Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
May 2027Possession promisedmoved 12 months from the original
5 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 95%
25 of 42Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 72 documents Report an error

Sahakar Co Operative Housing Society is a Others project by Punit Reality in Raigarh, Maharashtra, registered with MahaRERA as P52000047087 on 3 Oct 2022. Possession is promised by 31 May 2027. The completion date has moved by 12 months from the original filing. 17 of the 42 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameSahakar Co Operative Housing Society
  • TypeOthers
  • Location
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000047087
  • ReraGenie IDRG-MH-59009

Builder

  • NamePunit Reality
  • Entity typePartnership
  • PartnersNitin Jayaram Patil, Mayuresh Sudhir Kandpile, Jayesh Chimanlal Shah, Nikunj Rameshbhai Thakkar

Key dates

this monthRegisteredOct 2022First promiseMay 2026Revised toMay 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Oct 2022
  • Promised completion31 May 2027
  • Revised completionRevised to 31 May 2027 (originally 31 May 2026)
  • Buildings1 building record
  • Documents filed72 files

Current status

40%17 of 42 units booked
46.6%Work done, per cost certificate

Figures as on 20 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sahakar Co Operative Housing SocietyNA77301242

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.

Sahakar Co Operative Housing Society: 65% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%

Progress on shared amenities15

As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes85%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed51

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots51
Closed/Covered51

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area928 sq m
Land owned byNot the promoter
Named landowners1
LandownerVillageDistrict
Sahakar Co Operative Housing Society LimitedPanvelRaigarh

Approvals and building plan

Sanctioning authorityPANVEL MUNICIPAL CORPORATION
Permissible FSI2941.94
Proposed, not sanctioned2,937 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 6,7,8 Shree Balaji Ground Floor Near Pioneer Society Panvel 410206
Estimated costRs 8.69 cr
Cost incurredRs 4.05 cr
Work done46.62%
BuildingWingEstimatedIncurred
Sahakar Co Operative Housing SocietyNARs 8.26 crRs 4.01 cr
-NARs 43.46 lakhRs 4.05 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectO7 ASSOCIATES
EngineerSK CONSULTANTS AND ENGINEERS
Chartered AccountantNB SAYED AND ASSOCIATES
PartnerRole in project
Punit Reality-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA27052621107May 2026 → May 2027

Reason as filed by the promoterThe delay in the completion of the project and submission of this request has occurred due to procurement issues, financial constraints, and site-related challenges. Efforts are being undertaken to address these issues and complete the remaining work. Given the above circumstances, we kindly request the Hon’ble Authority to grant an extension of the project registration until 31/05/2027 to enable completion of the project and compliance with all applicable regulatory requirements.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Jun 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Jun 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 May 2027

