Completed No litigation declared Residential / Group Housing project

SAHIL CO.OP. HOUSING SOCIETY

By ARCHWAY PROPERTIES

RG-MH-86211 · RERA P52100047922 · Last updated on MahaRERA portal: 29 Sep 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 2 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
6 of 11Construction stages donefurthest along: External plumbing and external plaster, 98%
3 of 3Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 82 documents Report an error

SAHIL CO.OP. HOUSING SOCIETY is a Residential / Group Housing project by ARCHWAY PROPERTIES in Pune, Maharashtra, registered with MahaRERA as P52100047922 on 1 Dec 2022. The registration is recorded completed; possession was promised by 31 Dec 2025. The completion date has moved by 12 months from the original filing. 0 of the 3 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameSAHIL CO.OP. HOUSING SOCIETY
  • TypeResidential / Group Housing
  • Location
    • AUNDH
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411007
  • Pincode411007
  • RERA no.P52100047922
  • ReraGenie IDRG-MH-86211

Builder

  • NameARCHWAY PROPERTIES
  • Entity typePartnership
  • GSTIN27ABGFA2219J1ZK
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersDILIP BALKRISHNA DESHPANDE, SAMEER DEEPAK JOSHI
  • Other registrations8 more →
  • Completed5 of 9
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredDec 2022First promiseDec 2024Revised toDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on1 Dec 2022
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 31 Dec 2024)
  • Buildings1 building record
  • Documents filed82 files

Current status

0%0 of 3 units booked

Figures as on 29 Sep 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAHIL COOP HOUSING SOCIETYNA70303

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 98%.

SAHIL COOP HOUSING SOCIETY: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 29 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes70%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes50%
Energy managemcntYes30%
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes30%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed52

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots52
Closed/Covered52

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area988 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
ARCHWAY PROPERTIESPune (M Corp.)Pune
SAHIL CO.OP. HOUSING SOCIETYPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI2213.12
Proposed, not sanctioned1,314 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLBS ROAD

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCHITALE JOG ASSOCIATES
EngineerKALPAK CONSTRUCTIONS
Chartered AccountantCHANDORKAR & LIMAYE CHARTERED ACCOUNTANTS
Chartered AccountantAshish Awati
PartnerRole in project
ARCHWAY PROPERTIES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100027621Dec 2024 → Dec 2025

Reason as filed by the promoterInitially the building was planned for six floors, however due to excess FSI availability on account of TOD(Transit Oriented Development) Zone, seventh floor got sanctioned which resulted in delay of completion. Due to the additional floor fit-puzzle parking also had to be increased. Also, electrical work , sanitary and painting work are pending which will require the extended period to get completed. We want to extend the project completion date from 31st December 2024 to 31st December 2025. Kindly consider this matter.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Aug 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed82

