Home / Browse projects / Raigarh, Maharashtra / Sai Anant

Registered No litigation declared Residential / Group Housing project

Sai Anant

By Sai Anant Enterprises

RG-MH-06970 · RERA P52000053789 · Last updated on MahaRERA portal: 30 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
8 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 85%
43 of 60Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 92 documents Report an error

Sai Anant is a Residential / Group Housing project by Sai Anant Enterprises in Raigarh, Maharashtra, registered with MahaRERA as P52000053789 on 30 Nov 2023. Possession is promised by 31 Dec 2026. 17 of the 60 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete.

At a glance

Project

  • NameSai Anant
  • TypeResidential / Group Housing
  • Location
    • Takka
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000053789
  • ReraGenie IDRG-MH-06970

Builder

  • NameSai Anant Enterprises
  • Entity typePartnership
  • PartnersAarti Dinesh Nayak, Arvind Laxman Patil Patkar, Dinesh Venkatesh Nayak, Vibhavari Patilpatkar, Vandana Kedar Patil
  • Other registrations1 more →

Key dates

this monthRegisteredNov 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on30 Nov 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed92 files

Current status

28%17 of 60 units booked
67.2%Work done, per cost certificate

Figures as on 30 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A wingNA6625025
B WingNA6635035

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 30 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 85%.

A wing59%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B Wing55%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed42

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots42
Open Space42
BuildingOpen SpaceTotal
A wing2121
B Wing2121

Land and ownership4

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,326 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Jun 2025
LandownerVillageDistrict
Arvind Laxman PatilPanvelRaigarh
Sanjay Moreshwar PotdarPanvelRaigarh
Vibhavari Arvind PatilPanvelRaigarh
Dinesh Venkatesh NayakPanvelRaigarh

Approvals and building plan

Sanctioning authorityPanvel Municipal Corporation
Permissible FSI3648.16
Proposed, not sanctioned3,578 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRAJE COMPLEX, PLOT NO 198A SHIVAJI CHOWK
Estimated costRs 12.50 cr
Cost incurredRs 8.40 cr
Work done67.2%
BuildingWingEstimatedIncurred
B WingNARs 7.32 crRs 5.12 cr
A wingNARs 4.68 crRs 3.28 cr
-NARs 50.00 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDinesh Nayak and Associates
EngineerRahul Sashte and Assosciates
Chartered AccountantR R Jakhotia and Co
Chartered AccountantShripati Gandhi Choudhari & Co.
PartnerRole in project
Sai Anant Enterprises-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Oct 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Nov 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Nov 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed92

