Home / Browse projects / Palghar, Maharashtra / SAI ABHYUDAY COMPLEX- GRANDE

Registered No litigation declared Residential / Group Housing project

SAI ABHYUDAY COMPLEX- GRANDE

By ULHAS ANANDJI RAMBHIA

RG-MH-23585 · RERA P99000078897 · Last updated on MahaRERA portal: 15 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Mar 2029Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

SAI ABHYUDAY COMPLEX- GRANDE is a Residential / Group Housing project by ULHAS ANANDJI RAMBHIA in Palghar, Maharashtra, registered with MahaRERA as P99000078897 on 20 Jan 2025. Possession is promised by 31 Mar 2029.

At a glance

Project

  • NameSAI ABHYUDAY COMPLEX- GRANDE
  • TypeResidential / Group Housing
  • Location
    • YASHWANT GAURAV ROAD
    • NEAR FUN FIESTA MALL
    • NILEMORE VILLAGE NALLASOPARA WEST
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401203
  • Pincode401203
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000078897
  • ReraGenie IDRG-MH-23585

Builder

  • NameULHAS ANANDJI RAMBHIA
  • Entity typeIndividual
  • Other registrations1 more →
  • Declared earlier projects2 →

Key dates

this monthRegisteredJan 2025PromisedMar 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Jan 2025
  • Promised completion31 Mar 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed73 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 2 WING ENA2423000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

BUILDING NO 2 WING E: 27% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed63

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots63
Closed/Covered63

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area11,763 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
ULHAS ANANDJI RAMBHIADahisarMumbai Suburban

Approvals and building plan

Sanctioning authorityVASAI VIRAR CITY MUNICIPAL CORPORATION
Permissible FSI12010.99
Proposed, not sanctioned11,763 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP-1, LOTUS APARTMENT, SHRIPRASTHA COMPLEX, NALLASOPARA WEST PALGHAR-401203

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANAT MEHTA AND ASSOCIATES
EngineerSHILPLEKHA ASSOCIATES
EngineerNIKIT UMESH CHUDASAMA
Chartered AccountantN K SUTHAR AND CO
Chartered AccountantMEHUL TRIVEDI
PartnerRole in project
ULHAS ANANDJI RAMBHIA-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Nov 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Nov 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2029

