Registration lapsed No litigation declared Residential / Group Housing project

Khar Kalpak Co. Op. Hsg. Soc. Ltd.

By PRECONS DEVELOPMENTS PRIVATE LIMITED

RG-MH-04487 · RERA P51800021936 · Last updated on MahaRERA portal: 9 Jan 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 69 months past the filed date
  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jan 2021Possession promised69 months past this date
8 of 11Construction stages donefurthest along: Basement (if any), 0%
2Complaints at MahaRERAon this registration
Jump to the 52 documents Report an error

Khar Kalpak Co. Op. Hsg. Soc. Ltd. is a Residential / Group Housing project by PRECONS DEVELOPMENTS PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800021936 on 8 Aug 2019. Possession was promised by 31 Jan 2021 and is now 69 months past that date. 2 complaints are on record with the regulator.

At a glance

Project

  • NameKhar Kalpak Co. Op. Hsg. Soc. Ltd.
  • TypeResidential / Group Housing
  • Location
    • 15th Road
    • Jn. of Khar Pali Road
    • Andheri
    • Mumbai Suburban
    • 400052
  • Pincode400052
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800021936
  • ReraGenie IDRG-MH-04487

Builder

  • NamePRECONS DEVELOPMENTS PRIVATE LIMITED
  • Entity typeCompany
  • DirectorSitaram Madanlal Sharma
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

69 months past promisethis monthRegisteredAug 2019PromisedJan 2021

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on8 Aug 2019
  • Promised completion31 Jan 2021
  • Revised completionNone
  • Buildings1 building record
  • Documents filed52 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Khar Kalpak Co Op Hsg Soc LtdNA130000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

Khar Kalpak Co Op Hsg Soc Ltd: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 9 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes95%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsYes95%
Landscaping & Tree PlantingYes95%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes95%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes95%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes95%

Parking filed39

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots39
Closed/Covered37
Open Space2

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area626 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1853.66
Proposed, not sanctioned1,854 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKhar Telephone Exchange, Khar Pali Road, Mumbai - 400052

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectC S Associates
EngineerDwijen Bhatt
EngineerNP Associates
Chartered AccountantH A Jagasheth & Co
PartnerRole in project
PRECONS DEVELOPMENTS PRIVATE LIMITED-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000292457Rajesh SadhwaniPrecons Development Pvt Ltd06/09/2022
CC006000000292568Lal Arjandas SadhawaniPrecons Development Pvt Ltd06/09/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Aug 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Aug 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Aug 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Aug 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 1 Sep 2022