Documents filed72

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - Sahakar_Co_Operative_Housing_Society June 2026.pdf20 Jul 2026
Withdrawal Update Form 2File: Form 2 - Sahakar_Co_Operative_Housing_Society June 2026.pdf20 Jul 2026
Withdrawal Update Form 3File: Form 3 - Sahakar_Co_Operative_Housing_Society June 2026.pdf20 Jul 2026
Layout approvalFile: Plan 1.pdf15 Jun 2026
Building plan approvalFile: Plan 2.pdf15 Jun 2026
Withdrawal Update Form 1File: Form 1 March 2026.pdf26 May 2026
Withdrawal Update Form 1File: Form 1 March 2026.pdf26 May 2026
Withdrawal Update Form 1File: Form 1 March 2026.pdf26 May 2026
Withdrawal Update Form 1File: Form 1 March 2026.pdf26 May 2026
Withdrawal Update Form 2File: Form 2 March 2026.pdf26 May 2026
Withdrawal Update Form 2File: Form 2 March 2026.pdf26 May 2026
Withdrawal Update Form 2File: Form 2 March 2026.pdf26 May 2026
Withdrawal Update Form 2File: Form 2 March 2026.pdf26 May 2026
Withdrawal Update Form 3File: Binder2.pdf26 May 2026
Withdrawal Update Form 3File: Binder2.pdf26 May 2026
Withdrawal Update Form 3File: Binder2.pdf26 May 2026
Withdrawal Update Form 3File: Binder2.pdf26 May 2026
Form 1File: Form 1 -Sahakar Co operative Soc as on March 2026.pdf18 Apr 2026
Form 2File: Form 2 -Sahakar Co operative Soc as on March 2026.pdf18 Apr 2026
Form 3File: Form 3 -Sahakar Co operative Soc as on March 2026.pdf18 Apr 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - SAHAKAR CHS as on Mar 2026.pdf18 Apr 2026
Form 1File: Form 1 - Sahakar CHS as on Dec 2025.pdf20 Jan 2026
Form 2File: Form 2 - Sahakar CHS as on Dec 2025.pdf20 Jan 2026
Form 3File: Form 3 - Sahakar CHS as on Dec 2025.pdf20 Jan 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Sahakar CHS as on Dec 2025.pdf20 Jan 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -Sahakar Co operative Soc_31-03-2025.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sahakar CHS as on March 2025.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sahakar CHS as on Dec 2024.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sahakar CHS as on Dec 2024.pdf13 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 of Sahakar CHS as on 31-03-2024.pdf13 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -Sahakar Co operative Soc_30-09-2024.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sahakar CHS as on Sept 2024.pdf17 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Sahakar CHS - FY 22-23.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sahakar CHS as on June 2024.pdf8 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sahakar CHS as on June 2024.pdf13 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -Sahakar Co operative Soc_30-06-2024.pdf13 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sahakar CHS as on March 2024.pdf10 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sahakar CHS as on March 2024.pdf10 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sahakar CHS as on March 2024.pdf3 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sahakar CHS as on Dec 2023.pdf18 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sahakar CHS as on Dec 2023.pdf9 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sahakar CHS as on Dec 2023.pdf8 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -Sahakar CHS as on Dec 2023.pdf8 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Sahakar CHS - FY 22-23.pdf4 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sahakar CHS as on March 2023.pdf28 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sahakar CHS as on June 2023.pdf28 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sahakar CHS as on Sep 2023.pdf28 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sahakar CHS as on March 2023.pdf28 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sahakar CHS as on June 2023.pdf28 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sahakar CHS as on Sep 2023.pdf28 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sahakar CHS as on March 2023.pdf28 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sahakar CHS as on June 2023.pdf28 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sahakar CHS as on Sep 2023.pdf28 Dec 2023
Copy of the legal title reportFile: Legal Title Report-Punit Realty_compressed.pdf22 Sep 2022
Details of encumbrances concerned to FinanceFile: Encumbrance -Finance -Punit.pdf22 Sep 2022
Details of encumbrances concerned to LegalFile: Encumbrance - Legal -Punit.pdf22 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -Sahakar CHS Signed by client.pdf22 Sep 2022
Proforma of Allotment letterFile: AFS_Sahakar CHS_21-09-2022.pdf22 Sep 2022
Proforma of Allotment letterFile: Allotment Letter_Sahakar CHS_21-09-2022.pdf22 Sep 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Scan2022-09-22_131451.pdf22 Sep 2022
Deviation Report with respect to Allotment letterFile: Deviation -Allotment Sahakar.pdf22 Sep 2022
Deviation Report with respect to model copy of AgreementFile: Deviation -Agreement -Punit.pdf22 Sep 2022
Proforma of Allotment letterFile: Model Agreement for Sale _ Sahakar CHS.pdf7 Jul 2022
Layout approvalFile: download (12)_rotated.pdf23 Jun 2022
Copy of Layout Approval (in case of layout)File: download (12)_rotated.pdf23 Jun 2022
CERSAI detailsFile: CERSAI_Search_Report_200240507744_For_Asset_Based_Search_23_06_2022_18_53_56_823.pdf23 Jun 2022
Building plan approvalFile: Plan 1.pdf18 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan 1.pdf18 Jun 2022
Declaration about Commencement CertificateFile: CC Declaration Sahakar .pdf17 Jun 2022
Declaration in FORM BFile: Form B Sahakar Promoter _compressed.pdf17 Jun 2022
PAN CardFile: Punit Realty Pancard .pdf16 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: CC Punit Reality_compressed (2).pdf16 Jun 2022

How this compares with Raigarh

40%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 12 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sahakar Co Operative Housing Society on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Panvel5,900+ in Raigarh

2 kmSahakar Co Operative HouCompleted 212Lapsed / revoked 57Other 133Dot size: filed unitsN

Filed coordinates, straight-line distance. 402 registered projects within 2 km.

Builder: Punit Reality

Punit Reality has 1 registration on MahaRERA, including Sahakar Co Operative Housing Society. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Sahakar Co Operative Housing Society is delayed beyond 31 May 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sahakar Co Operative Housing Society?

The registered promoter entity is Punit Reality, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sahakar Co Operative Housing Society?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sahakar Co Operative Housing Society?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sahakar Co Operative Housing Society?

The professionals named in the filing: Architect: O7 ASSOCIATES; Engineer: SK CONSULTANTS AND ENGINEERS; Chartered Accountant: NB SAYED AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sahakar Co Operative Housing Society?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sahakar Co Operative Housing Society. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sahakar Co Operative Housing Society to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.