Home / Browse projects / Raigarh, Maharashtra / SAHEJANAND

Completed No litigation declared Others project

SAHEJANAND

By Prasad Construction

RG-MH-18359 · RERA P52000076845 · Last updated on MahaRERA portal: 5 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 17 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Nov 2026Possession promisedregistration recorded completed
6 of 11Construction stages donefurthest along: External plumbing and external plaster, 95%
14 of 14Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

SAHEJANAND is a Others project by Prasad Construction in Raigarh, Maharashtra, registered with MahaRERA as P52000076845 on 28 Jun 2024. The registration is recorded completed; possession was promised by 30 Nov 2026. The completion date has moved by 17 months from the original filing. 0 of the 14 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameSAHEJANAND
  • TypeOthers
  • Location
    • Sector - 1
    • Pushpak New
    • Vadghar (CT)
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000076845
  • ReraGenie IDRG-MH-18359

Builder

  • NamePrasad Construction
  • Entity typePartnership
  • PartnersBhagchand Chuwadmal Khubchandani, Anil Thakarshi Thakkar
  • Other registrations2 more →
  • Completed3 of 3

Key dates

this monthRegisteredJun 2024First promiseJun 2025Revised toNov 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on28 Jun 2024
  • Promised completion30 Nov 2026
  • Revised completionRevised to 30 Nov 2026 (originally 30 Jun 2025)
  • Buildings1 building record
  • Documents filed75 files

Current status

0%0 of 14 units booked
96.8%Work done, per cost certificate

Figures as on 5 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAHEJANANDNA5512214

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 95%.

SAHEJANAND: 77% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.73%

Progress on shared amenities15

As on 5 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed4

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots4
Closed/Covered4

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area180 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityCity and Industrial Development Corporation of Maharashtra
Permissible FSI269.06
Proposed, not sanctioned269 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNeel Empress, Plot 92/93, Sector- 1F, New Panvel East, Navi Mumbai-410206
Estimated costRs 97.75 lakh
Cost incurredRs 94.66 lakh
Work done96.84%
BuildingWingEstimatedIncurred
SAHEJANANDNARs 92.86 lakhRs 89.92 lakh
-NARs 4.89 lakhRs 4.73 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAtul Patel Architects
EngineerSK Consultants & Engineers
Chartered AccountantRutuja Narsingh & Associates
PartnerRole in project
Prasad Construction-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA01082621980Jun 2025 → Nov 2026

Reason as filed by the promoterWe, Prasad Construction, hereby declare the following with respect to the project Sahejanand bearing registration number P52000076845. registered under MahaRERA. The delay in the completion of the real estate project has been primarily caused by a delay in OC. The project is 100% completed, and we have received the Occupation Certificate (OC) on 17/02/2026 and we have also initiated the process for the possession as well. In view of this as the said project obtained full OC uploading consents from allottees will not be required. To provide assurance and facilitate a smooth completion process,

