Home / Browse projects / Mumbai Suburban, Maharashtra / The Waterfront

Registered No litigation declared Commercial project

The Waterfront

By M/s Orbit Developers

RG-MH-35073 · RERA P51800050617 · Last updated on MahaRERA portal: 24 Apr 2026

Source: official MahaRERA filing

Red flags

  • Possession 2 months past the filed date
  • 1 complaint at MahaRERA
  • Completion date moved by 12 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Aug 2026Possession promised2 months past this date
2 of 11Construction stages donefurthest along: Slabs of Super Structure, 98%
84 of 136Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

The Waterfront is a Commercial project by M/s Orbit Developers in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800050617 on 21 Apr 2023. Possession was promised by 31 Aug 2026 and is now 2 months past that date. The completion date has moved by 12 months from the original filing. 52 of the 136 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameThe Waterfront
  • TypeCommercial
  • Location
    • Turner Road
    • Bandra West
    • Bandra
    • Andheri
    • Mumbai Suburban
    • 400050
  • Pincode400050
  • RERA no.P51800050617
  • ReraGenie IDRG-MH-35073

Builder

  • NameM/s Orbit Developers
  • Entity typePartnership
  • PartnerRAJEN DHRUV

Key dates

2 months past promisethis monthRegisteredApr 2023First promiseAug 2025Revised toAug 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Apr 2023
  • Promised completion31 Aug 2026
  • Revised completionRevised to 31 Aug 2026 (originally 31 Aug 2025)
  • Buildings1 building record
  • Documents filed71 files

Current status

38%52 of 136 units booked
95.8%Work done, per cost certificate

Figures as on 24 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
The WaterfrontNA770136136

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 98%.

The Waterfront: 57% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure98%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Progress on shared amenities15

As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes60%
Storm Water DrainsYes30%
Landscaping & Tree PlantingYes40%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes75%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed202

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots202
Closed/Covered202

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,901 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on21 Jul 2025
LandownerVillageDistrict
Jadhwani Infrastructure LLPBandraMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI12834.45
Proposed, not sanctioned5,683 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFORT, MUMBAI
Estimated costRs 82.70 cr
Cost incurredRs 79.19 cr
Work done95.76%
BuildingWingEstimatedIncurred
The WaterfrontNARs 82.70 crRs 79.19 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTHE DESIGN STUDIO
EngineerFARZEEN ABDUL HAMID SAYED
EngineerJACOB BASTYAW DSOUZA
Chartered AccountantNEHALI & CO
PartnerRole in project
M/s Orbit Developers-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800027778Aug 2025 → Apr 2026

Reason as filed by the promoterWith reference to the said subject matter, I/We hereby inform yourselves that the Approvals for the sald project from B.M.C. and further C. C. got delayed. We had to take revised concessions for 20 floors for which the file needed the approval of Hon. Municipal Commissioner sir, as anticipated the process of 45 days took more than 5 months to get concessions approved and further CC. Post concession approval from Hon. Municipal Commissioner sir, to get amended IOD and FCC also took further time. Hence there was no slab casted from July 2024 to Feb 2025. The RCC construction was delayed and henc

EA25042620736Aug 2025 → Aug 2026

Reason as filed by the promoterSubject: Submission of Technical Reasons for Delay in Completion of the Project "The Waterfront" Maha RERA Reg. No. P51800050617 Respected Sir. We, M's Orbit Developers, are the promoters of the real estate project known as "The Waterfront" bearing Maha RERA Registration No. P51800050617. With reference to the said subject matter I/We hereby inform yourselves that the Approvals for the said Project from B.M.C. and further C.C.'s got delayed, hence the delay in Possession and completion of Building Project. We had to get the plans amended from BMC, closure of all instalments is done and the ful

