SAHEJANAND
RG-MH-18359 · RERA P52000076845 · Last updated on MahaRERA portal: 5 Aug 2026
Source: official MahaRERA filing
Red flags
- Completion date moved by 17 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SAHEJANAND is a Others project by Prasad Construction in Raigarh, Maharashtra, registered with MahaRERA as P52000076845 on 28 Jun 2024. The registration is recorded completed; possession was promised by 30 Nov 2026. The completion date has moved by 17 months from the original filing. 0 of the 14 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.
At a glance
Project
- NameSAHEJANAND
- TypeOthers
- Location
- Sector - 1
- Pushpak New
- Vadghar (CT)
- Panvel
- Raigarh
- 410206
- Pincode410206
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000076845
- ReraGenie IDRG-MH-18359
Builder
- NamePrasad Construction
- Entity typePartnership
- PartnersBhagchand Chuwadmal Khubchandani, Anil Thakarshi Thakkar
- Other registrations2 more →
- Completed3 of 3
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on28 Jun 2024
- Promised completion30 Nov 2026
- Revised completionRevised to 30 Nov 2026 (originally 30 Jun 2025)
- Buildings1 building record
- Documents filed75 files
Current status
Figures as on 5 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SAHEJANAND | NA | 5 | 5 | 12 | 2 | 14 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 5 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 95%.
SAHEJANAND: 77% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 73% |
Progress on shared amenities15
As on 5 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 80% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed4
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SAHEJANAND | NA | Rs 92.86 lakh | Rs 89.92 lakh |
| - | NA | Rs 4.89 lakh | Rs 4.73 lakh |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Atul Patel Architects |
| Engineer | SK Consultants & Engineers |
| Chartered Accountant | Rutuja Narsingh & Associates |
| Partner | Role in project |
|---|---|
| Prasad Construction | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe, Prasad Construction, hereby declare the following with respect to the project Sahejanand bearing registration number P52000076845. registered under MahaRERA. The delay in the completion of the real estate project has been primarily caused by a delay in OC. The project is 100% completed, and we have received the Occupation Certificate (OC) on 17/02/2026 and we have also initiated the process for the possession as well. In view of this as the said project obtained full OC uploading consents from allottees will not be required. To provide assurance and facilitate a smooth completion process,
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 May 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 18 May 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 May 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed75
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 - Sahejanand as on June 2025.pdf | 5 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 - Sahejanand as on June 2025.pdf | 5 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 - Sahejanand as on June 2025.pdf | 5 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 - Sahejanand as on June 2025.pdf | 5 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 - Sahejanand as on June 2025.pdf | 5 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 - Sahejanand as on June 2025.pdf | 5 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 - Sahejanand as on June 2025.pdf | 5 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 - Sahejanand as on June 2025.pdf | 5 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 - Sahejanand as on June 2025.pdf | 5 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 - Sahejanand as on June 2025.pdf | 5 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 - Sahejanand as on June 2025.pdf | 5 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 - Sahejanand as on June 2025.pdf | 5 Aug 2026 |
| Form 2A (FY 2026-2027)File: Form 2A_25-26.pdf | 5 Aug 2026 |
| Occupational CertificateFile: Occupancy Certificate.pdf | 5 Aug 2026 |
| Occupational CertificateFile: OC Plan Highlighted.pdf | 5 Aug 2026 |
| Occupational CertificateFile: OC Verification Mail Screenshot.pdf | 5 Aug 2026 |
| Occupational CertificateFile: Commencement Certificate.pdf | 5 Aug 2026 |
| Occupational CertificateFile: CC Plan.pdf | 5 Aug 2026 |
| Form 2A (FY 2024-2025)File: Form 2A_24-25.pdf | 1 Aug 2026 |
| Form 2A (FY 2025-2026)File: Form 2A_25-26.pdf | 1 Aug 2026 |
| Form 5 (FY 2024-2025)File: Form 5 2024-25_.pdf | 1 Aug 2026 |
| Form 5 (FY 2025-2026)File: Form 5 2024-25_.pdf | 1 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 - Sahejanand as on June 2025.pdf | 11 Oct 2025 |