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - Sahejanand as on June 2025.pdf5 Aug 2026
Withdrawal Update Form 1File: Form 1 - Sahejanand as on June 2025.pdf5 Aug 2026
Withdrawal Update Form 1File: Form 1 - Sahejanand as on June 2025.pdf5 Aug 2026
Withdrawal Update Form 1File: Form 1 - Sahejanand as on June 2025.pdf5 Aug 2026
Withdrawal Update Form 2File: Form 2 - Sahejanand as on June 2025.pdf5 Aug 2026
Withdrawal Update Form 2File: Form 2 - Sahejanand as on June 2025.pdf5 Aug 2026
Withdrawal Update Form 2File: Form 2 - Sahejanand as on June 2025.pdf5 Aug 2026
Withdrawal Update Form 2File: Form 2 - Sahejanand as on June 2025.pdf5 Aug 2026
Withdrawal Update Form 3File: Form 3 - Sahejanand as on June 2025.pdf5 Aug 2026
Withdrawal Update Form 3File: Form 3 - Sahejanand as on June 2025.pdf5 Aug 2026
Withdrawal Update Form 3File: Form 3 - Sahejanand as on June 2025.pdf5 Aug 2026
Withdrawal Update Form 3File: Form 3 - Sahejanand as on June 2025.pdf5 Aug 2026
Form 2A (FY 2026-2027)File: Form 2A_25-26.pdf5 Aug 2026
Occupational CertificateFile: Occupancy Certificate.pdf5 Aug 2026
Occupational CertificateFile: OC Plan Highlighted.pdf5 Aug 2026
Occupational CertificateFile: OC Verification Mail Screenshot.pdf5 Aug 2026
Occupational CertificateFile: Commencement Certificate.pdf5 Aug 2026
Occupational CertificateFile: CC Plan.pdf5 Aug 2026
Form 2A (FY 2024-2025)File: Form 2A_24-25.pdf1 Aug 2026
Form 2A (FY 2025-2026)File: Form 2A_25-26.pdf1 Aug 2026
Form 5 (FY 2024-2025)File: Form 5 2024-25_.pdf1 Aug 2026
Form 5 (FY 2025-2026)File: Form 5 2024-25_.pdf1 Aug 2026
Withdrawal Update Form 1File: Form 1 - Sahejanand as on June 2025.pdf11 Oct 2025
Withdrawal Update Form 2File: Form 2 - Sahejanand as on June 2025.pdf11 Oct 2025
Withdrawal Update Form 3File: Form 3 - Sahejanand as on June 2025.pdf11 Oct 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - June 2024.pdf24 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sep 2024.pdf24 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Dec 2024.pdf24 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - March 2025.pdf24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - June 2024.pdf24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sep 2024.pdf24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Dec 2024.pdf24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - March 2025.pdf24 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Sahejanand_30-06-2024.pdf20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Sahejanand_30-09-2024.pdf20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sahejanand as on Dec 2024.pdf20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sahejanand as on March 2025.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sahejanand as on 30th June 2024.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sahejanand as on 30th September 2024.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sahejanand as on 31st December 2024.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sahejanand as on 31st March 2025.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sahejanand as on June 2024.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sahejanand as on Sep 2024.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sahejanand as on Dec 2024.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sahejanand as on March 2025.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Sahejanand_Dec 2024.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Sahejanand March 2025.pdf16 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: CC Verification.pdf7 Jun 2024
Copy of the legal title reportFile: 1 Copy of the legal title report.pdf29 May 2024
Proforma of Allotment letterFile: Rera Allotment-Plot No83-Pushpak.pdf29 May 2024
Deviation Report with respect to Allotment letterFile: Deviation Report_Allotment Letter.pdf29 May 2024
Deviation Report with respect to model copy of AgreementFile: AFS Deviation-Sahejanand.pdf29 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final First Form 3 - Sahejanand.pdf23 May 2024
Proforma of Agreement for saleFile: Final AFS-Sahejanand.pdf23 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A - Separate Bank Account Details.pdf23 May 2024
Details of encumbrances concerned to FinanceFile: Letter of encumbrance finance.pdf21 May 2024
Details of encumbrances concerned to FinanceFile: Encumbrance letter Legal.pdf21 May 2024
Details of encumbrances concerned to LegalFile: Letter of encumbrance finance.pdf21 May 2024
Details of encumbrances concerned to LegalFile: Encumbrance letter Legal.pdf21 May 2024
Declaration about Commencement CertificateFile: Declaration about CC_Format D.pdf21 May 2024
Declaration in FORM BFile: form B_11zon.pdf21 May 2024
CERSAI detailsFile: Cersai Declaration.pdf21 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: output.pdf21 May 2024
Other - LegalFile: Lease Deed_11zon.pdf21 May 2024
Other - LegalFile: Tiparty Agreement_11zon.pdf21 May 2024
Other - LegalFile: Partnership_Deed_Prasad_Construction.pdf21 May 2024
Other - TechnicalFile: Annotation 2024-05-29 153608.pdf21 May 2024
Layout approvalFile: Plot 83 layout_11zon.pdf18 May 2024
Building plan approvalFile: Plot 83 layout_11zon.pdf18 May 2024
PAN CardFile: Prasad Construction - PAN Copy.pdf18 May 2024
Copy of Layout Approval (in case of layout)File: Plot 83 layout_11zon.pdf18 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Plot 83 layout_11zon.pdf18 May 2024
Commencement Certificates / NA Order for plotted developmentFile: EXPIRED -Commencement Certificate.pdf18 May 2024
Commencement Certificates / NA Order for plotted developmentFile: Revalidate CC.pdf18 May 2024
Commencement Certificates / NA Order for plotted developmentFile: PCC Inward.pdf18 May 2024

How this compares with Raigarh

0%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 17 months
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAHEJANAND on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pushpak New5,900+ in Raigarh

2 kmSAHEJANANDCompleted 26Lapsed / revoked 3Other 8Dot size: filed unitsN

Filed coordinates, straight-line distance. 37 registered projects within 2 km.

Builder: Prasad Construction

Prasad Construction has 3 registrations on MahaRERA, including Prasad Nagar and Komal. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if SAHEJANAND is delayed beyond 30 Nov 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAHEJANAND?

The registered promoter entity is Prasad Construction, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAHEJANAND?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAHEJANAND?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAHEJANAND?

The professionals named in the filing: Architect: Atul Patel Architects; Engineer: SK Consultants & Engineers; Chartered Accountant: Rutuja Narsingh & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAHEJANAND?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAHEJANAND. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAHEJANAND to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.