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: Sahil Form 5 24-25.PDF29 Sep 2025
Occupational CertificateFile: SAHIL Occupancy certificate.pdf18 Aug 2025
Occupational CertificateFile: SAHIL FORM 4 FROM ARCHITECT.PDF18 Aug 2025
Form 1File: SAHIL ARCHITECT FORM 1.PDF19 Jul 2025
Form 2File: SAHIL ENGINEER FORM 2.PDF19 Jul 2025
Form 3File: Sahil Signed form 3.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: SAHIL SALES INVENTORY.PDF19 Jul 2025
Self-declaration of Quarterly ProgressFile: QPR SAHIL.PDF19 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sahil Society architect form 1.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sahil Form 3 Signed_.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sahil Society Rera engineer form 2.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Sahil Society Rera sales inventory.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: archway sahil co form 3.pdf3 Feb 2025
Disclosure of sold/ booked inventoryFile: sold-unsold(sahil).pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sahil form 1.pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sahil form 2.pdf23 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ARCHWAY SAHIL FORM 3_compressed.pdf18 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ARCHWAY SAHIL FORM 3_compressed.pdf18 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: ARCHWAY PROPERTIES SAHIL FORM 5.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf22 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf22 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf22 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sahil Form 3Q4 FY 23-24_compressed.pdf22 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form 1 Sahil.pdf13 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer FORM 2 Sahil.pdf13 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Sahil.pdf28 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sahil.pdf24 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sahil Rera Architect Form 1.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sahil Rera Engineer FORM 2.pdf19 Jan 2024
Disclosure of sold/ booked inventoryFile: Sahil Rera Sales Inventory.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sahil Form 3 30-9-23.pdf30 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sahil Form 1 Architect.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sahil Form 2 Engineers.pdf20 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Sahil FORM 5.pdf5 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Comp.pdf8 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf8 Sep 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration.pdf8 Sep 2023
Other - FinanceFile: ANNEXURE A.pdf8 Sep 2023
Layout approvalFile: 3102_compressed.pdf19 Aug 2023
Layout approvalFile: 3103.pdf19 Aug 2023
Layout approvalFile: doc07760020230809203250.pdf19 Aug 2023
Copy of Layout Approval (in case of layout)File: 3102_compressed.pdf19 Aug 2023
Copy of Layout Approval (in case of layout)File: 3103.pdf19 Aug 2023
Copy of Layout Approval (in case of layout)File: doc07760020230809203250.pdf19 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf19 Aug 2023
Disclosure of sold/ booked inventoryFile: Sahil Sales Inventory 08072023.pdf19 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf21 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf21 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Form 3 Sahil.pdf26 Apr 2023
Disclosure of sold/ booked inventoryFile: sahil Rera Sales inventory.pdf19 Apr 2023
Disclosure of sold/ booked inventoryFile: Sahil Society sale Inventory 31323.pdf19 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sahil Society Form 1 31323.pdf15 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sahil Society FORM 2 31323.pdf15 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sahil Park.pdf18 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archway Properties Sahil Form 1.pdf17 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Archway Properties Sahil Form 2.pdf17 Jan 2023
Proforma of Agreement for saleFile: Model AFSSahil 231122.pdf24 Nov 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Report 231122.pdf24 Nov 2022
Other - LegalFile: Sahil convecance deed-1-5_compressed.pdf3 Nov 2022
Other - LegalFile: Sahil convecance deed-6-9.pdf3 Nov 2022
Other - LegalFile: Sahil convecance deed-10-12.pdf3 Nov 2022
Details of encumbrances concerned to LegalFile: sahil legal encumbrances.pdf28 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf2 Sep 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Archway Properties Bank Account Declaration.pdf2 Sep 2022
Disclosure of sold/ booked inventoryFile: Sahil Rera Inventory sale list.pdf27 Aug 2022
Proforma of Allotment letterFile: Sahil Rera Allotment letter_compressed.pdf27 Aug 2022
Deviation Report with respect to Allotment letterFile: Allotment DEVIATION Certificate rera Sahil.pdf27 Aug 2022
Layout approvalFile: Sanction Plan sheet 1 Sahil_compressed_compressed.pdf4 Aug 2022
Building plan approvalFile: Sahil N A ORDER.pdf4 Aug 2022
PAN CardFile: ARCH PROP PAN.pdf4 Aug 2022
PAN CardFile: Pan Card Bharat Kakodkar Sahil Society.pdf4 Aug 2022
Copy of the legal title reportFile: Sahil Society Title Report_compressed.pdf4 Aug 2022
Details of encumbrances concerned to FinanceFile: Self Declaration.pdf4 Aug 2022
Copy of Layout Approval (in case of layout)File: Sanction Plan sheet 1 Sahil_compressed_compressed.pdf4 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: Sahil N A ORDER.pdf4 Aug 2022
Commencement Certificates / NA Order for plotted developmentFile: Sahil C omeancement_compressed.pdf4 Aug 2022
Declaration about Commencement CertificateFile: Sahil Commencent Declaration.pdf4 Aug 2022
Declaration in FORM BFile: Self Declaration.pdf4 Aug 2022
Declaration in FORM BFile: Co Owner Affidavit Sahil_compressed.pdf4 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sahil Arch Rera Certificate.pdf4 Aug 2022

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
MOHAN APARTMENTSSADASHIV PETH PUNE 41103018CompletedSep 2022Jul 2021
JAYSHREE APARTMENTSS NO 720 CTS NO 177 PLOT NO 1 NAVI PETH PUNE 3012CompletedDec 2018Nov 2018

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAHIL CO.OP. HOUSING SOCIETY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AUNDH13,700+ in Pune

Builder: ARCHWAY PROPERTIES

ARCHWAY PROPERTIES has 9 registrations on MahaRERA, including JAYSHREE APARTMENTS PHASE I and MOHAN APARTMENT PHASE I. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SAHIL CO.OP. HOUSING SOCIETY is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAHIL CO.OP. HOUSING SOCIETY?

The registered promoter entity is ARCHWAY PROPERTIES, a partnership as per the filing. Its GSTIN 27ABGFA2219J1ZK can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAHIL CO.OP. HOUSING SOCIETY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAHIL CO.OP. HOUSING SOCIETY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAHIL CO.OP. HOUSING SOCIETY?

The professionals named in the filing: Architect: CHITALE JOG ASSOCIATES; Engineer: KALPAK CONSTRUCTIONS; Chartered Accountant: CHANDORKAR & LIMAYE CHARTERED ACCOUNTANTS; Chartered Accountant: Ashish Awati. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAHIL CO.OP. HOUSING SOCIETY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAHIL CO.OP. HOUSING SOCIETY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAHIL CO.OP. HOUSING SOCIETY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.