| Withdrawal Update Form 2File: Form 2 - Sahejanand as on June 2025.pdf | 11 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 - Sahejanand as on June 2025.pdf | 11 Oct 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - June 2024.pdf | 24 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sep 2024.pdf | 24 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Dec 2024.pdf | 24 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - March 2025.pdf | 24 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - June 2024.pdf | 24 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sep 2024.pdf | 24 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Dec 2024.pdf | 24 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - March 2025.pdf | 24 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Sahejanand_30-06-2024.pdf | 20 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Sahejanand_30-09-2024.pdf | 20 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sahejanand as on Dec 2024.pdf | 20 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sahejanand as on March 2025.pdf | 20 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sahejanand as on 30th June 2024.pdf | 18 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sahejanand as on 30th September 2024.pdf | 18 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sahejanand as on 31st December 2024.pdf | 18 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sahejanand as on 31st March 2025.pdf | 18 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sahejanand as on June 2024.pdf | 18 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sahejanand as on Sep 2024.pdf | 18 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sahejanand as on Dec 2024.pdf | 18 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sahejanand as on March 2025.pdf | 18 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Sahejanand_Dec 2024.pdf | 16 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Sahejanand March 2025.pdf | 16 Apr 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Verification.pdf | 7 Jun 2024 |
| Copy of the legal title reportFile: 1 Copy of the legal title report.pdf | 29 May 2024 |
| Proforma of Allotment letterFile: Rera Allotment-Plot No83-Pushpak.pdf | 29 May 2024 |
| Deviation Report with respect to Allotment letterFile: Deviation Report_Allotment Letter.pdf | 29 May 2024 |
| Deviation Report with respect to model copy of AgreementFile: AFS Deviation-Sahejanand.pdf | 29 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final First Form 3 - Sahejanand.pdf | 23 May 2024 |
| Proforma of Agreement for saleFile: Final AFS-Sahejanand.pdf | 23 May 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A - Separate Bank Account Details.pdf | 23 May 2024 |
| Details of encumbrances concerned to FinanceFile: Letter of encumbrance finance.pdf | 21 May 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrance letter Legal.pdf | 21 May 2024 |
| Details of encumbrances concerned to LegalFile: Letter of encumbrance finance.pdf | 21 May 2024 |
| Details of encumbrances concerned to LegalFile: Encumbrance letter Legal.pdf | 21 May 2024 |
| Declaration about Commencement CertificateFile: Declaration about CC_Format D.pdf | 21 May 2024 |
| Declaration in FORM BFile: form B_11zon.pdf | 21 May 2024 |
| CERSAI detailsFile: Cersai Declaration.pdf | 21 May 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: output.pdf | 21 May 2024 |
| Other - LegalFile: Lease Deed_11zon.pdf | 21 May 2024 |
| Other - LegalFile: Tiparty Agreement_11zon.pdf | 21 May 2024 |
| Other - LegalFile: Partnership_Deed_Prasad_Construction.pdf | 21 May 2024 |
| Other - TechnicalFile: Annotation 2024-05-29 153608.pdf | 21 May 2024 |
| Layout approvalFile: Plot 83 layout_11zon.pdf | 18 May 2024 |
| Building plan approvalFile: Plot 83 layout_11zon.pdf | 18 May 2024 |
| PAN CardFile: Prasad Construction - PAN Copy.pdf | 18 May 2024 |
| Copy of Layout Approval (in case of layout)File: Plot 83 layout_11zon.pdf | 18 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Plot 83 layout_11zon.pdf | 18 May 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: EXPIRED -Commencement Certificate.pdf | 18 May 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Revalidate CC.pdf | 18 May 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: PCC Inward.pdf | 18 May 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 75 filed documents as one ZIP, foldered, with a manifest
Keep SAHEJANAND on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Pushpak New5,900+ in Raigarh
Filed coordinates, straight-line distance. 37 registered projects within 2 km.
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: Prasad Construction
Prasad Construction has 3 registrations on MahaRERA, including Prasad Nagar and Komal. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if SAHEJANAND is delayed beyond 30 Nov 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SAHEJANAND?
The registered promoter entity is Prasad Construction, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SAHEJANAND?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SAHEJANAND?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SAHEJANAND?
The professionals named in the filing: Architect: Atul Patel Architects; Engineer: SK Consultants & Engineers; Chartered Accountant: Rutuja Narsingh & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SAHEJANAND?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback