ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Sai Ashiana

Registered No litigation declared Residential / Group Housing project

Sai Ashiana

By Precons Developments Private Limited

RG-MH-18404 · RERA P51800076588 · Last updated on MahaRERA portal: 13 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2029Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Internal walls, 95%
14 of 18Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 78 documents Report an error

Sai Ashiana is a Residential / Group Housing project by Precons Developments Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800076588 on 18 Jun 2024. Possession is promised by 31 Mar 2029. 4 of the 18 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameSai Ashiana
  • TypeResidential / Group Housing
  • Location
    • St Paul Road
    • Kantawadi scheme
    • Bandra west
    • Andheri
    • Mumbai Suburban
    • 400050
  • Pincode400050
  • RERA no.P51800076588
  • ReraGenie IDRG-MH-18404

Builder

  • NamePrecons Developments Private Limited
  • Entity typeCompany
  • Managing DirectorWayne Dlima
  • DirectorRohit Mahadik
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredJun 2024PromisedMar 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on18 Jun 2024
  • Promised completion31 Mar 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed78 files

Current status

22%4 of 18 units booked
81.2%Work done, per cost certificate

Figures as on 13 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sai AshianaNA9918018

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

Sai Ashiana: 75% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Progress on shared amenities15

As on 13 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes50%
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed25

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots25
Closed/Covered25

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area610 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on5 Jul 2025
LandownerVillageDistrict
Sainath Co-operative Housing Society LimitedBandraMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI1645.92
Proposed, not sanctioned1,642 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBaitul Sharaf, Hill Road, Bandra West Mumbai-400050
Estimated costRs 11.00 cr
Cost incurredRs 8.93 cr
Work done81.18%
BuildingWingEstimatedIncurred
Sai AshianaNARs 10.00 crRs 8.93 cr
-NARs 1.00 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNGM Associates
EngineerU D CHANDE LLP
EngineerArunachaleswar Constructions
Chartered AccountantN H VYAS & CO
Chartered AccountantH. A. Jagasheth & Co.
Chartered AccountantPrashant Gurav & Co
PartnerRole in project
Precons Developments Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2029