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Sai Anant.pdf30 Apr 2026
Withdrawal Update Form 2File: Form 2 Sai Anant.pdf30 Apr 2026
Withdrawal Update Form 3File: Form 3 Mar 26.pdf30 Apr 2026
Withdrawal Update Form 1File: Form 1 - Sai Anant - Dec 25.pdf28 Jan 2026
Withdrawal Update Form 2File: Form 2 - Sai Anant - Dec 25.pdf28 Jan 2026
Withdrawal Update Form 3File: Form 3 - Sai Anant - Dec 25.pdf28 Jan 2026
Withdrawal Update Form 1File: Form 1 - June 25.pdf7 Nov 2025
Withdrawal Update Form 1File: Form 1 - Sept 25.pdf7 Nov 2025
Withdrawal Update Form 2File: Form 2 - June 25.pdf7 Nov 2025
Withdrawal Update Form 2File: Form 2 - Sept 25.pdf7 Nov 2025
Withdrawal Update Form 3File: CA Certificate 15_07_25.pdf7 Nov 2025
Withdrawal Update Form 3File: Form 3 - Sept 25.pdf7 Nov 2025
Form 1File: Architect Certificate 15-04-24.pdf19 Aug 2025
Form 2File: Engineer Certificate 13-04-24.pdf19 Aug 2025
Form 3File: Form 3 CA Certificate.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: Discolsure of sold book inventory.pdf19 Aug 2025
Form 1File: ARCHITECTS CERTIFICATE.pdf19 Aug 2025
Form 2File: ENGINEERS CERTIFICATE - Nov 24.pdf19 Aug 2025
Form 3File: FORM - 3 CA Certificate.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sai Anant Sold Booked Inventory.pdf19 Aug 2025
Form 1File: Architect Certificate - Dec 24.pdf19 Aug 2025
Form 2File: Engineer's Certificate - Dec 24.pdf19 Aug 2025
Form 3File: Form -3 - Dec 24.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: sold Booked Inventory Dec - 24.pdf19 Aug 2025
Withdrawal Update Form 1File: Form 1 - June 25.pdf19 Aug 2025
Withdrawal Update Form 2File: Form 2 - June 25.pdf19 Aug 2025
Withdrawal Update Form 3File: CA Certificate 15_07_25.pdf19 Aug 2025
Form 1File: Form 1 - March 25.pdf23 Jun 2025
Form 2File: Form 2 - March 25.pdf23 Jun 2025
Form 3File: Form 3 - March 25_compressed.pdf23 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Book Inventory - March 25.pdf23 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - March 25_compressed.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - March 25.pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - 08_04_25.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate - Dec 24.pdf23 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Book Inventory 31_03_25.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 - Dec 24.pdf13 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Dec 24.pdf13 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Dec 24.pdf5 Feb 2025
Disclosure of sold/ booked inventoryFile: sold Booked Inventory Dec - 24.pdf5 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE.pdf10 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM - 3 CA Certificate.pdf10 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE - Nov 24.pdf10 Dec 2024
Disclosure of sold/ booked inventoryFile: Sai Anant Sold Booked Inventory.pdf10 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S CERTIFICATE.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE.pdf20 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 15-04-24.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 13-04-24.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Discolsure of sold book inventory.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf5 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf5 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate 2 Promoters Acceptance.pdf5 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA certificate new.pdf24 Nov 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DECLARATION OF SEPARATE BANK AC.pdf24 Nov 2023
Layout approvalFile: 1.pdf1 Nov 2023
Layout approvalFile: 2.PDF1 Nov 2023
Layout approvalFile: 3.PDF1 Nov 2023
Layout approvalFile: 4.pdf1 Nov 2023
Building plan approvalFile: 1.pdf1 Nov 2023
Building plan approvalFile: 2.PDF1 Nov 2023
Building plan approvalFile: 3.PDF1 Nov 2023
Building plan approvalFile: 4.pdf1 Nov 2023
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE FINANCE.pdf1 Nov 2023
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE LEGAL.pdf1 Nov 2023
Details of encumbrances concerned to LegalFile: NO ENCUMBRANCE FINANCE.pdf1 Nov 2023
Details of encumbrances concerned to LegalFile: NO ENCUMBRANCE LEGAL.pdf1 Nov 2023
Copy of Layout Approval (in case of layout)File: 1.pdf1 Nov 2023
Copy of Layout Approval (in case of layout)File: 2.PDF1 Nov 2023
Copy of Layout Approval (in case of layout)File: 3.PDF1 Nov 2023
Copy of Layout Approval (in case of layout)File: 4.pdf1 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: 1.pdf1 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: 2.PDF1 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: 3.PDF1 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf1 Nov 2023
PAN CardFile: sai anant pancard.pdf28 Oct 2023
Copy of the legal title reportFile: Search Report Rera - FP No 4102.pdf28 Oct 2023
Copy of the legal title reportFile: Search Report Rera- FP - 409A.pdf28 Oct 2023

How this compares with Raigarh

28%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sai Anant on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Panvel5,900+ in Raigarh

2 kmSai AnantCompleted 212Lapsed / revoked 57Other 133Dot size: filed unitsN

Filed coordinates, straight-line distance. 402 registered projects within 2 km.

Builder: Sai Anant Enterprises

Sai Anant Enterprises has 2 registrations on MahaRERA, including Sai Anant and SAI NIRMAL RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Sai Anant is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sai Anant?

The registered promoter entity is Sai Anant Enterprises, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sai Anant?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sai Anant?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sai Anant?

The professionals named in the filing: Architect: Dinesh Nayak and Associates; Engineer: Rahul Sashte and Assosciates; Chartered Accountant: R R Jakhotia and Co; Chartered Accountant: Shripati Gandhi Choudhari & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sai Anant?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sai Anant. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sai Anant to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.