  • Entity typePartnership
  • PartnersAmit Kanaiyalal Mehta, Anil Manoharlal Sahlot, Atul Amrutlal Patel, Balkrishna Gulabrai Valia, Bhavin Ashok Mehta, Farman Siraj Sopariwala, Bharat Lalchand Rathod, Bharat Lalchand Solanki, Chander Lekhraj Bhatia, Girish Lallubhai Chitalia, Harish Chhotalal Mewada, Jagdish Jaichand Jain and 8 more
  • Other registrations4 more →
  • Completed2 of 5
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredJan 2018PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Jan 2018
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings3 building records
  • Documents filed184 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ANA220000
Wing BNA220000
Wing CNA220000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 24 Jan 2018, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 70%.

Wing A6%
ActivityProgress
Excavation70%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing B6%
ActivityProgress
Excavation70%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 24 Jan 2018, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed117

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots117
Closed/Covered3
Open Space114
BuildingClosed/CoveredOpen SpaceTotal
Wing A15051
Wing B14849
Wing C11617

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area20,230 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI24518.13
Proposed, not sanctioned3,439 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchStation Road Samelpada Sopara Gaon Nallasopara West District Palghar 401203

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectChetan Jagannath Patil
PartnerRole in project
Shreeji Associates-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Jan 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Jan 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Jan 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Jan 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2026