Documents filed78

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Sai Ashiana Form 1 Architect Certificate Q4 March 2026.pdf13 Apr 2026
Withdrawal Update Form 1File: Sai Ashiana Form 1 Architect Certificate Q4 March 2026.pdf13 Apr 2026
Withdrawal Update Form 2File: Sai Ashiana Q4 March 2026 Form 2 Engineer Certificate.pdf13 Apr 2026
Withdrawal Update Form 2File: Sai Ashiana Q4 March 2026 Form 2 Engineer Certificate.pdf13 Apr 2026
Withdrawal Update Form 3File: Sai Ashiana Q4 March 2026 Form 3 CA Certificate.pdf13 Apr 2026
Withdrawal Update Form 3File: Sai Ashiana Q4 March 2026 Form 3 CA Certificate.pdf13 Apr 2026
Form 2A (FY 2025-2026)File: Sia Ashiana Form 2A Q4 March 2026.pdf13 Apr 2026
Withdrawal Update Form 1File: Form 1 Architect as on 31 12 2025 Sai Ashiana.pdf12 Jan 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate as on 31 12 2025 Sai Ashiana.pdf12 Jan 2026
Withdrawal Update Form 3File: Form 3 CA Certificate as on 31 12 2025 Sai Ashiana.pdf12 Jan 2026
Withdrawal Update Form 1File: Form 1 September.pdf13 Oct 2025
Withdrawal Update Form 2File: Form 2 September.pdf13 Oct 2025
Withdrawal Update Form 3File: Form 3 September precons.pdf13 Oct 2025
Form 5 (FY 2024-2025)File: Form no 5 LH.pdf9 Oct 2025
Form 1File: Form 1 June Precons.pdf30 Sep 2025
Form 2File: Form 2 June Precons.pdf30 Sep 2025
Form 3File: Form 3 June Precons.pdf30 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold unsold Precons.pdf30 Sep 2025
Form 1File: Form 1 Precons June 2025.pdf15 Jul 2025
Form 2File: Form 2 Precons June 2025.pdf15 Jul 2025
Form 3File: Form 3 Precons June 2025.pdf15 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Precons June 2025.pdf15 Jul 2025
Form 2A (FY 2024-2025)File: Form 2A 2025 Precons.pdf15 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 2025 Precons.pdf8 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (CA) March 2025 Precons Homes.pdf8 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 2025 Precons.pdf8 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold inventories - Precons.pdf8 Apr 2025
Layout approvalFile: iod dec 2024.pdf14 Jan 2025
Building plan approvalFile: Building drawing Dec2024.pdf14 Jan 2025
Copy of Layout Approval (in case of layout)File: iod dec 2024.pdf14 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sai Aashina Form 1 Dec 2024.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sai Aashina Form 3 Dec 2024 New.pdf14 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 2024.pdf14 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Building drawing Dec2024.pdf14 Jan 2025
Disclosure of sold/ booked inventoryFile: Sai Aashina Sold Unsold declaration Dec 2024 (1).pdf14 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: Sai Ashiana New CC upto 7th Floor - issued on 26-11-2024.pdf3 Dec 2024
Layout approvalFile: sai aashiyana layout.pdf19 Nov 2024
Building plan approvalFile: Sai aashiyana Building Plan.pdf19 Nov 2024
Layout approvalFile: sai aashiyana layout.pdf19 Nov 2024
Building plan approvalFile: Sai aashiyana Building Plan.pdf19 Nov 2024
Copy of Layout Approval (in case of layout)File: sai aashiyana layout.pdf19 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Sai aashiyana Building Plan.pdf19 Nov 2024
Copy of Layout Approval (in case of layout)File: sai aashiyana layout.pdf19 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Sai aashiyana Building Plan.pdf19 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sept.pdf30 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sept 24.pdf30 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sept.pdf30 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Plinth CC_signed latest.pdf30 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold inventories Sept.pdf30 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1(revised).pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2(revised).pdf12 Aug 2024
Disclosure of sold/ booked inventoryFile: disclosure of sold-unsold unit.pdf12 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3_compressed.pdf12 Aug 2024
Declaration about Commencement CertificateFile: cc dec.pdf13 Jun 2024
Layout approvalFile: IOD 2024 PLAN.pdf11 Jun 2024
Building plan approvalFile: IOD 2024 PLAN.pdf11 Jun 2024
Copy of Layout Approval (in case of layout)File: IOD 2024 PLAN.pdf11 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD 2024 PLAN.pdf11 Jun 2024
Proforma of Agreement for saleFile: Sale Agreement Proforma10-06-2024.pdf10 Jun 2024
Declaration in FORM BFile: form B notarised_04-06-24.pdf4 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: revised CA cert.pdf4 Jun 2024
CERSAI detailsFile: cresai report .pdf30 May 2024
PAN CardFile: 1 PAN Card.pdf25 May 2024
Copy of the legal title reportFile: 1 Copy of the legal title report.pdf25 May 2024
Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance.pdf25 May 2024
Details of encumbrances concerned to FinanceFile: 2 a Details of encumbrances concerned to Finance.pdf25 May 2024
Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Finance.pdf25 May 2024
Details of encumbrances concerned to LegalFile: 2 a Details of encumbrances concerned to Finance.pdf25 May 2024
Commencement Certificates / NA Order for plotted developmentFile: 1 Commencement Certificates _ NA Order for plotted development.pdf25 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations.pdf25 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 2 Disclosure of Interest in Other Real Estate Organizations.pdf25 May 2024
Proforma of Allotment letterFile: 1 Proforma of Allotment letter.pdf25 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow25 May 2024
Deviation Report with respect to Allotment letterFile: 1 Deviation Report with respect to Allotment letter.pdf25 May 2024
Deviation Report with respect to model copy of AgreementFile: 1 Deviation Report with respect to model copy of Agreement.pdf25 May 2024
Other - LegalFile: 1 Other - Legal.pdf25 May 2024
Other - LegalFile: 2 Other - Legal.pdf25 May 2024
Other - TechnicalFile: 1 Other - Technical.pdf25 May 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationRegisteredStatusPromisedDelivered
Khar Kalpak Co. Op. Hsg. Soc. Ltd.P51800021936Jn. of Khar Pali Road, Mumbai SuburbanAug 2019CompletedJan 2021Late, Aug 2022

How this compares with Mumbai Suburban

22%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sai Ashiana on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kantawadi scheme, Bandra west6,700+ in Mumbai Suburban

Builder: Precons Developments Private Limited

PRECONS DEVELOPMENTS PRIVATE LIMITED has 2 registrations on MahaRERA, including Khar Kalpak Co. Op. Hsg. Soc. Ltd. and Sai Ashiana. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Sai Ashiana is delayed beyond 31 Mar 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sai Ashiana?

The registered promoter entity is Precons Developments Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sai Ashiana?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sai Ashiana?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sai Ashiana?

The professionals named in the filing: Architect: NGM Associates; Engineer: U D CHANDE LLP; Engineer: Arunachaleswar Constructions; Chartered Accountant: N H VYAS & CO; Chartered Accountant: H. A. Jagasheth & Co.; Chartered Accountant: Prashant Gurav & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sai Ashiana?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sai Ashiana. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sai Ashiana to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.