Documents filed52

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Precons-Certificate of Architect (Form 4).PDF9 Jan 2025
Details of encumbrances concerned to FinanceFile: Self Declaration Regarding Encumbrances.pdf21 Mar 2023
Details of encumbrances concerned to LegalFile: Self Declaration Regarding Encumbrances.pdf21 Mar 2023
Declaration about Commencement CertificateFile: FORMAT D DECLARATION ABOUT CC.pdf21 Mar 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory.pdf21 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations.pdf21 Mar 2023
Proforma of Allotment letterFile: Allotment Letter-Proforma-Khar Kalpak.pdf21 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Declaration about separate Bank account.pdf21 Mar 2023
Deviation Report with respect to Allotment letterFile: Deviation Report with respect to Allotment letter (1).pdf21 Mar 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report with respect to model copy of Agreement.pdf21 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineers Cert on QA-Form 2A-19-20.pdf25 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineers Cert on QA-Form 2A-20-21.pdf25 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineers Cert on QA-Form 2A-21-22.pdf25 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineers Cert on QA-Form 2A-22-23part.pdf25 Feb 2023
Certificates of CA (Form 3)File: FORM 3-08-08-19 TO 31-10-2019-Q1.pdf25 Feb 2023
Certificates of CA (Form 3)File: FORM 3-01-11-19 TO 31-01-2020-Q2.pdf25 Feb 2023
Certificates of CA (Form 3)File: FORM 3-01-02-20 TO 30-04-2020-Q3.pdf25 Feb 2023
Certificates of CA (Form 3)File: FORM 3-01-05-20 TO 31-07-2020-Q4.pdf25 Feb 2023
Certificates of CA (Form 3)File: FORM 3 01-08-20 TO 31-10-2020-Q5.pdf25 Feb 2023
Certificates of CA (Form 3)File: FORM 3 01-11-20 TO 31-01-2021-Q6.pdf25 Feb 2023
Certificates of CA (Form 3)File: FORM 3 01-02-21 TO 30-04-2021-Q7.pdf25 Feb 2023
Certificates of CA (Form 3)File: FORM 3 01-05-21 TO 31-07-2021-Q8.pdf25 Feb 2023
Certificates of CA (Form 3)File: FORM 3 01-08-21 TO 31-10-2021-Q9.pdf25 Feb 2023
Certificates of CA (Form 3)File: New FORM 3 01-11-21 TO 31-01-2022-Q10.pdf25 Feb 2023
Certificates of CA (Form 3)File: New FORM 3 01-02-22 TO 30-04-2022-Q11.pdf25 Feb 2023
Certificates of CA (Form 3)File: New FORM 3 01-05-22 TO 31-07-2022-Q12.pdf25 Feb 2023
Certificates of CA (Form 3)File: New FORM 3 01-08-22 TO 31-10-2022-Q13.pdf25 Feb 2023
Certificates of CA (Form 3)File: New FORM 3 01-11-22 TO 31-01-2023-Q14.pdf25 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FINALCA CERTIFICATE PRECON 19-20.pdf25 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FINALCA CERTIFICATE PRECON 20-21.pdf25 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FINALCA CERTIFICATE PRECON 21-22.pdf25 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FINALCA CERTIFICATE PRECON 21-22.pdf25 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2225510_OC_signed.pdf1 Sep 2022
Layout approvalFile: Copy of Layout.pdf5 Aug 2019
Copy of Layout Approval (in case of layout)File: Copy of Layout.pdf5 Aug 2019
Declaration in FORM BFile: Affidavit cum declration Form B.pdf5 Aug 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificates of Engineer (Form 2).pdf5 Aug 2019
Certificates of CA (Form 3)File: CA Certificate - Form 3.pdf5 Aug 2019
Proforma of Allotment letterFile: Proforma of the allotment letter and agreement for sale.pdf5 Aug 2019
Building plan approvalFile: BMC Approved plan page 1.pdf1 Aug 2019
Building plan approvalFile: BMC Approved plan page 2.pdf1 Aug 2019
Building plan approvalFile: IOD - 1.pdf1 Aug 2019
Building plan approvalFile: IOD - 2.pdf1 Aug 2019
PAN CardFile: PRECONS -PAN CARD.pdf1 Aug 2019
Copy of the legal title reportFile: Copy of the legal title report.pdf1 Aug 2019
Details of encumbrancesFile: Details of encumbrances.pdf1 Aug 2019
Building Plan Approval (IOD)File: BMC Approved plan page 1.pdf1 Aug 2019
Building Plan Approval (IOD)File: BMC Approved plan page 2.pdf1 Aug 2019
Building Plan Approval (IOD)File: IOD - 1.pdf1 Aug 2019
Building Plan Approval (IOD)File: IOD - 2.pdf1 Aug 2019
Commencement Certificates / NA Order for plotted developmentFile: KALPAK - Commencement Certificate.pdf1 Aug 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 Architect Certificate.pdf1 Aug 2019

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Khar Kalpak Co. Op. Hsg. Soc. Ltd. on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Jn. of Khar Pali Road6,700+ in Mumbai Suburban

2 kmKhar Kalpak Co. Op. Hsg.Completed 149Lapsed / revoked 97Other 156Dot size: filed unitsN

Filed coordinates, straight-line distance. 402 registered projects within 2 km.

Builder: PRECONS DEVELOPMENTS PRIVATE LIMITED

PRECONS DEVELOPMENTS PRIVATE LIMITED has 2 registrations on MahaRERA, including Khar Kalpak Co. Op. Hsg. Soc. Ltd. and Sai Ashiana. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that Khar Kalpak Co. Op. Hsg. Soc. Ltd. shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Khar Kalpak Co. Op. Hsg. Soc. Ltd. is delayed beyond 31 Jan 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Khar Kalpak Co. Op. Hsg. Soc. Ltd.?

The registered promoter entity is PRECONS DEVELOPMENTS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Khar Kalpak Co. Op. Hsg. Soc. Ltd.?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Khar Kalpak Co. Op. Hsg. Soc. Ltd.?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Khar Kalpak Co. Op. Hsg. Soc. Ltd.?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Khar Kalpak Co. Op. Hsg. Soc. Ltd.?

The professionals named in the filing: Architect: C S Associates; Engineer: Dwijen Bhatt; Engineer: NP Associates; Chartered Accountant: H A Jagasheth & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Khar Kalpak Co. Op. Hsg. Soc. Ltd.?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Khar Kalpak Co. Op. Hsg. Soc. Ltd.. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Khar Kalpak Co. Op. Hsg. Soc. Ltd. to a free account