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form1 Architect Cert (JAN-MARCH 2026).pdf15 Apr 2026
Form 2File: Form2 Engineers certificate JAN-MAR 2026.pdf15 Apr 2026
Form 3File: FORM3 GRANDE.pdf15 Apr 2026
Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD.pdf15 Apr 2026
Self-declaration of Quarterly ProgressFile: DECLARATION-QPR-4 JAN-MARCH26.pdf15 Apr 2026
Form 2A (FY 2025-2026)File: FORM 2 A Yr25-26.pdf14 Apr 2026
Form 1File: Form1 Architect Cert (OCT-DEC 2025).pdf16 Jan 2026
Form 2File: Form2 Engineers certificate OCT-DEC 2025.pdf16 Jan 2026
Form 3File: FORM3 GRANDE.pdf16 Jan 2026
Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD.pdf16 Jan 2026
Self-declaration of Quarterly ProgressFile: DECLARATION-QPR-3 OCT-DEC25.pdf16 Jan 2026
Form 1File: Work Complet Letter Grande -JULY-SEPT25.pdf20 Oct 2025
Form 2File: Form2 Engineers certificate JULY-SEPT2025.pdf20 Oct 2025
Form 3File: FORM3 GRANDE.pdf20 Oct 2025
Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD.pdf20 Oct 2025
Self-declaration of Quarterly ProgressFile: DECLARATION-QPR-2 JULY-SEPT25.pdf20 Oct 2025
Form 1File: Form1 Architect Cert Apr-June2025.pdf14 Aug 2025
Form 2File: Form2 Engineers certificate Apr-June2025.pdf14 Aug 2025
Self-declaration of Quarterly ProgressFile: DECLARATION-QPR-1 APR-JUNE25.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD APR-JUN 2025 QPR.pdf14 Aug 2025
Form 3File: FORM3 GRANDE 23-11.pdf14 Aug 2025
Form 2A (FY 2024-2025)File: Form 2A Jan to Mar 2025.pdf19 Jun 2025
Form 1File: ARCHITECT CERTIFICATE- JAN-MARCH 25.pdf11 Jun 2025
Form 2File: engineer certificate- jan-march 25.pdf11 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD.pdf11 Jun 2025
Form 3File: FORM3 GRANDE 23-11.pdf11 Jun 2025
Form 5 (FY 2024-2025)File: FORM 5.pdf11 Jun 2025
Disclosure of sold/ booked inventoryFile: DISCOLSURE OF SOLD.pdf30 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form2 UR-1.pdf10 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: Self Declaration promotor -RDP clarification_rera app.pdf10 Jan 2025
Other - TechnicalFile: Self Declaration promotor -RDP clarification_rera app.pdf10 Jan 2025
Other - TechnicalFile: Self Declaration promotor -APENDIX F.pdf16 Dec 2024
Building plan approvalFile: GetUserDocumentFileContent (23).pdf28 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3 GRANDE 23-11 (1).pdf28 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: GetUserDocumentFileContent (23).pdf28 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: apendix F acknowledgement .pdf22 Nov 2024
Proforma of Allotment letterFile: RERA ALLOTMENT FINAL GRANDE.pdf20 Nov 2024
Building plan approvalFile: WING E GRANDE BUILDING PLAN 1.pdf14 Nov 2024
Layout approvalFile: layout PLAN marked-GRANDE.pdf14 Nov 2024
Copy of Layout Approval (in case of layout)File: layout PLAN marked-GRANDE.pdf14 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: WING E GRANDE BUILDING PLAN 1.pdf14 Nov 2024
Deviation Report with respect to Allotment letterFile: Deviation Draft ALLOTMENT Promotor.pdf14 Nov 2024
Proforma of Agreement for saleFile: RERA AGREEMENT FINAL GRANDE.pdf14 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate 15-10-2024.pdf12 Nov 2024
Other - LegalFile: 7-12 extract-27-7-23.pdf12 Nov 2024
Copy of the legal title reportFile: Grande -Title Report Final.pdf23 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A- BASSEIN CATHOLIC.pdf23 Oct 2024
Other - FinanceFile: DECLARATION-FLAT RESERVED-SOCIETY OFFICE.pdf23 Oct 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Draft agreement Promotor.pdf23 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: APPENDIX F.pdf19 Oct 2024
Other - LegalFile: gift deed ULHAS A RAMBHIA.pdf19 Oct 2024
Other - LegalFile: Legal Heirship Main.pdf19 Oct 2024
Other - LegalFile: LAND CONVAYANCE.pdf19 Oct 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B-FINAL.pdf19 Oct 2024
Building plan approvalFile: BUILDING BLUEPRINT PLAN-GRANDE.pdf16 Oct 2024
Details of encumbrances concerned to FinanceFile: Self Declaration promotor encrumbances.pdf16 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: BUILDING BLUEPRINT PLAN-GRANDE.pdf16 Oct 2024
CERSAI detailsFile: CRESAI REPORT LATEST.pdf16 Oct 2024
Details of encumbrances concerned to LegalFile: Self Declaration promotor encrumbances.pdf16 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: DECLARATION-SECURED UNSECURED LOAN.pdf16 Oct 2024
Other - TechnicalFile: Anexure A promoter declaration.pdf13 Oct 2024
Building plan approvalFile: NA ORDER.pdf11 Oct 2024
Layout approvalFile: layout.pdf11 Oct 2024
PAN CardFile: PAN CARD.pdf11 Oct 2024
Copy of Layout Approval (in case of layout)File: layout.pdf11 Oct 2024
Declaration in FORM BFile: Mou Ulhas Rambhia.pdf11 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: RDP dt 03 01 2022.pdf11 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: revalidation CC RECEIPT vp-0132.pdf11 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: NA ORDER.pdf11 Oct 2024
Declaration about Commencement CertificateFile: Declaration form d- cc.pdf11 Oct 2024
Other - FinanceFile: rera Txn account Statement.pdf11 Oct 2024
Other - TechnicalFile: Detils of Encumbrances plot 265 .pdf11 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCOLSURE OF INTREST REAL ESTATE PROJECT.pdf11 Oct 2024

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
SAI ABHYUDAY COMPLEX WING E and FSAI ABHYUDAY COMPLEX YASHWANT GAURAV ROAD NILEMORE NALASOPARA WEST64CompletedJun 2027Feb 2024
SAI ABHYUDAY COMPLEXSAI ABHYUDAY COMPLEX YASHWANT GAURAV ROAD NILEMORE NALASOPARA WEST32CompletedJan 2020Late, Feb 2020

How this compares with Palghar

31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAI ABHYUDAY COMPLEX- GRANDE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NILEMORE VILLAGE NALLASOPARA WEST3,200+ in Palghar

2 kmSAI ABHYUDAY COMPLEX- GRCompleted 37Lapsed / revoked 28Other 110Dot size: filed unitsN

Filed coordinates, straight-line distance. 175 registered projects within 2 km.

Builder: ULHAS ANANDJI RAMBHIA

ULHAS ANANDJI RAMBHIA has 2 registrations on MahaRERA, including SAI ABHYUDAY COMPLEX WING E and F and SAI ABHYUDAY COMPLEX- GRANDE. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if SAI ABHYUDAY COMPLEX- GRANDE is delayed beyond 31 Mar 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAI ABHYUDAY COMPLEX- GRANDE?

The registered promoter entity is ULHAS ANANDJI RAMBHIA, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAI ABHYUDAY COMPLEX- GRANDE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAI ABHYUDAY COMPLEX- GRANDE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAI ABHYUDAY COMPLEX- GRANDE?

The professionals named in the filing: Architect: SANAT MEHTA AND ASSOCIATES; Engineer: SHILPLEKHA ASSOCIATES; Engineer: NIKIT UMESH CHUDASAMA; Chartered Accountant: N K SUTHAR AND CO; Chartered Accountant: MEHUL TRIVEDI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAI ABHYUDAY COMPLEX- GRANDE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAI ABHYUDAY COMPLEX- GRANDE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAI ABHYUDAY COMPLEX- GRANDE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.