Documents filed184

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 184 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: CA Report 1.pdf24 Jan 2018
Certificates of CA (Form 3)File: CA Report 2.pdf24 Jan 2018
Proforma of Allotment letterFile: Allotment Letter.pdf23 Jan 2018
OtherFile: Self Declaration for proposed three buildings on project land.pdf23 Jan 2018
Layout approvalFile: TILR Plan Survey No 16 and 20.pdf22 Jan 2018
Layout approvalFile: Layout of A and B Wing only.pdf22 Jan 2018
Layout approvalFile: Layout of Survey No 16.pdf22 Jan 2018
Layout approvalFile: Proposed Layout with Buildings Plan Survey No 16 and 20.pdf22 Jan 2018
Building plan approvalFile: Self Declaration for No IOD.pdf22 Jan 2018
PAN CardFile: PAN Card.pdf22 Jan 2018
Copy of the legal title reportFile: Title Certificate - Part 1.pdf22 Jan 2018
Copy of the legal title reportFile: Title Certificate - Part 2.pdf22 Jan 2018
Copy of the legal title reportFile: Title Certificate - Part 1.pdf22 Jan 2018
Copy of the legal title reportFile: Title Certificate - Part 2.pdf22 Jan 2018
Details of encumbrancesFile: Details of Encumbrances.pdf22 Jan 2018
Copy of Layout Approval (in case of layout)File: TILR Plan Survey No 16 and 20.pdf22 Jan 2018
Copy of Layout Approval (in case of layout)File: Layout of A and B Wing only.pdf22 Jan 2018
Copy of Layout Approval (in case of layout)File: Layout of Survey No 16.pdf22 Jan 2018
Copy of Layout Approval (in case of layout)File: Proposed Layout with Buildings Plan Survey No 16 and 20.pdf22 Jan 2018
Building Plan Approval (IOD)File: Self Declaration for No IOD.pdf22 Jan 2018
Commencement Certificates / NA Order for plotted developmentFile: CC - Part 1.pdf22 Jan 2018
Commencement Certificates / NA Order for plotted developmentFile: CC - Part 2.pdf22 Jan 2018
Commencement Certificates / NA Order for plotted developmentFile: CC - Part 3.pdf22 Jan 2018
Commencement Certificates / NA Order for plotted developmentFile: CC - Part 4.pdf22 Jan 2018
Commencement Certificates / NA Order for plotted developmentFile: CC - Part 5.pdf22 Jan 2018
Declaration in FORM BFile: Form B.pdf22 Jan 2018
Declaration in FORM BFile: Form - B.pdf22 Jan 2018
Proforma of Allotment letterFile: Agreement for Sale.pdf22 Jan 2018
OtherFile: Self Declaration for utilisation of FSI TDR.pdf22 Jan 2018
OtherFile: Civil Engineer Report part 1.pdf22 Jan 2018
OtherFile: Civil Engineer Report part 2.pdf22 Jan 2018
OtherFile: Civil Engineer Report part 3.pdf22 Jan 2018
OtherFile: 7 by 12 extract of Survey No 16.pdf22 Jan 2018
OtherFile: Mutation Entry Nos 208 and 785.pdf22 Jan 2018
OtherFile: Mutation Entry Nos 1000 and 1001.pdf22 Jan 2018
OtherFile: Mutation Entry Nos 1002 1005 and 1007.pdf22 Jan 2018
OtherFile: Mutation Entry No 1229 Part 1.pdf22 Jan 2018
OtherFile: Mutation Entry No 1229 Part 2.pdf22 Jan 2018
OtherFile: Mutation Entry No 1229 Part 3.pdf22 Jan 2018
OtherFile: Mutation Entry No 1229 Part 4.pdf22 Jan 2018
OtherFile: Mutation Entry No 1229 Part 5.pdf22 Jan 2018
OtherFile: Mutation Entry No 1229 Part 6.pdf22 Jan 2018
OtherFile: Mutation Entry No 1229 Part 7.pdf22 Jan 2018
OtherFile: N A order S No 16 part 1.pdf22 Jan 2018
OtherFile: N A order S No 16 part 2.pdf22 Jan 2018
OtherFile: Collector Order Survey No 16.pdf22 Jan 2018
OtherFile: S 16 Owners Conveyance Deed Part 1.pdf22 Jan 2018
OtherFile: S 16 Owners Conveyance Deed Part 2.pdf22 Jan 2018
OtherFile: S 16 Owners Conveyance Deed Part 3.pdf22 Jan 2018
OtherFile: S 16 Owners Conveyance Deed Part 4.pdf22 Jan 2018
OtherFile: S 16 Owners Conveyance Deed Part 5.pdf22 Jan 2018
OtherFile: S 16 DA Part 1.pdf22 Jan 2018
OtherFile: S 16 DA Part 2.pdf22 Jan 2018
OtherFile: S 16 DA Part 3.pdf22 Jan 2018
OtherFile: S 16 DA Part 4.pdf22 Jan 2018
OtherFile: S 16 DA Part 5.pdf22 Jan 2018
OtherFile: S 16 DA Part 6.pdf22 Jan 2018
OtherFile: S 16 DA Part 7.pdf22 Jan 2018
OtherFile: S 16 DA Part 8.pdf22 Jan 2018
OtherFile: S 16 DA Part 9.pdf22 Jan 2018
OtherFile: S 16 DA Part 10.pdf22 Jan 2018
OtherFile: S 16 DA Part 11.pdf22 Jan 2018
OtherFile: S 16 DA Part 12.pdf22 Jan 2018
OtherFile: S 16 DA Part 13.pdf22 Jan 2018
OtherFile: S 16 POA Part 1.pdf22 Jan 2018
OtherFile: S 16 POA Part 2.pdf22 Jan 2018
OtherFile: S 16 POA Part 3.pdf22 Jan 2018
OtherFile: S 16 POA Part 4.pdf22 Jan 2018
OtherFile: S 16 POA Part 5.pdf22 Jan 2018
OtherFile: S 16 POA Part 6.pdf22 Jan 2018
OtherFile: S 16 GO Part 1.pdf22 Jan 2018
OtherFile: S 16 GO Part 2.pdf22 Jan 2018
OtherFile: S 16 GO Part 3.pdf22 Jan 2018
OtherFile: S 16 RD part 1.pdf22 Jan 2018
OtherFile: S 16 RD part 2.pdf22 Jan 2018
OtherFile: S 16 RD part 3.pdf22 Jan 2018
OtherFile: 7 by 12 extract plot no 20.pdf22 Jan 2018
OtherFile: Mutation Entry Nos 263 and 675.pdf22 Jan 2018
OtherFile: Mutation Entry Nos 865 and 978.pdf22 Jan 2018
OtherFile: Mutation Entry No 1004.pdf22 Jan 2018

How this compares with Palghar

31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sai Baba Nagar Residential with Shopline Bui on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nallasopara West3,200+ in Palghar

2 kmSai Baba Nagar ResidentiCompleted 35Lapsed / revoked 25Other 68Dot size: filed unitsN

Filed coordinates, straight-line distance. 128 registered projects within 2 km.

Builder: Shreeji Associates

Shreeji Associates has 5 registrations on MahaRERA, including Kumbh Building and GREEN PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if Sai Baba Nagar Residential with Shopline Building with A B C Wings is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sai Baba Nagar Residential with Shopline Building with A B C Wings?

The registered promoter entity is Shreeji Associates, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sai Baba Nagar Residential with Shopline Building with A B C Wings?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sai Baba Nagar Residential with Shopline Building with A B C Wings?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sai Baba Nagar Residential with Shopline Building with A B C Wings?

The professionals named in the filing: Architect: Chetan Jagannath Patil. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sai Baba Nagar Residential with Shopline Building with A B C Wings?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sai Baba Nagar Residential with Shopline Building with A B C Wings. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sai Baba Nagar Residential with Shopline Bui to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.