Litigation declared1

CaseCourtStatus
106/2021HIGH COURT MUMBAIConsent Terms Filed

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000500668Devang DaveRajen Dhruv02/06/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Dec 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Dec 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Scanned Architect Certificate Form-1.pdf24 Apr 2026
Withdrawal Update Form 2File: ENGINEER FORM 2 MARCH 26 THE WATERFRONT.pdf24 Apr 2026
Withdrawal Update Form 3File: Form 3 - orbit developers.pdf24 Apr 2026
Withdrawal Update Form 1File: ARCHITECT FORM 1_20260116 19-01-26.pdf13 Apr 2026
Withdrawal Update Form 2File: _THE WATERFRONT FORM 2 oct to dec 25 20-01-26.pdf13 Apr 2026
Withdrawal Update Form 3File: Signred CA Certificate WATERFRONNT Dec 25 20-01-26.pdf13 Apr 2026
Withdrawal Update Form 1File: ARCHITECT FORM 1.pdf4 Dec 2025
Withdrawal Update Form 2File: 1. THE WATERFRONT FORM 2 july to sep 25..pdf4 Dec 2025
Withdrawal Update Form 3File: Signed CA Certificate WATERFRONNT Sept25.pdf4 Dec 2025
Layout approvalFile: IOD approved plan 20 floors The Waterfront_1-3.pdf1 Dec 2025
Layout approvalFile: IOD approved plan 20 floors The Waterfront_4-6.pdf1 Dec 2025
Layout approvalFile: IOD approved plan 20 floors The Waterfront_7-end.pdf1 Dec 2025
Withdrawal Update Form 1File: ARCHITECT FORM 1.pdf13 Nov 2025
Withdrawal Update Form 2File: THE WATERFRONT FORM 2 JUNE 25.pdf13 Nov 2025
Withdrawal Update Form 3File: FORM 3.pdf13 Nov 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf5 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24.pdf5 Apr 2025
Declaration in FORM BFile: Form B (8).pdf28 Feb 2025
Disclosure of sold/ booked inventoryFile: Inventory Chart.pdf28 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf27 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf27 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf25 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf25 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed_CA Certificate WATERFRONNT-dec24.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf6 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect form 1.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf8 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate WATERFRONNT.pdf8 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER -Form 2 THE WATERFONT.pdf21 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: ENGINEER 2A - THE WATERFRONT.pdf21 May 2024
Commencement Certificates / NA Order for plotted developmentFile: 2410043_FurtherCC_signed.pdf10 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf25 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf25 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate 23 Q2.pdf29 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate 23 Q3.pdf29 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate 23 Q4.pdf29 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate April 23 - June23.pdf27 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate July 23 - Sept 23.pdf27 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Oct 23 - Dec 23.pdf27 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed_CA Certificate WATERFRONNT-june'23.pdf27 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed_CA Certificate WATERFRONNT-Sept 23.pdf27 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed_CA Certificate WATERFRONNT-dec'23.pdf27 Feb 2024
Declaration about Commencement CertificateFile: Declaration - CC - Orbit Developers.pdf29 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: 2370503_FurtherCC_signed.pdf28 Mar 2023
Other - TechnicalFile: plan 1.pdf28 Mar 2023
Other - TechnicalFile: plan 2.pdf28 Mar 2023
Other - TechnicalFile: plan 3.pdf28 Mar 2023
Other - TechnicalFile: plan 4.pdf28 Mar 2023
Other - TechnicalFile: plan 5.pdf28 Mar 2023
Building plan approvalFile: 1 Copy of Layout Approval (in case of layout).pdf17 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: 1 Copy of Layout Approval (in case of layout).pdf17 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A dislcosure orbit.pdf17 Jan 2023
CERSAI detailsFile: CERSAI_Search_Report_Asset_Id_Based_Search_05_01_2023_15_17_57_659.pdf7 Jan 2023
Copy of the legal title reportFile: Title Report Final.pdf4 Jan 2023
Layout approvalFile: Approved Drawing the waterfront.pdf19 Dec 2022
Copy of Layout Approval (in case of layout)File: Approved Drawing the waterfront.pdf19 Dec 2022
Proforma of Allotment letterFile: allotment letter.pdf19 Dec 2022
Proforma of Agreement for saleFile: AGREEMENT.pdf19 Dec 2022
Deviation Report with respect to Allotment letterFile: Deviation report Allotment RERA The Wate.pdf19 Dec 2022
Deviation Report with respect to model copy of AgreementFile: Deviation report Agreement RERA The Wate.pdf19 Dec 2022
Details of encumbrances concerned to FinanceFile: Encumbrance certificate legal RERA The Water legal.pdf17 Dec 2022
Details of encumbrances concerned to FinanceFile: encumbrance certificate RERA The Waterfr finance.pdf17 Dec 2022
Details of encumbrances concerned to LegalFile: Encumbrance certificate legal RERA The Water legal.pdf17 Dec 2022
Details of encumbrances concerned to LegalFile: encumbrance certificate RERA The Waterfr finance.pdf17 Dec 2022
Building plan approvalFile: IOD.pdf18 Nov 2022
PAN CardFile: Company pan card.pdf18 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: IOD.pdf18 Nov 2022
Declaration in FORM BFile: Form B promoter.pdf18 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect form 1.pdf18 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA form 3.pdf18 Nov 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: bank details letter.pdf18 Nov 2022

How this compares with Mumbai Suburban

38%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 12 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep The Waterfront on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bandra West6,700+ in Mumbai Suburban

Builder: M/s Orbit Developers

M/s Orbit Developers has 1 registration on MahaRERA, including The Waterfront. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if The Waterfront is delayed beyond 31 Aug 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of The Waterfront?

The registered promoter entity is M/s Orbit Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in The Waterfront?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against The Waterfront?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for The Waterfront?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at The Waterfront?

The professionals named in the filing: Architect: THE DESIGN STUDIO; Engineer: FARZEEN ABDUL HAMID SAYED; Engineer: JACOB BASTYAW DSOUZA; Chartered Accountant: NEHALI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in The Waterfront?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About The Waterfront. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save The Waterfront to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.